[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M7F4Q93T6MYKMVHSK4GDXQF6":3,"skill-same:01M7F4Q93T6MYKMVHSK4GDXQF6":45},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":16,"categories":17,"keywords":18,"publishedAt":19,"linkOnly":20,"markdownContent":21,"markdownBody":22,"frontMatter":23,"refName":24,"commitSha":25,"skillDirectory":26,"forksCount":14,"repositoryHtmlUrl":27,"repositoryHomepageUrl":28,"ownerHtmlUrl":29,"ownerBlogUrl":6,"ownerDescription":6,"updatedAt":30,"install":31,"resources":44},"01M7F4Q93T6MYKMVHSK4GDXQF6","project-risk-review",null,"Identifies and controls safety, structural, material-movement, fit, sequencing, and finishing risks in furniture projects. Use when finalizing a build plan, before irreversible cuts or glue-ups, or when troubleshooting a woodworking project.","cwik-tech\u002Foctopus","cwik-tech","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F54542292?v=4","01M7F42E123GEHVK6RWC5MSWJ9","Tomasz Cwik","01M7F42E1PD4P54MTG8PG32VCV",0,"Apache-2.0","https:\u002F\u002Fgithub.com\u002Fcwik-tech\u002Foctopus\u002Fblob\u002Fmain\u002Fagents\u002Ffurniture-making-lead\u002Fskills\u002Fproject-risk-review\u002FSKILL.md",[],[],"2026-11-16 10:05:34",false,"---\nname: project-risk-review\ndescription: Identifies and controls safety, structural, material-movement, fit, sequencing, and finishing risks in furniture projects. Use when finalizing a build plan, before irreversible cuts or glue-ups, or when troubleshooting a woodworking project.\n---\n\n# Project Risk Review\n\n## Purpose\n\nFind the failures most likely to waste material, compromise safety, or prevent the piece from functioning before they occur.\n\n## Review Areas\n\n### Safety\n\nCheck workholding, blade and bit suitability, machine setup, kickback exposure, dust and respiratory controls, chemical ventilation, lifting, and clamp pressure. Stop any plan that depends on unsafe improvisation.\n\n### Structure and Movement\n\nCheck load paths, racking resistance, joint orientation, fastener choice, panel construction, grain direction, seasonal wood movement, and attachment methods that permit movement where needed.\n\n### Fit and Function\n\nCheck room access, final dimensions, level and floor variation, door or drawer clearance, hardware templates, mating parts, ergonomics, and installation conditions.\n\n### Sequence and Recovery\n\nCheck reference-face discipline, part labeling, duplicate-part consistency, order of milling, glue-up staging, masking needs, and whether a test piece or dry fit is required.\n\n### Finish\n\nCheck species and grain behavior, glue contamination, sanding progression, stain or dye tests, topcoat compatibility, cure time, ventilation, and handling protection.\n\n## Method\n\n1. List the five to ten highest-impact project risks.\n2. Rate each by likelihood and consequence.\n3. Specify one preventive control and one recovery path where feasible.\n4. Escalate any risk that could cause injury, structural failure, or an unusable piece.\n5. Convert the result into hold points in the build plan.\n\n## Output\n\nUse a table with risk, trigger, consequence, prevention, recovery, and decision owner. End with the conditions that must be checked before cutting, glue-up, and finishing.","# Project Risk Review\n\n## Purpose\n\nFind the failures most likely to waste material, compromise safety, or prevent the piece from functioning before they occur.\n\n## Review Areas\n\n### Safety\n\nCheck workholding, blade and bit suitability, machine setup, kickback exposure, dust and respiratory controls, chemical ventilation, lifting, and clamp pressure. Stop any plan that depends on unsafe improvisation.\n\n### Structure and Movement\n\nCheck load paths, racking resistance, joint orientation, fastener choice, panel construction, grain direction, seasonal wood movement, and attachment methods that permit movement where needed.\n\n### Fit and Function\n\nCheck room access, final dimensions, level and floor variation, door or drawer clearance, hardware templates, mating parts, ergonomics, and installation conditions.\n\n### Sequence and Recovery\n\nCheck reference-face discipline, part labeling, duplicate-part consistency, order of milling, glue-up staging, masking needs, and whether a test piece or dry fit is required.\n\n### Finish\n\nCheck species and grain behavior, glue contamination, sanding progression, stain or dye tests, topcoat compatibility, cure time, ventilation, and handling protection.\n\n## Method\n\n1. List the five to ten highest-impact project risks.\n2. Rate each by likelihood and consequence.\n3. Specify one preventive control and one recovery path where feasible.\n4. Escalate any risk that could cause injury, structural failure, or an unusable piece.\n5. Convert the result into hold points in the build plan.\n\n## Output\n\nUse a table with risk, trigger, consequence, prevention, recovery, and decision owner. End with the conditions that must be checked before cutting, glue-up, and finishing.",{"name":5,"description":7},"main","f0f0efe1d4c64b51a51f44427ad147750d29154e","agents\u002Ffurniture-making-lead\u002Fskills\u002Fproject-risk-review","https:\u002F\u002Fgithub.com\u002Fcwik-tech\u002Foctopus","www.cuteoctopus.site","https:\u002F\u002Fgithub.com\u002Fcwik-tech","2026-10-27 06:12:19",{"source":8,"skillName":5,"commands":32,"prompt":42,"zipAvailable":43},[33,36,39],{"tool":34,"command":35},"npx","npx skills add cwik-tech\u002Foctopus --skill project-risk-review",{"tool":37,"command":38},"bunx","bunx skills add cwik-tech\u002Foctopus --skill project-risk-review",{"tool":40,"command":41},"pnpm","pnpm dlx skills add cwik-tech\u002Foctopus --skill project-risk-review","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002Fcwik-tech\u002Foctopus\u002Fblob\u002Fmain\u002Fagents\u002Ffurniture-making-lead\u002Fskills\u002Fproject-risk-review\u002FSKILL.md",true,[],[46,53,60,67,74,81],{"skillNo":47,"name":48,"nameZh":6,"description":49,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":50,"categories":51,"keywords":52,"publishedAt":19},"01M7F5MQVQ3CHGM77Q51M4B1AC","twenty-year-land-plan","Apply the Bren discipline of evaluating every land and development decision on a twenty-year horizon, with a comprehensive plan for how the land, the community, and the surrounding public infrastructure evolve together. Deals optimized for a five-year exit are structurally different from deals that compound across generations; insist on knowing which kind you are making. Use when evaluating land, entitlements, master-planned development, or phasing decisions, and when separating five-year exit deals from generational holds.","https:\u002F\u002Fgithub.com\u002Fcwik-tech\u002Foctopus\u002Fblob\u002Fmain\u002Fskills\u002Ftwenty-year-land-plan\u002FSKILL.md",[],[],{"skillNo":54,"name":55,"nameZh":6,"description":56,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":57,"categories":58,"keywords":59,"publishedAt":19},"01M7F5MGQ8JSV27SFDQVVGFQE3","thematic-gut-check","Apply the Gray discipline of identifying the structural theme behind every real estate deal, testing where that theme sits in its capital-flow lifecycle, and insisting that deals without a named theme — or deals late in a crowded theme — clear a higher bar. A mediocre deal in a strong theme usually beats a clever deal in a weak one. Use when naming the structural thesis behind a deal, judging whether that theme is early or crowded, and setting the bar the deal must clear.","https:\u002F\u002Fgithub.com\u002Fcwik-tech\u002Foctopus\u002Fblob\u002Fmain\u002Fskills\u002Fthematic-gut-check\u002FSKILL.md",[],[],{"skillNo":61,"name":62,"nameZh":6,"description":63,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":64,"categories":65,"keywords":66,"publishedAt":19},"01M7F5M8V64Y0ZD8PTPWEJQXJ9","supply-pipeline-gut-check","Apply the Zell discipline of grounding every real estate thesis in the local supply pipeline. Demand counts over adjectives — units under construction, units permitted, units proposed — and convert them into a forward absorption schedule. A deal that ignores the pipeline is a bet on a market you have not actually studied. Use when validating a market thesis, forecasting absorption and rent growth, or counting units under construction, permitted, and proposed.","https:\u002F\u002Fgithub.com\u002Fcwik-tech\u002Foctopus\u002Fblob\u002Fmain\u002Fskills\u002Fsupply-pipeline-gut-check\u002FSKILL.md",[],[],{"skillNo":68,"name":69,"nameZh":6,"description":70,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":71,"categories":72,"keywords":73,"publishedAt":19},"01M7F5M3J2Q146BJC13TD3YCXF","ruin-scenario-mapping","Apply the Taleb discipline of identifying, for every real estate deal, the specific chain of events that produces ruin — permanent, unrecoverable capital loss — and verifying that no single such chain has non-trivial probability. Deals with any plausible ruin path must be restructured or abandoned. Use when sizing leverage, testing refinancing, covenant, and liquidity risk, or checking whether any single failure chain can permanently wipe out the position.","https:\u002F\u002Fgithub.com\u002Fcwik-tech\u002Foctopus\u002Fblob\u002Fmain\u002Fskills\u002Fruin-scenario-mapping\u002FSKILL.md",[],[],{"skillNo":75,"name":76,"nameZh":6,"description":77,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":78,"categories":79,"keywords":80,"publishedAt":19},"01M7F5KZDS0DYD172P6HS0WXEM","revenue-cost-architecture","Design a venture's revenue streams, pricing logic, cost structure, and unit economics so the business model has a coherent theory of value capture, not just value creation. Use after the value proposition and customer segment are set and before financial projections, when choosing a pricing model, calculating contribution margin or CAC payback, or checking whether the unit economics hold at scale.","https:\u002F\u002Fgithub.com\u002Fcwik-tech\u002Foctopus\u002Fblob\u002Fmain\u002Fskills\u002Frevenue-cost-architecture\u002FSKILL.md",[],[],{"skillNo":82,"name":83,"nameZh":6,"description":84,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":85,"categories":86,"keywords":87,"publishedAt":19},"01M7F5KP1CNQMYAVCDTV4EEW3J","replacement-cost-stress-test","Apply the Buffett discipline of pricing every real estate asset against the cost to rebuild it from scratch. The ratio of purchase price to replacement cost sets a ceiling on long-run downside: below replacement cost, new supply cannot profitably undercut you; at or above it, you are buying a liability disguised as an asset. Use when setting a purchase price, judging downside protection, or testing how exposed an asset is to newly built competing supply.","https:\u002F\u002Fgithub.com\u002Fcwik-tech\u002Foctopus\u002Fblob\u002Fmain\u002Fskills\u002Freplacement-cost-stress-test\u002FSKILL.md",[],[]]