final-poem-signoff
Run the final acceptance checks on an occasional poem and package it for its delivery mode with timing and delivery notes. Use when a wedding, eulogy, birthday, retirement, toast, anniversary, or gift poem has been edited and must be approved and handed to the requester.
- License 许可
- Apache-2.0
- 最近更新
- 2026-10-27
- Stars
- ★ 0
- Forks
- 0
01 前言 Front Matter
- name
- final-poem-signoff
- description
- Run the final acceptance checks on an occasional poem and package it for its delivery mode with timing and delivery notes. Use when a wedding, eulogy, birthday, retirement, toast, anniversary, or gift poem has been edited and must be approved and handed to the requester.
03 SKILL.md 正文
Final Poem Sign-off
The lead's signature means the poem is safe and fitting for its room, not merely well written.
Acceptance Checklist
Every item must pass before delivery.
- Brief fidelity. The occasion, honoree names, speaker voice, and tone match the Brief Lock.
- Length. For spoken poems, word count divided by 130 gives minutes. The result must fit the time limit with at least 10 percent spare. For print, the line count must fit the card or frame.
- Sensitivity scan. Read line by line against the sensitivities list. Nothing forbidden appears, including by implication.
- Fact check. Every personal detail traces to the requester or the interviewer's confirmed detail bank. Nothing is invented.
- Specificity. At least three details could only be true of this honoree.
- Read-aloud test. Spoken poems contain no tongue-twisters, no line that needs a breath mid-phrase, and no line that forces the speaker into a voice that is not theirs.
- Ending. The last line lands the intended feeling. For a toast, it invites the raise of a glass.
- Clean text. The poem has no placeholders, brackets, or editorial notes.
If any item fails, fix small issues directly, such as a word swap, a trim, or punctuation. Route larger failures back through the pipeline.
Packaging by Delivery Mode
| Mode | Package |
|---|---|
| Toast / ceremony / eulogy | Poem in large-print-friendly short lines; estimated read time; pacing notes on where to pause and which words to emphasize |
| Printed card | Poem with a note on line count and suggested layout; no performance notes |
| Framed keepsake | Poem with a suggested title and stanza spacing; confirmation that it contains no dated references |
Final Report Contents
- The Brief Lock summary
- The poem
- Delivery notes
- Choices made (form and key details used)
- Open questions (unconfirmed details for the requester to verify)
04 同仓库更多 Skills
twenty-year-land-plan
Apply the Bren discipline of evaluating every land and development decision on a twenty-year horizon, with a comprehensive plan for how the land, the community, and the surrounding public infrastructure evolve together. Deals optimized for a five-year exit are structurally different from deals that compound across generations; insist on knowing which kind you are making. Use when evaluating land, entitlements, master-planned development, or phasing decisions, and when separating five-year exit deals from generational holds.
thematic-gut-check
Apply the Gray discipline of identifying the structural theme behind every real estate deal, testing where that theme sits in its capital-flow lifecycle, and insisting that deals without a named theme — or deals late in a crowded theme — clear a higher bar. A mediocre deal in a strong theme usually beats a clever deal in a weak one. Use when naming the structural thesis behind a deal, judging whether that theme is early or crowded, and setting the bar the deal must clear.
supply-pipeline-gut-check
Apply the Zell discipline of grounding every real estate thesis in the local supply pipeline. Demand counts over adjectives — units under construction, units permitted, units proposed — and convert them into a forward absorption schedule. A deal that ignores the pipeline is a bet on a market you have not actually studied. Use when validating a market thesis, forecasting absorption and rent growth, or counting units under construction, permitted, and proposed.
ruin-scenario-mapping
Apply the Taleb discipline of identifying, for every real estate deal, the specific chain of events that produces ruin — permanent, unrecoverable capital loss — and verifying that no single such chain has non-trivial probability. Deals with any plausible ruin path must be restructured or abandoned. Use when sizing leverage, testing refinancing, covenant, and liquidity risk, or checking whether any single failure chain can permanently wipe out the position.
revenue-cost-architecture
Design a venture's revenue streams, pricing logic, cost structure, and unit economics so the business model has a coherent theory of value capture, not just value creation. Use after the value proposition and customer segment are set and before financial projections, when choosing a pricing model, calculating contribution margin or CAC payback, or checking whether the unit economics hold at scale.
replacement-cost-stress-test
Apply the Buffett discipline of pricing every real estate asset against the cost to rebuild it from scratch. The ratio of purchase price to replacement cost sets a ceiling on long-run downside: below replacement cost, new supply cannot profitably undercut you; at or above it, you are buying a liability disguised as an asset. Use when setting a purchase price, judging downside protection, or testing how exposed an asset is to newly built competing supply.