[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M7FBF6W9FTS2Z3PFPF9EJP5X":3,"skill-same:01M7FBF6W9FTS2Z3PFPF9EJP5X":53},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":16,"categories":17,"keywords":18,"publishedAt":19,"linkOnly":20,"markdownContent":21,"markdownBody":22,"frontMatter":23,"refName":24,"commitSha":25,"skillDirectory":26,"forksCount":27,"repositoryHtmlUrl":28,"repositoryHomepageUrl":29,"ownerHtmlUrl":30,"ownerBlogUrl":6,"ownerDescription":31,"updatedAt":32,"install":33,"resources":46},"01M7FBF6W9FTS2Z3PFPF9EJP5X","schedule-development-and-analysis",null,"Builds and interrogates a project schedule — logic-driven sequencing, dependency types and lags, float and the critical path, resource loading and leveling, schedule risk analysis, and measuring progress against a baseline rather than against optimism. Use this to construct a schedule, audit one you have inherited, find out why a plan keeps slipping, work out what a date change actually costs, or judge whether a reported percentage complete means anything.","siddu1004\u002FSFP","siddu1004","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F260113491?v=4","01M7F8W1SAJAR49097VRTE1TW5","Siddhardh Vanguri","01M7F8W1SYGY7JE15AHAECCT9R",5,"MIT","https:\u002F\u002Fgithub.com\u002Fsiddu1004\u002FSFP\u002Fblob\u002Fmain\u002Fplugins\u002Fbusiness-ops\u002Fskills\u002Fschedule-development-and-analysis\u002FSKILL.md",[],[],"2026-11-16 10:05:34",false,"---\nname: schedule-development-and-analysis\ndescription: Builds and interrogates a project schedule — logic-driven sequencing, dependency types and lags, float and the critical path, resource loading and leveling, schedule risk analysis, and measuring progress against a baseline rather than against optimism. Use this to construct a schedule, audit one you have inherited, find out why a plan keeps slipping, work out what a date change actually costs, or judge whether a reported percentage complete means anything.\n---\n\n# Schedule development and analysis\n\nA schedule is a model of how work connects. Most schedules in circulation are a list of dates\nsomeone typed, which looks the same in a status deck and behaves completely differently when\nanything moves.\n\n## Build it from logic, not from dates\n\nEvery task except the first and last should be connected to something. A task with a date and no\npredecessor is an assertion; a task with a predecessor is a plan, because when the predecessor\nmoves the task moves with it and the schedule tells you so.\n\n- **Finish-to-start** is the default and covers most real dependencies.\n- **Start-to-start and finish-to-finish** describe overlapping work honestly and are worth using\n  rather than faking the overlap with an earlier date.\n- **Lags** should represent something real — curing time, a notice period, a review window. A lag\n  used to make dates line up is a hidden assumption.\n\n**Hard-coded date constraints are where schedules go to die.** Each one severs the logic at that\npoint, so slippage upstream stops propagating and the schedule keeps reporting a date it can no\nlonger support.\n\n## Float is the information, and the critical path is the consequence\n\nFloat is how long a task can slip before it moves the end date. The critical path is the chain with\nnone. Attention belongs there and almost nowhere else — expediting work with three weeks of float\nbuys nothing and consumes the same management capacity.\n\nTwo readings worth taking regularly: **near-critical chains**, which become critical after one bad\nweek and are where surprises come from, and **negative float**, which means the schedule is already\ntelling you the date is impossible and someone has not looked.\n\n## Load resources before you believe the dates\n\nA schedule that assumes the same three people work on five parallel tasks is fiction that will\nresolve itself as a delay. Load the named constraint — the one team, the one approver, the one\nenvironment — and level it. Leveling extends the schedule; that extension was always there, it was\njust unrecorded.\n\n## Analyze schedule risk rather than adding a buffer at the end\n\nDurations are ranges. Running the schedule with ranges rather than single durations shows something\na buffer cannot: paths that merge. Where several chains converge on one milestone, the milestone\nwaits for the latest of them, so the probability of hitting the date is far lower than the\nprobability of any single chain hitting its own — which is why plans with many parallel workstreams\nslip even when no individual stream looks late.\n\nA buffer at the end of the plan protects the end date. A buffer in front of each merge point\nprotects the plan.\n\n## Measure progress against the baseline, not against effort\n\nKeep a baseline and compare to it, or \"we are 70% done\" has nothing to be 70% of.\n\nThe useful comparison is three-way: what was planned to be complete by now, what is actually\ncomplete, and what it cost to get there. Those three answer different questions — the first two\ngive you schedule performance, the last two give you cost performance, and a project can be ahead\non one and badly behind on the other.\n\n**Percentage complete on in-progress work is where reporting rots.** A task reported at 90% for\nthree weeks is not 90% complete. Binary reporting — not started, in progress, done — with small\nenough tasks that \"done\" arrives often is more honest and takes less time to maintain.\n\n## Auditing a schedule you inherited\n\nLook for these in order, because each one invalidates everything after it: tasks with no\npredecessor or successor, hard date constraints, negative float, durations longer than a reporting\nperiod, tasks that have been 90% complete for more than one period, and a baseline that has been\nre-set so often it no longer means anything.\n\n## Sources\n\n`references\u002Fsources.md` in this skill lists the outside authorities that settle the questions\nhere — what each one is authoritative for, and what you may do with it. Check them before\nanswering on anything they cover, and cite what you used. Most are free to read and not free\nto reproduce; the use note on each is binding.\n\n## Never\n\n- Accept a date on a task with no logic behind it.\n- Hard-code a constraint to make a date hold. It stops the schedule from telling you the truth.\n- Report percentage complete on a task whose remaining work nobody has re-estimated.\n- Re-baseline to make variance disappear. Re-baseline when scope genuinely changed, and say which.\n","# Schedule development and analysis\n\nA schedule is a model of how work connects. Most schedules in circulation are a list of dates\nsomeone typed, which looks the same in a status deck and behaves completely differently when\nanything moves.\n\n## Build it from logic, not from dates\n\nEvery task except the first and last should be connected to something. A task with a date and no\npredecessor is an assertion; a task with a predecessor is a plan, because when the predecessor\nmoves the task moves with it and the schedule tells you so.\n\n- **Finish-to-start** is the default and covers most real dependencies.\n- **Start-to-start and finish-to-finish** describe overlapping work honestly and are worth using\n  rather than faking the overlap with an earlier date.\n- **Lags** should represent something real — curing time, a notice period, a review window. A lag\n  used to make dates line up is a hidden assumption.\n\n**Hard-coded date constraints are where schedules go to die.** Each one severs the logic at that\npoint, so slippage upstream stops propagating and the schedule keeps reporting a date it can no\nlonger support.\n\n## Float is the information, and the critical path is the consequence\n\nFloat is how long a task can slip before it moves the end date. The critical path is the chain with\nnone. Attention belongs there and almost nowhere else — expediting work with three weeks of float\nbuys nothing and consumes the same management capacity.\n\nTwo readings worth taking regularly: **near-critical chains**, which become critical after one bad\nweek and are where surprises come from, and **negative float**, which means the schedule is already\ntelling you the date is impossible and someone has not looked.\n\n## Load resources before you believe the dates\n\nA schedule that assumes the same three people work on five parallel tasks is fiction that will\nresolve itself as a delay. Load the named constraint — the one team, the one approver, the one\nenvironment — and level it. Leveling extends the schedule; that extension was always there, it was\njust unrecorded.\n\n## Analyze schedule risk rather than adding a buffer at the end\n\nDurations are ranges. Running the schedule with ranges rather than single durations shows something\na buffer cannot: paths that merge. Where several chains converge on one milestone, the milestone\nwaits for the latest of them, so the probability of hitting the date is far lower than the\nprobability of any single chain hitting its own — which is why plans with many parallel workstreams\nslip even when no individual stream looks late.\n\nA buffer at the end of the plan protects the end date. A buffer in front of each merge point\nprotects the plan.\n\n## Measure progress against the baseline, not against effort\n\nKeep a baseline and compare to it, or \"we are 70% done\" has nothing to be 70% of.\n\nThe useful comparison is three-way: what was planned to be complete by now, what is actually\ncomplete, and what it cost to get there. Those three answer different questions — the first two\ngive you schedule performance, the last two give you cost performance, and a project can be ahead\non one and badly behind on the other.\n\n**Percentage complete on in-progress work is where reporting rots.** A task reported at 90% for\nthree weeks is not 90% complete. Binary reporting — not started, in progress, done — with small\nenough tasks that \"done\" arrives often is more honest and takes less time to maintain.\n\n## Auditing a schedule you inherited\n\nLook for these in order, because each one invalidates everything after it: tasks with no\npredecessor or successor, hard date constraints, negative float, durations longer than a reporting\nperiod, tasks that have been 90% complete for more than one period, and a baseline that has been\nre-set so often it no longer means anything.\n\n## Sources\n\n`references\u002Fsources.md` in this skill lists the outside authorities that settle the questions\nhere — what each one is authoritative for, and what you may do with it. Check them before\nanswering on anything they cover, and cite what you used. Most are free to read and not free\nto reproduce; the use note on each is binding.\n\n## Never\n\n- Accept a date on a task with no logic behind it.\n- Hard-code a constraint to make a date hold. It stops the schedule from telling you the truth.\n- Report percentage complete on a task whose remaining work nobody has re-estimated.\n- Re-baseline to make variance disappear. Re-baseline when scope genuinely changed, and say which.\n",{"name":5,"description":7},"main","15fa5201935d2b1d172b4e61c2360c908d876d20","plugins\u002Fbusiness-ops\u002Fskills\u002Fschedule-development-and-analysis",0,"https:\u002F\u002Fgithub.com\u002Fsiddu1004\u002FSFP","https:\u002F\u002Fwww.npmjs.com\u002Fpackage\u002Fsfp-hive","https:\u002F\u002Fgithub.com\u002Fsiddu1004","I am a student at Amrita Vishwa Vidyapeetham pursuing my BTECH degree in Electronics and Electrical Engineering (2024-2028).","2026-11-09 16:04:40",{"source":8,"skillName":5,"commands":34,"prompt":44,"zipAvailable":45},[35,38,41],{"tool":36,"command":37},"npx","npx skills add siddu1004\u002FSFP --skill schedule-development-and-analysis",{"tool":39,"command":40},"bunx","bunx skills add siddu1004\u002FSFP --skill schedule-development-and-analysis",{"tool":42,"command":43},"pnpm","pnpm dlx skills add siddu1004\u002FSFP --skill schedule-development-and-analysis","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002Fsiddu1004\u002FSFP\u002Fblob\u002Fmain\u002Fplugins\u002Fbusiness-ops\u002Fskills\u002Fschedule-development-and-analysis\u002FSKILL.md",true,[47],{"path":48,"resourceType":49,"resourceTypeDesc":50,"sizeBytes":51,"sourceHtmlUrl":52},"references\u002Fsources.md","REFERENCE","参考文档",983,"https:\u002F\u002Fgithub.com\u002Fsiddu1004\u002FSFP\u002Fblob\u002Fmain\u002Fplugins\u002Fbusiness-ops\u002Fskills\u002Fschedule-development-and-analysis\u002Freferences\u002Fsources.md",[54,61,68,75,82,89],{"skillNo":55,"name":56,"nameZh":6,"description":57,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":58,"categories":59,"keywords":60,"publishedAt":19},"01M7FEEDADZBNBVY19H3XZKCBQ","scientific-schematics","Generates scientific diagram drafts using Nano Banana 2 AI with smart iterative refinement. Uses Gemini 3.7 Flash for quality review. Refines when the review requests improvement, with at most two generations. Specialized in neural network architectures, system diagrams, flowcharts, biological pathways, and complex scientific visualizations.","https:\u002F\u002Fgithub.com\u002Fsiddu1004\u002FSFP\u002Fblob\u002Fmain\u002Fplugins\u002Fscience-hardware\u002Fskills\u002Fscientific-schematics\u002FSKILL.md",[],[],{"skillNo":62,"name":63,"nameZh":6,"description":64,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":65,"categories":66,"keywords":67,"publishedAt":19},"01M7FEE0JS04FE58MST48D0MMC","polyhaven-texture-apply","Apply realistic PBR textures from PolyHaven to any Blender object. Supports metals, wood, concrete, fabric, and more. Trigger when asked to texture an object, apply a material from PolyHaven, make something look like metal\u002Fwood\u002Fmarble, or change object surface.","https:\u002F\u002Fgithub.com\u002Fsiddu1004\u002FSFP\u002Fblob\u002Fmain\u002Fplugins\u002Fscience-hardware\u002Fskills\u002Fpolyhaven-texture-apply\u002FSKILL.md",[],[],{"skillNo":69,"name":70,"nameZh":6,"description":71,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":72,"categories":73,"keywords":74,"publishedAt":19},"01M7FEDJRWV194TY411WVRS84W","polyhaven-studio-setup","Set up a professional product photography studio in Blender using PolyHaven HDRIs and PBR ground materials. Trigger when asked to create a studio setup, add HDRI lighting, set up product photography, or create a showroom scene.","https:\u002F\u002Fgithub.com\u002Fsiddu1004\u002FSFP\u002Fblob\u002Fmain\u002Fplugins\u002Fscience-hardware\u002Fskills\u002Fpolyhaven-studio-setup\u002FSKILL.md",[],[],{"skillNo":76,"name":77,"nameZh":6,"description":78,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":79,"categories":80,"keywords":81,"publishedAt":19},"01M7FED5H2FGS50XGETMGSM0RV","polyhaven-scene-builder","Build complete product scenes using PolyHaven assets — HDRI environment, textured ground\u002Fpedestal, and optional props from the 3D model library. Trigger when asked to build a product scene, create a showcase setup, add a pedestal, or compose a product shot.","https:\u002F\u002Fgithub.com\u002Fsiddu1004\u002FSFP\u002Fblob\u002Fmain\u002Fplugins\u002Fscience-hardware\u002Fskills\u002Fpolyhaven-scene-builder\u002FSKILL.md",[],[],{"skillNo":83,"name":84,"nameZh":6,"description":85,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":86,"categories":87,"keywords":88,"publishedAt":19},"01M7FECSNZ2CJA7Z8TPE5R844R","polyhaven-material-swap","Cycle through multiple PolyHaven materials on a product and render each variant. Great for showing color\u002Ffinish options. Trigger when asked to show material variants, swap textures, create color options, show finish comparisons, or render product in different materials.","https:\u002F\u002Fgithub.com\u002Fsiddu1004\u002FSFP\u002Fblob\u002Fmain\u002Fplugins\u002Fscience-hardware\u002Fskills\u002Fpolyhaven-material-swap\u002FSKILL.md",[],[],{"skillNo":90,"name":91,"nameZh":6,"description":92,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":93,"categories":94,"keywords":95,"publishedAt":19},"01M7FECBPQ6YWH48PYAMS0C5CE","polyhaven-hdri-showcase","Render the same product across multiple HDRI environments and output a comparison grid. Trigger when asked to compare lighting setups, test different environments, show product in multiple settings, or create an HDRI comparison.","https:\u002F\u002Fgithub.com\u002Fsiddu1004\u002FSFP\u002Fblob\u002Fmain\u002Fplugins\u002Fscience-hardware\u002Fskills\u002Fpolyhaven-hdri-showcase\u002FSKILL.md",[],[]]