Matches operational capacity to expected demand — forecasting load, sizing teams and systems, managing queues, and deciding when to add capacity. Use this to plan staffing for expected volume, diagnose a queue that keeps growing, size support or fulfillment capacity, or decide whether a bottleneck needs more capacity or better flow.

License 许可
MIT
所属仓库
siddu1004/SFP
最近更新
2026-11-09
Stars
★ 5
Forks
0

01 前言 Front Matter

name
capacity-and-demand-planning
description
Matches operational capacity to expected demand — forecasting load, sizing teams and systems, managing queues, and deciding when to add capacity. Use this to plan staffing for expected volume, diagnose a queue that keeps growing, size support or fulfillment capacity, or decide whether a bottleneck needs more capacity or better flow.

02 资源文件 1

03 SKILL.md 正文

Capacity and demand planning

This is operational throughput — how much work the organization can absorb. Allocating people across projects is portfolio work, handled in pmo:portfolio-governance.

Forecast demand honestly

Separate the three components, because they need different treatment:

  • Baseline — the steady rate, best estimated from your own history rather than from a plan.
  • Trend — the direction, measured over enough periods to distinguish it from noise.
  • Spikes — launches, seasonality, campaigns, incidents. Known spikes are a planning input; unknown ones are what headroom is for.

Forecast in the unit the work actually arrives in — tickets, orders, shipments, minutes of handling — not in revenue. Revenue divided by an average is a forecast of an average, and averages are where capacity planning goes to die.

Capacity is not headcount

Usable capacity is people multiplied by available hours multiplied by the fraction spent on the work in question. The last term is the one everyone omits and it is rarely above 70%: meetings, training, holiday, and the interruptions that come with the job are real.

Plan against realistic effective capacity. Planning at 100% guarantees the plan fails on its first ordinary week.

Queues tell you before the dashboard does

Utilization above roughly 80% makes wait times rise sharply and non-linearly — a system at 95% is not slightly slower than one at 85%, it is qualitatively worse. This is why "we have spare capacity on paper" coexists with a queue that never clears.

Watch the trend in queue age, not the queue length. A stable-length queue whose oldest item keeps getting older is a queue that is quietly failing its slowest customers.

Add capacity or fix flow

Before adding capacity, establish which it is:

  • Genuine capacity shortfall — arrival rate exceeds service rate at reasonable utilization. Add capacity.
  • Flow problem — rework, handoffs, waiting on another team, batching. Adding capacity here adds cost and often makes throughput worse by increasing coordination. Send this to operations:process-design.

The tell: if work spends most of its life waiting rather than being worked, it is a flow problem.

Sources

references/sources.md in this skill lists the outside authorities that settle the questions here — what each one is authoritative for, and what you may do with it. Check them before answering on anything they cover, and cite what you used. Most are free to read and not free to reproduce; the use note on each is binding.

Never

  • Plan against nominal headcount rather than effective capacity.
  • Run a critical queue at sustained high utilization and treat the wait times as a mystery.
  • Add capacity to a process you have not measured.
  • Forecast in aggregate currency when work arrives in discrete units.

04 同仓库更多 Skills

siddu1004
siddu1004/SFP

scientific-schematics

Generates scientific diagram drafts using Nano Banana 2 AI with smart iterative refinement. Uses Gemini 3.7 Flash for quality review. Refines when the review requests improvement, with at most two generations. Specialized in neural network architectures, system diagrams, flowcharts, biological pathways, and complex scientific visualizations.

★ 5
siddu1004
siddu1004/SFP

polyhaven-texture-apply

Apply realistic PBR textures from PolyHaven to any Blender object. Supports metals, wood, concrete, fabric, and more. Trigger when asked to texture an object, apply a material from PolyHaven, make something look like metal/wood/marble, or change object surface.

★ 5
siddu1004
siddu1004/SFP

polyhaven-studio-setup

Set up a professional product photography studio in Blender using PolyHaven HDRIs and PBR ground materials. Trigger when asked to create a studio setup, add HDRI lighting, set up product photography, or create a showroom scene.

★ 5
siddu1004
siddu1004/SFP

polyhaven-scene-builder

Build complete product scenes using PolyHaven assets — HDRI environment, textured ground/pedestal, and optional props from the 3D model library. Trigger when asked to build a product scene, create a showcase setup, add a pedestal, or compose a product shot.

★ 5
siddu1004
siddu1004/SFP

polyhaven-material-swap

Cycle through multiple PolyHaven materials on a product and render each variant. Great for showing color/finish options. Trigger when asked to show material variants, swap textures, create color options, show finish comparisons, or render product in different materials.

★ 5
siddu1004
siddu1004/SFP

polyhaven-hdri-showcase

Render the same product across multiple HDRI environments and output a comparison grid. Trigger when asked to compare lighting setups, test different environments, show product in multiple settings, or create an HDRI comparison.

★ 5