AGENT SKILL

construction-troubleshooting

Diagnoses furniture construction defects and recommends minimally destructive, durable repairs or rebuild decisions. Use when assemblies rack, joints fit poorly, parts split, panels cup, glue-ups misalign, or finished furniture feels unstable.

License 许可
Apache-2.0
所属仓库
cwik-tech/octopus
最近更新
2026-10-27
Stars
★ 0
Forks
0

01 前言 Front Matter

name
construction-troubleshooting
description
Diagnoses furniture construction defects and recommends minimally destructive, durable repairs or rebuild decisions. Use when assemblies rack, joints fit poorly, parts split, panels cup, glue-ups misalign, or finished furniture feels unstable.

03 SKILL.md 正文

Construction Troubleshooting

Objective

Find the root cause of a construction problem before applying a repair that hides symptoms or creates a new failure.

Diagnostic Protocol

  1. Record the symptom precisely: where it occurs, when it appears, and whether it changes under load or humidity.
  2. Check geometry first: flatness, square, twist, parallelism, and reference-face consistency.
  3. Check joint fit and glue surfaces: gaps, bottoming out, starved glue joints, end-grain dependence, or crushed fibers.
  4. Check grain orientation and movement restraint.
  5. Check the load path: identify the component bending, pulling out, splitting, or allowing racking.
  6. Choose the least-destructive remedy that restores function and does not compromise movement or appearance.

Common Symptoms

Symptom Likely causes Typical response
Assembly racks Unsquared joints, weak corner connection, no diagonal resistance Re-square if possible; add appropriate corner blocking, stretchers, or remake deficient joints
Joint will not close Bottomed mortise, debris, swollen tenon, wrong shoulder Identify interference; pare or shorten only the offending area
Joint is loose Over-machining, wrong reference face, compressed fibers Shim or veneer only when structurally credible; otherwise remake the joint or part
Panel splits Cross-grain restraint, seasonal stress, undersized stock Remove restraint, stabilize crack where appropriate, redesign attachment
Top cups or twists Uneven moisture, poor grain selection, asymmetric finishing or restraint Normalize moisture, flatten if feasible, redesign supports and attachment
Chair loosens Insufficient long-grain glue area or repeated racking Disassemble if feasible, clean joints, rebuild with correct fit and structural reinforcement

Repair Rules

  • Do not fill a structural gap with glue alone.
  • Do not add screws across grain without considering movement and splitting.
  • Do not obscure a load-bearing defect with cosmetic filler.
  • Recommend remake rather than repair when the repair would be weaker, unsafe, or more complex than replacement.

Output

Give the symptom, likely root cause, checks to confirm it, repair steps, and conditions that require remaking the part.

04 同仓库更多 Skills

cwik-tech
cwik-tech/octopus

twenty-year-land-plan

Apply the Bren discipline of evaluating every land and development decision on a twenty-year horizon, with a comprehensive plan for how the land, the community, and the surrounding public infrastructure evolve together. Deals optimized for a five-year exit are structurally different from deals that compound across generations; insist on knowing which kind you are making. Use when evaluating land, entitlements, master-planned development, or phasing decisions, and when separating five-year exit deals from generational holds.

★ 0
cwik-tech
cwik-tech/octopus

thematic-gut-check

Apply the Gray discipline of identifying the structural theme behind every real estate deal, testing where that theme sits in its capital-flow lifecycle, and insisting that deals without a named theme — or deals late in a crowded theme — clear a higher bar. A mediocre deal in a strong theme usually beats a clever deal in a weak one. Use when naming the structural thesis behind a deal, judging whether that theme is early or crowded, and setting the bar the deal must clear.

★ 0
cwik-tech
cwik-tech/octopus

supply-pipeline-gut-check

Apply the Zell discipline of grounding every real estate thesis in the local supply pipeline. Demand counts over adjectives — units under construction, units permitted, units proposed — and convert them into a forward absorption schedule. A deal that ignores the pipeline is a bet on a market you have not actually studied. Use when validating a market thesis, forecasting absorption and rent growth, or counting units under construction, permitted, and proposed.

★ 0
cwik-tech
cwik-tech/octopus

ruin-scenario-mapping

Apply the Taleb discipline of identifying, for every real estate deal, the specific chain of events that produces ruin — permanent, unrecoverable capital loss — and verifying that no single such chain has non-trivial probability. Deals with any plausible ruin path must be restructured or abandoned. Use when sizing leverage, testing refinancing, covenant, and liquidity risk, or checking whether any single failure chain can permanently wipe out the position.

★ 0
cwik-tech
cwik-tech/octopus

revenue-cost-architecture

Design a venture's revenue streams, pricing logic, cost structure, and unit economics so the business model has a coherent theory of value capture, not just value creation. Use after the value proposition and customer segment are set and before financial projections, when choosing a pricing model, calculating contribution margin or CAC payback, or checking whether the unit economics hold at scale.

★ 0
cwik-tech
cwik-tech/octopus

replacement-cost-stress-test

Apply the Buffett discipline of pricing every real estate asset against the cost to rebuild it from scratch. The ratio of purchase price to replacement cost sets a ceiling on long-run downside: below replacement cost, new supply cannot profitably undercut you; at or above it, you are buying a liability disguised as an asset. Use when setting a purchase price, judging downside protection, or testing how exposed an asset is to newly built competing supply.

★ 0