[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M7F9BC5NPJN4R33ST84Z8K0T":3,"skill-same:01M7F9BC5NPJN4R33ST84Z8K0T":63},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":16,"categories":17,"keywords":18,"publishedAt":19,"linkOnly":20,"markdownContent":21,"markdownBody":22,"frontMatter":23,"refName":43,"commitSha":44,"skillDirectory":45,"forksCount":14,"repositoryHtmlUrl":46,"repositoryHomepageUrl":46,"ownerHtmlUrl":47,"ownerBlogUrl":6,"ownerDescription":6,"updatedAt":48,"install":49,"resources":62},"01M7F9BC5NPJN4R33ST84Z8K0T","modeling-project-finance-structures",null,"Builds project finance models with construction period draws, operational cash flows, DSCR covenants, and sculpted debt repayment. Use when modeling project finance, calculating debt service coverage, or structuring project lending.","Mr-Nobody-Anonymous\u002FAll-skills","Mr-Nobody-Anonymous","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F184253119?v=4","01M7AEXFJHKTYQW5R0ZCQQTWFV","anonymous","01M7C00M3GQR4QKP9GZA42GFAK",0,"Apache-2.0","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Ffinance\u002Fmodeling-project-finance-structures\u002FSKILL.md",[],[],"2026-11-16 10:05:34",false,"---\nname: modeling-project-finance-structures\nlanguage: en\ndescription: Builds project finance models with construction period draws, operational cash flows, DSCR covenants, and sculpted debt repayment. Use when modeling project finance, calculating debt service coverage, or structuring project lending.\ntags:\n  - modeling\n  - infrastructure-and-project-finance\nmetadata:\n  author: casemark\n  practice_areas:\n    - Project Finance\n    - Infrastructure Investment\n    - PPP\n  document_types:\n    - Financial Model\n  skill_modes:\n    - Modeling\n    - Forecasting\nsource: \"https:\u002F\u002Fgithub.com\u002FCaseMark\u002Fskills\"\nsource_repository: \"CaseMark\u002Fskills\"\nsource_path: \"skills\u002Fcapital\u002Fmodeling-project-finance-structures\u002FSKILL.md\"\nlicense: \"Apache-2.0\"\nimported_at: \"2026-09-20\"\n---\n# Modeling Project Finance Structures\n\n## When To Use\n\n- Modeling a non-recourse or limited-recourse project financing (power plants, toll roads, LNG terminals, renewables, PPP\u002FPFI concessions)\n- Sizing senior debt tranches against projected cash flows and DSCR \u002F LLCR covenants\n- Structuring construction-period draws, equity contributions, and IDC capitalization\n- Evaluating sculpted vs. level debt repayment profiles\n- Running sensitivities for lender presentations, credit committee packages, or investment committee memos\n- Assessing refinancing scenarios or mini-perm bullet structures\n\n## Inputs To Gather\n\n- **Project parameters**: capacity\u002Fthroughput, construction timeline (months), COD target, concession term or asset useful life\n- **Capital cost budget**: EPC contract price, owner's costs, contingency, development fees, financing fees, interest during construction\n- **Revenue assumptions**: offtake\u002FPPA price and escalation, availability\u002Fcapacity factor, merchant price curves if applicable [VERIFY contracted vs. merchant split]\n- **Operating cost assumptions**: fixed O&M, variable O&M, fuel\u002Ffeedstock costs, insurance, land lease, management fees, major maintenance reserve schedule\n- **Tax inputs**: depreciation method and schedule (MACRS, straight-line), tax rate, ITC\u002FPTC eligibility [VERIFY jurisdiction-specific incentives], tax equity structure if relevant\n- **Debt terms**: tenor, pricing (margin + base rate), commitment fee, upfront fees, DSCR lock-up and default levels, cash sweep percentage, DSRA sizing (typically 6-month debt service), maintenance capex reserve\n- **Equity return targets**: target levered IRR, minimum cash-on-cash yield, distribution waterfall tiers if multiple equity classes\n\n## Workflow\n\n1. **Set up the timeline and flags**\n   - Define semi-annual or quarterly periods from financial close through debt maturity and concession end\n   - Create binary flags for construction, ramp-up, operations, and tail periods\n   - Map construction draw schedule against EPC milestone payments\n\n2. **Build the construction-period waterfall**\n   - Model equity contributions and debt draws pro rata or equity-first per the term sheet\n   - Capitalize interest during construction (IDC) and commitment fees into the loan balance\n   - Track cumulative uses and sources; confirm total sources = total uses at COD\n\n3. **Model operating revenue**\n   - Calculate gross revenue from contracted offtake quantities × price × escalation\n   - Apply availability\u002Fcurtailment deductions\n   - If merchant exposure exists, layer in price scenarios (base, low, high)\n\n4. **Model operating expenses and taxes**\n   - Project fixed and variable O&M with escalation indices\n   - Build depreciation schedule and compute taxable income\n   - Apply NOL carryforwards if early-year losses exist; compute cash taxes payable [VERIFY NOL rules per jurisdiction]\n\n5. **Calculate Cash Flow Available for Debt Service (CFADS)**\n   - CFADS = Revenue − Opex − Cash Taxes − Working Capital Changes − Maintenance Capex Reserve Contributions\n   - Confirm CFADS excludes financing items (interest, principal, distributions)\n\n6. **Size and sculpt debt repayment**\n   - For sculpted repayment: solve each period's principal so that DSCR = target (e.g., 1.35×) across all periods\n   - For level repayment: calculate annuity-based debt service; verify DSCR remains above minimum covenant (e.g., 1.20×)\n   - Compute LLCR (NPV of CFADS over remaining debt life ÷ outstanding debt) and confirm ≥ lender threshold (typically 1.20×–1.30×)\n   - Size DSRA funding requirement and model periodic top-ups\u002Freleases\n\n7. **Build the equity distribution waterfall**\n   - Apply lock-up DSCR test: if trailing\u002Fforward DSCR \u003C lock-up level, trap cash\n   - Calculate distributions after debt service, reserve funding, and cash sweep (if applicable)\n   - Compute levered equity IRR and cash-on-cash multiples (MOIC)\n\n8. **Run sensitivities and scenarios**\n   - Single-variable: construction delay (+3\u002F+6 months), cost overrun (+10%\u002F+20%), revenue shortfall (−10%\u002F−20%), interest rate stress (+100\u002F+200 bps)\n   - Breakeven analysis: find the revenue level or cost level where DSCR = 1.00×\n   - Downside scenario: combine construction delay + cost overrun + low revenue; confirm covenant compliance or identify cash shortfall\n\n## Output\n\n- **Summary page**: project IRR, equity IRR, MOIC, average DSCR, minimum DSCR, LLCR at COD, maximum gearing, payback period\n- **Sources & uses table**: construction period and permanent capital structure\n- **Annual\u002Fsemi-annual cash flow statement**: revenue through distributions, with CFADS and DSCR clearly shown per period\n- **Debt schedule**: draws, repayments (sculpted or level), outstanding balance, interest, fees, DSRA balance\n- **Sensitivity tables**: tornado chart inputs with equity IRR and min DSCR as outputs\n- **Assumptions log**: every input with source reference, date, and [VERIFY] flags for unconfirmed items\n\n## Quality Checks\n\n- Sources = Uses in construction waterfall (zero variance)\n- DSCR never drops below covenant default level in base case; identify periods where DSCR is within 0.10× of lock-up\n- LLCR ≥ threshold at every calculation date\n- Cash balance never goes negative in any period under base case\n- Sum of all debt draws = committed facility amount; no over-draw\n- Equity IRR circular reference resolved (use macro iteration or copy-paste values approach)\n- Tax depreciation fully absorbed within concession\u002Fuseful life; no phantom deductions after asset is fully depreciated\n- Escalation indices applied consistently across revenue and cost lines [VERIFY index source and base year]\n- Model balances: closing cash = opening cash + net cash flow in every period\n","# Modeling Project Finance Structures\n\n## When To Use\n\n- Modeling a non-recourse or limited-recourse project financing (power plants, toll roads, LNG terminals, renewables, PPP\u002FPFI concessions)\n- Sizing senior debt tranches against projected cash flows and DSCR \u002F LLCR covenants\n- Structuring construction-period draws, equity contributions, and IDC capitalization\n- Evaluating sculpted vs. level debt repayment profiles\n- Running sensitivities for lender presentations, credit committee packages, or investment committee memos\n- Assessing refinancing scenarios or mini-perm bullet structures\n\n## Inputs To Gather\n\n- **Project parameters**: capacity\u002Fthroughput, construction timeline (months), COD target, concession term or asset useful life\n- **Capital cost budget**: EPC contract price, owner's costs, contingency, development fees, financing fees, interest during construction\n- **Revenue assumptions**: offtake\u002FPPA price and escalation, availability\u002Fcapacity factor, merchant price curves if applicable [VERIFY contracted vs. merchant split]\n- **Operating cost assumptions**: fixed O&M, variable O&M, fuel\u002Ffeedstock costs, insurance, land lease, management fees, major maintenance reserve schedule\n- **Tax inputs**: depreciation method and schedule (MACRS, straight-line), tax rate, ITC\u002FPTC eligibility [VERIFY jurisdiction-specific incentives], tax equity structure if relevant\n- **Debt terms**: tenor, pricing (margin + base rate), commitment fee, upfront fees, DSCR lock-up and default levels, cash sweep percentage, DSRA sizing (typically 6-month debt service), maintenance capex reserve\n- **Equity return targets**: target levered IRR, minimum cash-on-cash yield, distribution waterfall tiers if multiple equity classes\n\n## Workflow\n\n1. **Set up the timeline and flags**\n   - Define semi-annual or quarterly periods from financial close through debt maturity and concession end\n   - Create binary flags for construction, ramp-up, operations, and tail periods\n   - Map construction draw schedule against EPC milestone payments\n\n2. **Build the construction-period waterfall**\n   - Model equity contributions and debt draws pro rata or equity-first per the term sheet\n   - Capitalize interest during construction (IDC) and commitment fees into the loan balance\n   - Track cumulative uses and sources; confirm total sources = total uses at COD\n\n3. **Model operating revenue**\n   - Calculate gross revenue from contracted offtake quantities × price × escalation\n   - Apply availability\u002Fcurtailment deductions\n   - If merchant exposure exists, layer in price scenarios (base, low, high)\n\n4. **Model operating expenses and taxes**\n   - Project fixed and variable O&M with escalation indices\n   - Build depreciation schedule and compute taxable income\n   - Apply NOL carryforwards if early-year losses exist; compute cash taxes payable [VERIFY NOL rules per jurisdiction]\n\n5. **Calculate Cash Flow Available for Debt Service (CFADS)**\n   - CFADS = Revenue − Opex − Cash Taxes − Working Capital Changes − Maintenance Capex Reserve Contributions\n   - Confirm CFADS excludes financing items (interest, principal, distributions)\n\n6. **Size and sculpt debt repayment**\n   - For sculpted repayment: solve each period's principal so that DSCR = target (e.g., 1.35×) across all periods\n   - For level repayment: calculate annuity-based debt service; verify DSCR remains above minimum covenant (e.g., 1.20×)\n   - Compute LLCR (NPV of CFADS over remaining debt life ÷ outstanding debt) and confirm ≥ lender threshold (typically 1.20×–1.30×)\n   - Size DSRA funding requirement and model periodic top-ups\u002Freleases\n\n7. **Build the equity distribution waterfall**\n   - Apply lock-up DSCR test: if trailing\u002Fforward DSCR \u003C lock-up level, trap cash\n   - Calculate distributions after debt service, reserve funding, and cash sweep (if applicable)\n   - Compute levered equity IRR and cash-on-cash multiples (MOIC)\n\n8. **Run sensitivities and scenarios**\n   - Single-variable: construction delay (+3\u002F+6 months), cost overrun (+10%\u002F+20%), revenue shortfall (−10%\u002F−20%), interest rate stress (+100\u002F+200 bps)\n   - Breakeven analysis: find the revenue level or cost level where DSCR = 1.00×\n   - Downside scenario: combine construction delay + cost overrun + low revenue; confirm covenant compliance or identify cash shortfall\n\n## Output\n\n- **Summary page**: project IRR, equity IRR, MOIC, average DSCR, minimum DSCR, LLCR at COD, maximum gearing, payback period\n- **Sources & uses table**: construction period and permanent capital structure\n- **Annual\u002Fsemi-annual cash flow statement**: revenue through distributions, with CFADS and DSCR clearly shown per period\n- **Debt schedule**: draws, repayments (sculpted or level), outstanding balance, interest, fees, DSRA balance\n- **Sensitivity tables**: tornado chart inputs with equity IRR and min DSCR as outputs\n- **Assumptions log**: every input with source reference, date, and [VERIFY] flags for unconfirmed items\n\n## Quality Checks\n\n- Sources = Uses in construction waterfall (zero variance)\n- DSCR never drops below covenant default level in base case; identify periods where DSCR is within 0.10× of lock-up\n- LLCR ≥ threshold at every calculation date\n- Cash balance never goes negative in any period under base case\n- Sum of all debt draws = committed facility amount; no over-draw\n- Equity IRR circular reference resolved (use macro iteration or copy-paste values approach)\n- Tax depreciation fully absorbed within concession\u002Fuseful life; no phantom deductions after asset is fully depreciated\n- Escalation indices applied consistently across revenue and cost lines [VERIFY index source and base year]\n- Model balances: closing cash = opening cash + net cash flow in every period\n",{"name":5,"tags":24,"source":27,"license":15,"language":28,"metadata":29,"description":7,"imported_at":40,"source_path":41,"source_repository":42},[25,26],"modeling","infrastructure-and-project-finance","https:\u002F\u002Fgithub.com\u002FCaseMark\u002Fskills","en",{"author":30,"skill_modes":31,"document_types":34,"practice_areas":36},"casemark",[32,33],"Modeling","Forecasting",[35],"Financial Model",[37,38,39],"Project Finance","Infrastructure Investment","PPP","2026-09-20","skills\u002Fcapital\u002Fmodeling-project-finance-structures\u002FSKILL.md","CaseMark\u002Fskills","main","2d1750717747097b602acf30bd09a7cbd4b4c6ea","awesome_skills\u002Ffinance\u002Fmodeling-project-finance-structures","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous","2026-11-09 11:45:36",{"source":8,"skillName":5,"commands":50,"prompt":60,"zipAvailable":61},[51,54,57],{"tool":52,"command":53},"npx","npx skills add Mr-Nobody-Anonymous\u002FAll-skills --skill modeling-project-finance-structures",{"tool":55,"command":56},"bunx","bunx skills add Mr-Nobody-Anonymous\u002FAll-skills --skill modeling-project-finance-structures",{"tool":58,"command":59},"pnpm","pnpm dlx skills add Mr-Nobody-Anonymous\u002FAll-skills --skill modeling-project-finance-structures","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Ffinance\u002Fmodeling-project-finance-structures\u002FSKILL.md",true,[],[64,72,79,86,93,100],{"skillNo":65,"name":66,"nameZh":6,"description":67,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":68,"licenseFileUrl":6,"sourceHtmlUrl":69,"categories":70,"keywords":71,"publishedAt":19},"01M7FFFZPC2025JQQHPHDX154J","dei-assessment","Assess diversity, equity, and inclusion with metrics. TRIGGERS - Use when user needs help with dei-assessment related tasks.","MIT","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Fhr-people\u002Fdei-assessment\u002FSKILL.md",[],[],{"skillNo":73,"name":74,"nameZh":6,"description":75,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":68,"licenseFileUrl":6,"sourceHtmlUrl":76,"categories":77,"keywords":78,"publishedAt":19},"01M7FFFWN8H4WA7A6Y398QKB6J","dei-action-plan","Create DEI action plans with goals and initiatives. TRIGGERS - Use when user needs help with dei-action-plan related tasks.","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Fhr-people\u002Fdei-action-plan\u002FSKILL.md",[],[],{"skillNo":80,"name":81,"nameZh":6,"description":82,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":68,"licenseFileUrl":6,"sourceHtmlUrl":83,"categories":84,"keywords":85,"publishedAt":19},"01M7FFFSHTM0QZRVZ2NRJTJ0PY","culture-fit-assessment","Design culture add assessment processes. TRIGGERS - Use when user needs help with culture-fit-assessment related tasks.","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Fhr-people\u002Fculture-fit-assessment\u002FSKILL.md",[],[],{"skillNo":87,"name":88,"nameZh":6,"description":89,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":68,"licenseFileUrl":6,"sourceHtmlUrl":90,"categories":91,"keywords":92,"publishedAt":19},"01M7FFFMA12RKEQA38KHJSXXPS","cowork-to-code-bridge","Use an already-installed, independently verified cowork-to-code bridge to run narrowly approved actions on the user's own macOS, Linux, or WSL2 machine through a local file queue.","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Fhr-people\u002Fcowork-to-code-bridge\u002FSKILL.md",[],[],{"skillNo":94,"name":95,"nameZh":6,"description":96,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":68,"licenseFileUrl":6,"sourceHtmlUrl":97,"categories":98,"keywords":99,"publishedAt":19},"01M7FFFH1F6M8YRGW5V487GH1K","counter-offer-response","Draft counter-offer responses for retention. TRIGGERS - Use when user needs help with counter-offer-response related tasks.","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Fhr-people\u002Fcounter-offer-response\u002FSKILL.md",[],[],{"skillNo":101,"name":102,"nameZh":6,"description":103,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":68,"licenseFileUrl":6,"sourceHtmlUrl":104,"categories":105,"keywords":106,"publishedAt":19},"01M7FFFDGEHV8Y7J9N40HZXW52","continuous-feedback-system","Design continuous feedback systems. TRIGGERS - Use when user needs help with continuous-feedback-system related tasks.","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Fhr-people\u002Fcontinuous-feedback-system\u002FSKILL.md",[],[]]