AGENT SKILL

pandapower

Progressive-disclosure workflow for pandapower power-system studies. Use whenever the user wants to load, build, or inspect a pandapower network, run AC power flow, check bus voltages or line and transformer loading, or screen N-1 contingencies — even when they just say 'run a load flow', 'check thi

License 许可
MIT
最近更新
2026-11-09
Stars
★ 0
Forks
0

01 前言 Front Matter

name
pandapower
risk
low
source
https://github.com/Power-Agent/PowerSkills
license
MIT
version
1.0.0
category
electrical-engineering
description
Progressive-disclosure workflow for pandapower power-system studies. Use whenever the user wants to load, build, or inspect a pandapower network, run AC power flow, check bus voltages or line and transformer loading, or screen N-1 contingencies — even when they just say 'run a load flow', 'check thi
imported_at
2026-09-20
source_path
powerskills-tool/skills/pandapower/SKILL.md
source_repository
Power-Agent/PowerSkills
disable-model-invocation
false

02 资源文件 7

03 SKILL.md 正文

pandapower workflow

Start with the network model and a clean base-case solve. Use contingency analysis only after the steady-state case is credible.

Default tool ladder

  1. load_network(file_path) or create_empty_network()
  2. get_network_info() to inspect buses, lines, transformers, generators, loads, and switches.
  3. run_power_flow(...) to establish the base operating point.
  4. run_contingency_analysis(...) only after the base case solves and the monitoring limits are clear.

Example sequence

Using the case39.json network shipped with this skill:

load_network("case39.json")   -> 39 buses, 34 lines, 12 transformers, 10 generators
get_network_info()            -> confirms slack bus, switch states, and rating fields
run_power_flow()              -> converged; report min/max res_bus.vm_pu and worst loading_percent
run_contingency_analysis()    -> ranks N-1 outages by the violations each one causes

Read the base-case numbers before running contingencies, then use the escalation table below on whatever the solve actually reports.

Working rules

  • Do not run contingencies before checking the base-case voltages and loading.
  • Use pandapower for AC feasibility and fast screening, then escalate only when the question requires more.

Escalation triggers

Map what the solve reports to the mitigation skill that handles it, and quote the numbers that tripped it (bus + vm_pu, element + loading %) rather than saying "violations exist".

Observation Escalate to
res_bus.vm_pu < 0.95 or > 1.05 voltage-violation-mitigation
res_line / res_trafo loading_percent > 100 thermal-overload-mitigation
run_contingency_analysis flags any N-1 violation or islanding contingency-mitigation
run_power_flow fails to converge convergence-failure-mitigation
The study is DER (PV, storage) integration on a distribution network der-hosting-capacity-mitigation

Local assets in this skill

  • case39.json — a ready test network.
  • scripts/network_analysis.py — structured base-case review.
  • scripts/contingency_analysis.py — local N-1 screening.

Deliver

  • The network loaded and whether the base case converged.
  • The key voltage or loading findings.
  • Whether contingency or mitigation work is now justified.