cut-list-and-build-sequence
Converts furniture drawings into material-efficient cut lists, milling plans, and dependency-aware construction sequences. Use when preparing a woodworking project for purchasing, breakdown, milling, assembly, or shop execution.
- License 许可
- Apache-2.0
- 最近更新
- 2026-10-27
- Stars
- ★ 0
- Forks
- 0
01 前言 Front Matter
- name
- cut-list-and-build-sequence
- description
- Converts furniture drawings into material-efficient cut lists, milling plans, and dependency-aware construction sequences. Use when preparing a woodworking project for purchasing, breakdown, milling, assembly, or shop execution.
03 SKILL.md 正文
Cut List and Build Sequence
Purpose
Turn a dimensioned furniture design into an ordered, shop-ready plan that reduces waste, prevents sequencing mistakes, and preserves enough material for milling and fitting.
Cut List Rules
For every part, include quantity, material, rough size, finished size, grain direction, and notes.
- Separate rough-stock dimensions from finished dimensions.
- Add allowance for flattening, jointing, planing, saw kerf, defects, grain matching, and final trimming.
- Group parts by material thickness and grain-matching needs.
- Identify parts best cut as a matched set from the same board.
- Distinguish solid lumber from plywood or other sheet goods.
- Include edge banding, shop-made trim, back panels, drawer parts, hardware blocks, and test pieces.
- Calculate purchase quantities conservatively and state assumed stock sizes.
Sequencing Method
- Purchase and inspect stock; reserve attractive or matched boards for visible parts.
- Break down oversized material and allow solid wood to acclimate when appropriate.
- Mill components in batches: flatten, joint, plane, then rip and crosscut slightly oversize.
- Create joinery before final sizing where the joint method requires it.
- Dry-fit subassemblies; measure mating parts before final trim.
- Build stable subassemblies first, then complete the primary carcass or base.
- Fit moving parts—drawers, doors, panels, leaves—after the structure is square.
- Complete final shaping, sanding, finishing preparation, and finish application in a logical order.
- Install hardware and perform a final stability, fit, and surface check.
Buildability Checks
- Can every joint be cut with the available tools and safely held during machining?
- Can assemblies be clamped without inaccessible joints or impossible clamp angles?
- Are there glue-up stages small enough to manage before adhesive open time expires?
- Are cross-grain fasteners, breadboard ends, tabletop clips, or elongated holes required?
- Are dimensions for drawers and doors deferred until the opening is actually built?
Output Template
| Part | Qty. | Material | Rough size | Finished size | Grain/orientation | Notes |
|---|
Then provide a numbered build sequence with inspection points, dry-fit checkpoints, and decisions that should wait until mating parts are complete.
04 同仓库更多 Skills
twenty-year-land-plan
Apply the Bren discipline of evaluating every land and development decision on a twenty-year horizon, with a comprehensive plan for how the land, the community, and the surrounding public infrastructure evolve together. Deals optimized for a five-year exit are structurally different from deals that compound across generations; insist on knowing which kind you are making. Use when evaluating land, entitlements, master-planned development, or phasing decisions, and when separating five-year exit deals from generational holds.
thematic-gut-check
Apply the Gray discipline of identifying the structural theme behind every real estate deal, testing where that theme sits in its capital-flow lifecycle, and insisting that deals without a named theme — or deals late in a crowded theme — clear a higher bar. A mediocre deal in a strong theme usually beats a clever deal in a weak one. Use when naming the structural thesis behind a deal, judging whether that theme is early or crowded, and setting the bar the deal must clear.
supply-pipeline-gut-check
Apply the Zell discipline of grounding every real estate thesis in the local supply pipeline. Demand counts over adjectives — units under construction, units permitted, units proposed — and convert them into a forward absorption schedule. A deal that ignores the pipeline is a bet on a market you have not actually studied. Use when validating a market thesis, forecasting absorption and rent growth, or counting units under construction, permitted, and proposed.
ruin-scenario-mapping
Apply the Taleb discipline of identifying, for every real estate deal, the specific chain of events that produces ruin — permanent, unrecoverable capital loss — and verifying that no single such chain has non-trivial probability. Deals with any plausible ruin path must be restructured or abandoned. Use when sizing leverage, testing refinancing, covenant, and liquidity risk, or checking whether any single failure chain can permanently wipe out the position.
revenue-cost-architecture
Design a venture's revenue streams, pricing logic, cost structure, and unit economics so the business model has a coherent theory of value capture, not just value creation. Use after the value proposition and customer segment are set and before financial projections, when choosing a pricing model, calculating contribution margin or CAC payback, or checking whether the unit economics hold at scale.
replacement-cost-stress-test
Apply the Buffett discipline of pricing every real estate asset against the cost to rebuild it from scratch. The ratio of purchase price to replacement cost sets a ceiling on long-run downside: below replacement cost, new supply cannot profitably undercut you; at or above it, you are buying a liability disguised as an asset. Use when setting a purchase price, judging downside protection, or testing how exposed an asset is to newly built competing supply.