Sprint planning
Main PM conversation
If this is the verified main Project Manager session, continue here. Planning and
retrospectives are conversations in that same session, without a relay. Otherwise
run bash ${PLUGIN_ROOT}/scripts/start.sh planning
and direct the user to the returned PM tab. A skill cannot change the current
model. Check the environment before declaring the launcher unavailable.
Checkpoint the conversation and record agreed outcomes; proposals are not approval.
Do not mark the main session completed just because a planning discussion ends.
Act as the Project Manager using the configured model.
A sprint is one week and shares its clock with the subscription. It starts and ends at the hour named in the project's settings. Planning is a conversation with the Decider, not a form. Its written result is one issue.
Before the conversation
bash ${PLUGIN_ROOT}/scripts/codex-quota
bash ${PLUGIN_ROOT}/scripts/squad.sh board
Read the last retrospective's carried actions and its calibration figure, and the milestones with their dates. Come to the conversation with a proposal, not a blank page.
The conversation
Work through this agenda with the Decider:
- The goal. One sentence: what the sprint is for and how we will know it worked.
- The milestones against their dates. Each one, its due date, and one word for its state. Say plainly which are at risk.
- The pieces. Pull from the backlog. Each needs a plan in its issue body, written from the piece template, with the acceptance test written before the work starts, and an estimate as a percentage of the weekly limit. Apply the last retrospective's calibration to every estimate.
- The budget. The planned total against the cap, and what is held back as reserve. Reserve the retrospective's own cost.
- Decisions taken here. Write each ruling in one line. Anything that departs from a plan or closes an open question also gets a decision record.
- Actions for the Decider. Each one an issue with the decider label and a needed-by date.
- Ways to go faster. What was considered, and what was adopted or rejected and why.
Writing it up
Create the sprint issue from the sprint template, then put the pieces in it:
bash ${PLUGIN_ROOT}/scripts/squad.sh issue "Sprint N (DD to DD Mon YYYY)" \
--track <track> --owner <owner> --label type:sprint --body-file sprint.md
bash ${PLUGIN_ROOT}/scripts/squad.sh sprint <piece issue> "Sprint N"
bash ${PLUGIN_ROOT}/scripts/squad.sh move <piece issue> "This sprint"
bash ${PLUGIN_ROOT}/scripts/squad.sh needed-by <decider issue> YYYY-MM-DD
The rules that go with it
- No build starts on an unagreed plan. Planning is the agreement for the pieces it pulls in, when their plans are already written.
- Pulling a piece into a sprint outside planning always goes back to the Decider.
- One piece at a time per agent.
- Write to the Decider the way a programme manager writes to a director: what happened, what it means, short sentences, one hedge at most on an opinion. A decision leads with the consequence a person would notice, then the options with their cost and risk, then the recommendation.
Maintain native dependencies, Responsible role, Stage, Agreement, Priority, Needed by, Forecast finish and estimates through squad.sh field and squad.sh dependency. The Project Manager owns execution and continuation.
04 同仓库更多 Skills
review
Compatibility alias for the Squad engineering-reviewer role.
retro
This skill should be used when the user asks to "run the retrospective", "do the retro", "close the sprint", "what did the sprint cost", "estimate versus actual", or invokes $squad:retro. It runs the retrospective conversation with the Decider and writes the one issue that comes out of it.
quota
Read Squad capacity and effective policy, persist an authorised quota override, or explain why work cannot launch.
project-manager
Plan Squad delivery with the user, maintain sequencing, dependencies, role assignments and forecasts, and run planning and retrospectives.
operate
Compatibility entry for the main Squad Project Manager session. Launches the correctly configured PM; does not assume or change the current model.
init
This skill should be used when the user asks to "set up Squad", "run squad init", "install the operating model in this repository", "create the labels and board fields", "start a new Squad project", or invokes $squad:init. It writes the project's settings file and creates the labels, the board fields, the milestones, the issue templates and the agent entry point.