[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M7F4QK3G0B03HVZPNAEZ0MJH":3,"skill-same:01M7F4QK3G0B03HVZPNAEZ0MJH":45},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":16,"categories":17,"keywords":18,"publishedAt":19,"linkOnly":20,"markdownContent":21,"markdownBody":22,"frontMatter":23,"refName":24,"commitSha":25,"skillDirectory":26,"forksCount":14,"repositoryHtmlUrl":27,"repositoryHomepageUrl":28,"ownerHtmlUrl":29,"ownerBlogUrl":6,"ownerDescription":6,"updatedAt":30,"install":31,"resources":44},"01M7F4QK3G0B03HVZPNAEZ0MJH","furniture-costing-and-pricing",null,"Builds honest furniture cost and pricing estimates that include materials, labor, overhead, waste, rework, fulfillment, and margin. Use when quoting a commission, evaluating small-batch viability, setting deposits, or comparing make-versus-sell decisions.","cwik-tech\u002Foctopus","cwik-tech","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F54542292?v=4","01M7F42E123GEHVK6RWC5MSWJ9","Tomasz Cwik","01M7F42E1PD4P54MTG8PG32VCV",0,"Apache-2.0","https:\u002F\u002Fgithub.com\u002Fcwik-tech\u002Foctopus\u002Fblob\u002Fmain\u002Fagents\u002Ffurniture-production-advisor\u002Fskills\u002Ffurniture-costing-and-pricing\u002FSKILL.md",[],[],"2026-11-16 10:05:34",false,"---\nname: furniture-costing-and-pricing\ndescription: Builds honest furniture cost and pricing estimates that include materials, labor, overhead, waste, rework, fulfillment, and margin. Use when quoting a commission, evaluating small-batch viability, setting deposits, or comparing make-versus-sell decisions.\n---\n\n# Furniture Costing and Pricing\n\n## Purpose\n\nCreate transparent, assumption-based cost and price guidance for handmade furniture without confusing a hobby budget with a viable selling price.\n\n## Cost Model\n\nCalculate and state assumptions for:\n\n1. **Direct materials:** lumber, sheet goods, hardware, finish, adhesives, abrasives, packaging.\n2. **Material waste:** yield loss, defects, offcuts, color matching, and contingency.\n3. **Direct labor:** design adaptation, milling, machining, assembly, sanding, finishing, packing, communication, and delivery.\n4. **Shop overhead:** tool wear, utilities, consumables, rent or workspace allocation where relevant.\n5. **Rework reserve:** expected defects, remake risk, and warranty-like corrections.\n6. **Fulfillment:** delivery, installation, shipping, insurance, and payment fees when applicable.\n\n## Pricing Rules\n\n- Distinguish cost, break-even price, target price, and market-test price.\n- Use measured times from a prototype where available; otherwise identify time estimates as uncertain.\n- Include customer communication and delivery time in commissioned work.\n- Use deposits to cover committed material purchases and reduce cancellation exposure.\n- Do not promise profitability without a sales channel, capacity assessment, and fully loaded costing.\n\n## Output\n\nPresent an assumption table, fully loaded unit cost, pricing scenarios, suggested deposit structure, key sensitivity drivers, and the one measurement most worth collecting on the pilot run.\n","# Furniture Costing and Pricing\n\n## Purpose\n\nCreate transparent, assumption-based cost and price guidance for handmade furniture without confusing a hobby budget with a viable selling price.\n\n## Cost Model\n\nCalculate and state assumptions for:\n\n1. **Direct materials:** lumber, sheet goods, hardware, finish, adhesives, abrasives, packaging.\n2. **Material waste:** yield loss, defects, offcuts, color matching, and contingency.\n3. **Direct labor:** design adaptation, milling, machining, assembly, sanding, finishing, packing, communication, and delivery.\n4. **Shop overhead:** tool wear, utilities, consumables, rent or workspace allocation where relevant.\n5. **Rework reserve:** expected defects, remake risk, and warranty-like corrections.\n6. **Fulfillment:** delivery, installation, shipping, insurance, and payment fees when applicable.\n\n## Pricing Rules\n\n- Distinguish cost, break-even price, target price, and market-test price.\n- Use measured times from a prototype where available; otherwise identify time estimates as uncertain.\n- Include customer communication and delivery time in commissioned work.\n- Use deposits to cover committed material purchases and reduce cancellation exposure.\n- Do not promise profitability without a sales channel, capacity assessment, and fully loaded costing.\n\n## Output\n\nPresent an assumption table, fully loaded unit cost, pricing scenarios, suggested deposit structure, key sensitivity drivers, and the one measurement most worth collecting on the pilot run.\n",{"name":5,"description":7},"main","f0f0efe1d4c64b51a51f44427ad147750d29154e","agents\u002Ffurniture-production-advisor\u002Fskills\u002Ffurniture-costing-and-pricing","https:\u002F\u002Fgithub.com\u002Fcwik-tech\u002Foctopus","www.cuteoctopus.site","https:\u002F\u002Fgithub.com\u002Fcwik-tech","2026-10-27 06:12:19",{"source":8,"skillName":5,"commands":32,"prompt":42,"zipAvailable":43},[33,36,39],{"tool":34,"command":35},"npx","npx skills add cwik-tech\u002Foctopus --skill furniture-costing-and-pricing",{"tool":37,"command":38},"bunx","bunx skills add cwik-tech\u002Foctopus --skill furniture-costing-and-pricing",{"tool":40,"command":41},"pnpm","pnpm dlx skills add cwik-tech\u002Foctopus --skill furniture-costing-and-pricing","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002Fcwik-tech\u002Foctopus\u002Fblob\u002Fmain\u002Fagents\u002Ffurniture-production-advisor\u002Fskills\u002Ffurniture-costing-and-pricing\u002FSKILL.md",true,[],[46,53,60,67,74,81],{"skillNo":47,"name":48,"nameZh":6,"description":49,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":50,"categories":51,"keywords":52,"publishedAt":19},"01M7F5MQVQ3CHGM77Q51M4B1AC","twenty-year-land-plan","Apply the Bren discipline of evaluating every land and development decision on a twenty-year horizon, with a comprehensive plan for how the land, the community, and the surrounding public infrastructure evolve together. Deals optimized for a five-year exit are structurally different from deals that compound across generations; insist on knowing which kind you are making. Use when evaluating land, entitlements, master-planned development, or phasing decisions, and when separating five-year exit deals from generational holds.","https:\u002F\u002Fgithub.com\u002Fcwik-tech\u002Foctopus\u002Fblob\u002Fmain\u002Fskills\u002Ftwenty-year-land-plan\u002FSKILL.md",[],[],{"skillNo":54,"name":55,"nameZh":6,"description":56,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":57,"categories":58,"keywords":59,"publishedAt":19},"01M7F5MGQ8JSV27SFDQVVGFQE3","thematic-gut-check","Apply the Gray discipline of identifying the structural theme behind every real estate deal, testing where that theme sits in its capital-flow lifecycle, and insisting that deals without a named theme — or deals late in a crowded theme — clear a higher bar. A mediocre deal in a strong theme usually beats a clever deal in a weak one. Use when naming the structural thesis behind a deal, judging whether that theme is early or crowded, and setting the bar the deal must clear.","https:\u002F\u002Fgithub.com\u002Fcwik-tech\u002Foctopus\u002Fblob\u002Fmain\u002Fskills\u002Fthematic-gut-check\u002FSKILL.md",[],[],{"skillNo":61,"name":62,"nameZh":6,"description":63,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":64,"categories":65,"keywords":66,"publishedAt":19},"01M7F5M8V64Y0ZD8PTPWEJQXJ9","supply-pipeline-gut-check","Apply the Zell discipline of grounding every real estate thesis in the local supply pipeline. Demand counts over adjectives — units under construction, units permitted, units proposed — and convert them into a forward absorption schedule. A deal that ignores the pipeline is a bet on a market you have not actually studied. Use when validating a market thesis, forecasting absorption and rent growth, or counting units under construction, permitted, and proposed.","https:\u002F\u002Fgithub.com\u002Fcwik-tech\u002Foctopus\u002Fblob\u002Fmain\u002Fskills\u002Fsupply-pipeline-gut-check\u002FSKILL.md",[],[],{"skillNo":68,"name":69,"nameZh":6,"description":70,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":71,"categories":72,"keywords":73,"publishedAt":19},"01M7F5M3J2Q146BJC13TD3YCXF","ruin-scenario-mapping","Apply the Taleb discipline of identifying, for every real estate deal, the specific chain of events that produces ruin — permanent, unrecoverable capital loss — and verifying that no single such chain has non-trivial probability. Deals with any plausible ruin path must be restructured or abandoned. Use when sizing leverage, testing refinancing, covenant, and liquidity risk, or checking whether any single failure chain can permanently wipe out the position.","https:\u002F\u002Fgithub.com\u002Fcwik-tech\u002Foctopus\u002Fblob\u002Fmain\u002Fskills\u002Fruin-scenario-mapping\u002FSKILL.md",[],[],{"skillNo":75,"name":76,"nameZh":6,"description":77,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":78,"categories":79,"keywords":80,"publishedAt":19},"01M7F5KZDS0DYD172P6HS0WXEM","revenue-cost-architecture","Design a venture's revenue streams, pricing logic, cost structure, and unit economics so the business model has a coherent theory of value capture, not just value creation. Use after the value proposition and customer segment are set and before financial projections, when choosing a pricing model, calculating contribution margin or CAC payback, or checking whether the unit economics hold at scale.","https:\u002F\u002Fgithub.com\u002Fcwik-tech\u002Foctopus\u002Fblob\u002Fmain\u002Fskills\u002Frevenue-cost-architecture\u002FSKILL.md",[],[],{"skillNo":82,"name":83,"nameZh":6,"description":84,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":85,"categories":86,"keywords":87,"publishedAt":19},"01M7F5KP1CNQMYAVCDTV4EEW3J","replacement-cost-stress-test","Apply the Buffett discipline of pricing every real estate asset against the cost to rebuild it from scratch. The ratio of purchase price to replacement cost sets a ceiling on long-run downside: below replacement cost, new supply cannot profitably undercut you; at or above it, you are buying a liability disguised as an asset. Use when setting a purchase price, judging downside protection, or testing how exposed an asset is to newly built competing supply.","https:\u002F\u002Fgithub.com\u002Fcwik-tech\u002Foctopus\u002Fblob\u002Fmain\u002Fskills\u002Freplacement-cost-stress-test\u002FSKILL.md",[],[]]