change-and-adoption
Gets people to actually use what was delivered — stakeholder analysis, communication, training, resistance, and measuring adoption. Use this to plan a rollout, recover an implementation nobody is using, handle resistance to a change, sequence communications, or work out why a technically successful project changed nothing.
- License 许可
- MIT
- 所属仓库
- siddu1004/SFP
- 最近更新
- 2026-11-09
- Stars
- ★ 5
- Forks
- 0
01 前言 Front Matter
- name
- change-and-adoption
- description
- Gets people to actually use what was delivered — stakeholder analysis, communication, training, resistance, and measuring adoption. Use this to plan a rollout, recover an implementation nobody is using, handle resistance to a change, sequence communications, or work out why a technically successful project changed nothing.
02 资源文件 1
- 参考文档references/sources.md903 B
03 SKILL.md 正文
Change and adoption
The characteristic expensive failure is a system delivered on time, on budget, to specification, and not used. The project succeeded and the investment did not.
Map who is affected and what it costs them
Stakeholder analysis usually stops at influence and interest. The operative question is what each group loses: status, autonomy, expertise that took years to build, a workaround they were proud of, or simply a routine that worked.
Resistance is almost always rational from where the person stands. Treating it as ignorance produces more communication aimed at the wrong problem, and confirms to the affected group that nobody understands their work.
Communicate in the order people need
The sequence that works is why, then what, then how, then when — and organizations reliably lead with what and when, which is the project's perspective rather than the audience's.
State what is changing for this audience specifically. A general announcement is heard as not applying to anyone in particular.
Be honest about costs. A change presented as pure benefit, where the audience can see the cost, loses the credibility needed for everything said afterwards. Naming the downside is what makes the upside believable.
Local credibility beats hierarchy
People adopt what respected colleagues adopt. A message from an executive establishes that the change is sanctioned; it does not establish that it is sensible.
Find the people others actually ask, involve them early enough to influence the outcome, and let them carry it. Involvement after the decisions are made is recognized as decoration and costs more credibility than it buys.
Train at the moment of use
Training delivered weeks ahead of availability is forgotten. Deliver close to go-live, in the context of the real work, with support available in the first days when everyone hits the same three obstacles.
people:learning-and-development covers building durable capability; this is landing a specific
change.
Measure adoption, not deployment
Licenses deployed, accounts created and sessions logged measure nothing about whether the work changed. Measure the behavior: is the new process being followed, is the old path still being used, have the outcomes moved?
Watch for the workaround. Where people have quietly kept the old spreadsheet, adoption is nominal — and the workaround is data about what the new system fails to do, not merely non-compliance.
Adoption is the mechanism by which pmo:benefits-realization becomes possible; without it there is
nothing to realize.
Sources
references/sources.md in this skill lists the outside authorities that settle the questions
here — what each one is authoritative for, and what you may do with it. Check them before
answering on anything they cover, and cite what you used. Most are free to read and not free
to reproduce; the use note on each is binding.
Never
- Treat resistance as a communication deficit without asking what the change costs.
- Lead with what and when instead of why.
- Involve influential users only after the decisions are made.
- Report adoption from deployment statistics.
04 同仓库更多 Skills
scientific-schematics
Generates scientific diagram drafts using Nano Banana 2 AI with smart iterative refinement. Uses Gemini 3.7 Flash for quality review. Refines when the review requests improvement, with at most two generations. Specialized in neural network architectures, system diagrams, flowcharts, biological pathways, and complex scientific visualizations.
polyhaven-texture-apply
Apply realistic PBR textures from PolyHaven to any Blender object. Supports metals, wood, concrete, fabric, and more. Trigger when asked to texture an object, apply a material from PolyHaven, make something look like metal/wood/marble, or change object surface.
polyhaven-studio-setup
Set up a professional product photography studio in Blender using PolyHaven HDRIs and PBR ground materials. Trigger when asked to create a studio setup, add HDRI lighting, set up product photography, or create a showroom scene.
polyhaven-scene-builder
Build complete product scenes using PolyHaven assets — HDRI environment, textured ground/pedestal, and optional props from the 3D model library. Trigger when asked to build a product scene, create a showcase setup, add a pedestal, or compose a product shot.
polyhaven-material-swap
Cycle through multiple PolyHaven materials on a product and render each variant. Great for showing color/finish options. Trigger when asked to show material variants, swap textures, create color options, show finish comparisons, or render product in different materials.
polyhaven-hdri-showcase
Render the same product across multiple HDRI environments and output a comparison grid. Trigger when asked to compare lighting setups, test different environments, show product in multiple settings, or create an HDRI comparison.