business-hypothesis-validation
Turn business claims, strategy assertions, and go-to-market assumptions into falsifiable hypotheses with evidence thresholds, experiments, and decision rules. Use when validating a business idea, ranking the riskiest assumptions, designing the smallest informative test, or deciding from evidence whether to continue, pivot, retest, or stop.
- License 许可
- Apache-2.0
- 最近更新
- 2026-10-27
- Stars
- ★ 0
- Forks
- 0
01 前言 Front Matter
- name
- business-hypothesis-validation
- description
- Turn business claims, strategy assertions, and go-to-market assumptions into falsifiable hypotheses with evidence thresholds, experiments, and decision rules. Use when validating a business idea, ranking the riskiest assumptions, designing the smallest informative test, or deciding from evidence whether to continue, pivot, retest, or stop.
03 SKILL.md 正文
Business Hypothesis Validation
Use this skill to convert business ideas, strategy claims, and go-to-market assumptions into hypotheses with evidence thresholds, falsification criteria, and decision rules.
Method
- Extract explicit and hidden claims from the business idea.
- Rewrite claims into hypotheses with customer, behavior, condition, and expected signal.
- Classify assumptions as desirability, viability, feasibility, channel, pricing, or retention.
- Rank assumptions by uncertainty and consequence.
- Define what would falsify each assumption before testing.
- Design the smallest informative experiment with cost, timeline, sample, and metric.
- State the decision rule for stop, continue, pivot, or retest.
Output Shape
- Business claim
- Testable hypothesis
- Assumption type
- Risk ranking
- Evidence threshold
- Falsification criteria
- Validation test
- Decision rule
Quality Bar
- Every hypothesis can be disproven by observable evidence.
- Tests include sample, metric, threshold, and decision rule.
- The plan prioritizes learning over proving the idea right.
- Survey opinions are not treated as validation without behavioral evidence.
04 同仓库更多 Skills
twenty-year-land-plan
Apply the Bren discipline of evaluating every land and development decision on a twenty-year horizon, with a comprehensive plan for how the land, the community, and the surrounding public infrastructure evolve together. Deals optimized for a five-year exit are structurally different from deals that compound across generations; insist on knowing which kind you are making. Use when evaluating land, entitlements, master-planned development, or phasing decisions, and when separating five-year exit deals from generational holds.
thematic-gut-check
Apply the Gray discipline of identifying the structural theme behind every real estate deal, testing where that theme sits in its capital-flow lifecycle, and insisting that deals without a named theme — or deals late in a crowded theme — clear a higher bar. A mediocre deal in a strong theme usually beats a clever deal in a weak one. Use when naming the structural thesis behind a deal, judging whether that theme is early or crowded, and setting the bar the deal must clear.
supply-pipeline-gut-check
Apply the Zell discipline of grounding every real estate thesis in the local supply pipeline. Demand counts over adjectives — units under construction, units permitted, units proposed — and convert them into a forward absorption schedule. A deal that ignores the pipeline is a bet on a market you have not actually studied. Use when validating a market thesis, forecasting absorption and rent growth, or counting units under construction, permitted, and proposed.
ruin-scenario-mapping
Apply the Taleb discipline of identifying, for every real estate deal, the specific chain of events that produces ruin — permanent, unrecoverable capital loss — and verifying that no single such chain has non-trivial probability. Deals with any plausible ruin path must be restructured or abandoned. Use when sizing leverage, testing refinancing, covenant, and liquidity risk, or checking whether any single failure chain can permanently wipe out the position.
revenue-cost-architecture
Design a venture's revenue streams, pricing logic, cost structure, and unit economics so the business model has a coherent theory of value capture, not just value creation. Use after the value proposition and customer segment are set and before financial projections, when choosing a pricing model, calculating contribution margin or CAC payback, or checking whether the unit economics hold at scale.
replacement-cost-stress-test
Apply the Buffett discipline of pricing every real estate asset against the cost to rebuild it from scratch. The ratio of purchase price to replacement cost sets a ceiling on long-run downside: below replacement cost, new supply cannot profitably undercut you; at or above it, you are buying a liability disguised as an asset. Use when setting a purchase price, judging downside protection, or testing how exposed an asset is to newly built competing supply.