This skill should be used when the user asks to "show the board", "what is on the board", "what is in this sprint", "move this to in progress", "put this piece in the sprint", "what is blocked", "create an issue on the board", or invokes /squad:board. It reads and changes the project board through the Squad tracker.
- License 许可
- Apache-2.0
- 所属仓库
- josemodena/squad
- 最近更新
- 2026-11-02
- Stars
- ★ 1
- Forks
- 0
01 前言 Front Matter
- name
- board
- description
- This skill should be used when the user asks to "show the board", "what is on the board", "what is in this sprint", "move this to in progress", "put this piece in the sprint", "what is blocked", "create an issue on the board", or invokes /squad:board. It reads and changes the project board through the Squad tracker.
03 SKILL.md 正文
The board is the state
Progress lives in issues and on the project board, never in a file. Every piece of work is an issue whose body is its plan. A session that moves a piece and does not move its card has not finished.
All of it goes through one script, which reads the project's settings for the repository, the board, the tracks, the owners and the statuses:
bash ${CLAUDE_PLUGIN_ROOT}/scripts/squad.sh <command>
Reading it
squad.sh board # every column, every card
squad.sh board --sprint "Sprint 3" # one sprint only
squad.sh settings # the tracks, owners and statuses this project uses
An empty board prints "The board is empty." That is a real answer, not an error.
Changing it
squad.sh issue "<title>" --track <track> --owner <owner> --estimate 4 --body-file plan.md
squad.sh move <issue> "In progress"
squad.sh sprint <issue> "Sprint 3"
squad.sh needed-by <issue> 2026-10-31
squad.sh place <issue> --sprint "Sprint 3" --status "In progress" --estimate 2
issue creates the issue with its track:* and owner:* labels, puts it on
the board and sets Track, Owner, Status and the estimate. The track and the
owner must be ones this project has; squad.sh settings lists them.
The rules that go with it
- Write the plan in the issue body from the piece template, with the acceptance test written before the work starts. A deliverable that cannot be tested is an intention.
- Scope found in the middle of a piece becomes a new issue in Backlog. It is never absorbed into the piece in hand.
- A blocker is a structured record written with
blocker.sh set ISSUE --file JSON: category, owner, exact next action, why, PM recommendation, evidence and whether the user is needed. It is visible in the issue and through board labels. - User-owned actions have an orange
🟠 needs-your-actionlabel and the configured decider label. Useblocker.sh visibilityto show Labels in existing views. Preserve explicit Status on existing cards. Separately agreed user-action cards may use the existing Blocked column; do not create another column. - Resolve only using actual input/authority evidence through
blocker.sh resolve; never infer permission from quota policy or infer completion from issue closure. - Quota readings are comments on the sprint issue, never commits.
Use squad.sh ready for eligibility with exclusion reasons, field ISSUE NAME VALUE for typed metadata, and dependency list|add|remove ISSUE [PREREQUISITE] for native prerequisites. Status is the state of a piece; Stage and Responsible role exist only with job_runtime: on. Needed by and Forecast finish have different meanings.
Before board migration or recovery, use board-backup.sh snapshot and retain the
printed path. Option IDs carry item identity: never rebuild an existing option
list from names. Use the provided helpers, which preserve IDs and back up writes.
For recovery, run board-backup.sh restore FILE --dry-run, present the complete
plan and blockers, and obtain explicit confirmation of that plan before applying
with --apply --confirm PROJECT_NODE_ID --plan CONFIRMATION_HASH from the preview. Existing explicit approval of that exact
repair suffices. Never infer missing historical statuses from issue closure.
GitHub restore is not atomic; inspect the journal after failure and reconcile a
fresh dry-run rather than replaying the whole operation. Backups are private local
Git repositories scoped by host/owner/project number, retained until explicit cleanup.
04 同仓库更多 Skills
review
Compatibility alias for the Squad engineering-reviewer role.
retro
This skill should be used when the user asks to "run the retrospective", "do the retro", "close the sprint", "what did the sprint cost", "estimate versus actual", or invokes $squad:retro. It runs the retrospective conversation with the Decider and writes the one issue that comes out of it.
quota
Read Squad capacity and effective policy, persist an authorised quota override, or explain why work cannot launch.
project-manager
Plan Squad delivery with the user, maintain sequencing, dependencies, role assignments and forecasts, and run planning and retrospectives.
plan
This skill should be used when the user asks to "run sprint planning", "plan the sprint", "start a new sprint", "what are we doing this week", "write the sprint issue", or invokes $squad:plan. It runs the planning conversation with the Decider and writes the one issue that comes out of it.
operate
Compatibility entry for the main Squad Project Manager session. Launches the correctly configured PM; does not assume or change the current model.