AGENT SKILL

psse

Progressive-disclosure workflow for PSS/E studies through PowerMCP. Use whenever the user wants to open a PSS/E case, solve the base case, discover the right PSSPY command, or run targeted PSS/E automation — even when they just say 'open this sav', 'solve it', or 'how do I change this in PSSE'. Expo

License 许可
MIT
最近更新
2026-11-09
Stars
★ 0
Forks
0

01 前言 Front Matter

name
psse
risk
low
source
https://github.com/Power-Agent/PowerSkills
license
MIT
version
1.0.0
category
electrical-engineering
description
Progressive-disclosure workflow for PSS/E studies through PowerMCP. Use whenever the user wants to open a PSS/E case, solve the base case, discover the right PSSPY command, or run targeted PSS/E automation — even when they just say 'open this sav', 'solve it', or 'how do I change this in PSSE'. Expo
imported_at
2026-09-20
source_path
powerskills-tool/skills/psse/SKILL.md
source_repository
Power-Agent/PowerSkills
disable-model-invocation
false

03 SKILL.md 正文

PSSE workflow

Treat PSSE as a layered interface. Start with the built-in base-case tools. Use generic psspy execution only after the correct command and argument shape are known.

Default tool ladder

  1. open_case(case)
  2. solve_case()
  3. search_psspy_commands(query, category) or lookup_psspy_command(function_name) to discover the right API entry point.
  4. run_psspy_command(function_name, arguments) only after the command contract is explicit.

Working rules

  • Do not use run_psspy_command as a search tool. Search or look up first.
  • Keep every executed command tied to a study objective, not just API curiosity.
  • Re-solve or re-check the case after commands that alter topology, controls, or dispatch.

Escalation triggers

Quote the bus or branch and its value rather than saying "violations exist". Use dynamic-stability-mitigation for dynamic-performance issues.

Observation Escalate to
Bus voltage < 0.95 or > 1.05 pu after solve_case voltage-violation-mitigation
Branch loading above its MVA rating thermal-overload-mitigation
Contingency run returns binding N-1 cases contingency-mitigation
solve_case fails to converge convergence-failure-mitigation
Fault duty near or above breaker interrupting ratings short-circuit-mitigation

Deliver

  • The case, the command path chosen, and why it was needed.
  • The arguments passed to the command.
  • The study outcome and any required mitigation.

04 同仓库更多 Skills