AGENT SKILL

meeting-minutes-synthesis

Defines the board-record contract for venture-capital discussions so the minutes artifact stays distinct from the final investment memo.

License 许可
Apache-2.0
所属仓库
cwik-tech/octopus
最近更新
2026-10-27
Stars
★ 0
Forks
0

01 前言 Front Matter

name
meeting-minutes-synthesis
description
Defines the board-record contract for venture-capital discussions so the minutes artifact stays distinct from the final investment memo.

02 资源文件 1

03 SKILL.md 正文

Meeting Minutes Synthesis Skill

When to Use

Use this to calibrate what output/minutes.md represents in the VC team.

Minutes Contract

The minutes artifact is the formal board record. It must:

  • begin with a short overview of the company or opportunity being evaluated
  • name the discussion participants near the top of the document
  • preserve the round-by-round discussion
  • preserve individual agent positions
  • preserve disagreement and convergence
  • remain separate from the final investment memo

The minutes artifact is not the place to collapse the board into a single recommendation narrative. That happens in output/investment-memo.md.

Template

Reference templates/minutes.md for the intended meaning of the minutes artifact:

  • title it as meeting minutes
  • include an opening evaluation overview
  • include a participant roster
  • preserve transcript fidelity
  • keep the file auditable and easy to scan

Separation Rule

  • output/minutes.md: transcript-quality board record
  • output/investment-memo.md: synthesized committee decision document

04 同仓库更多 Skills

cwik-tech
cwik-tech/octopus

twenty-year-land-plan

Apply the Bren discipline of evaluating every land and development decision on a twenty-year horizon, with a comprehensive plan for how the land, the community, and the surrounding public infrastructure evolve together. Deals optimized for a five-year exit are structurally different from deals that compound across generations; insist on knowing which kind you are making. Use when evaluating land, entitlements, master-planned development, or phasing decisions, and when separating five-year exit deals from generational holds.

★ 0
cwik-tech
cwik-tech/octopus

thematic-gut-check

Apply the Gray discipline of identifying the structural theme behind every real estate deal, testing where that theme sits in its capital-flow lifecycle, and insisting that deals without a named theme — or deals late in a crowded theme — clear a higher bar. A mediocre deal in a strong theme usually beats a clever deal in a weak one. Use when naming the structural thesis behind a deal, judging whether that theme is early or crowded, and setting the bar the deal must clear.

★ 0
cwik-tech
cwik-tech/octopus

supply-pipeline-gut-check

Apply the Zell discipline of grounding every real estate thesis in the local supply pipeline. Demand counts over adjectives — units under construction, units permitted, units proposed — and convert them into a forward absorption schedule. A deal that ignores the pipeline is a bet on a market you have not actually studied. Use when validating a market thesis, forecasting absorption and rent growth, or counting units under construction, permitted, and proposed.

★ 0
cwik-tech
cwik-tech/octopus

ruin-scenario-mapping

Apply the Taleb discipline of identifying, for every real estate deal, the specific chain of events that produces ruin — permanent, unrecoverable capital loss — and verifying that no single such chain has non-trivial probability. Deals with any plausible ruin path must be restructured or abandoned. Use when sizing leverage, testing refinancing, covenant, and liquidity risk, or checking whether any single failure chain can permanently wipe out the position.

★ 0
cwik-tech
cwik-tech/octopus

revenue-cost-architecture

Design a venture's revenue streams, pricing logic, cost structure, and unit economics so the business model has a coherent theory of value capture, not just value creation. Use after the value proposition and customer segment are set and before financial projections, when choosing a pricing model, calculating contribution margin or CAC payback, or checking whether the unit economics hold at scale.

★ 0
cwik-tech
cwik-tech/octopus

replacement-cost-stress-test

Apply the Buffett discipline of pricing every real estate asset against the cost to rebuild it from scratch. The ratio of purchase price to replacement cost sets a ceiling on long-run downside: below replacement cost, new supply cannot profitably undercut you; at or above it, you are buying a liability disguised as an asset. Use when setting a purchase price, judging downside protection, or testing how exposed an asset is to newly built competing supply.

★ 0