Progressive-disclosure workflow for Egret market and operations optimization. Use whenever the user wants to run DC-OPF, AC-OPF, or unit commitment through PowerMCP — even when they just say 'what's the cheapest dispatch', 'commit the units', 'check for congestion', or 'is this schedule feasible'. E

License 许可
MIT
最近更新
2026-11-09
Stars
★ 0
Forks
0

01 前言 Front Matter

name
egret
risk
low
source
https://github.com/Power-Agent/PowerSkills
license
MIT
version
1.0.0
category
electrical-engineering
description
Progressive-disclosure workflow for Egret market and operations optimization. Use whenever the user wants to run DC-OPF, AC-OPF, or unit commitment through PowerMCP — even when they just say 'what's the cheapest dispatch', 'commit the units', 'check for congestion', or 'is this schedule feasible'. E
imported_at
2026-09-20
source_path
powerskills-tool/skills/egret/SKILL.md
source_repository
Power-Agent/PowerSkills
disable-model-invocation
false

03 SKILL.md 正文

Egret workflow

Start with the cheapest model that can answer the question. Do not jump into unit commitment when a single-snapshot OPF will do.

Default tool ladder

  1. solve_dc_opf(case_file, solver, return_results) for fast feasibility and congestion screening.
  2. solve_ac_opf(case_file, solver, return_results) when voltage or reactive realism matters.
  3. solve_unit_commitment_problem(case_file, solver, mipgap, timelimit) only after the horizon, reserve logic, and commitment assumptions are clear.

Working rules

  • Confirm the case file format, solver, and time horizon before solving.
  • Use DC OPF first unless the question explicitly depends on AC feasibility.
  • Treat UC as a higher-cost study that needs a clear operational objective.
  • Validate promising dispatch fixes in an AC tool when voltage limits matter.

Escalation triggers

Quote the binding constraint or infeasibility cause rather than saying "it failed".

Observation Escalate to
OPF or UC infeasible, reserve-short, or implausibly expensive operations-planning-mitigation
AC-OPF bus voltage outside [0.95, 1.05] pu voltage-violation-mitigation
A branch limit binds persistently across the horizon thermal-overload-mitigation

Deliver

  • The case, solver, and study type.
  • The limiting constraints or binding tradeoffs.
  • Whether the next step is AC validation, UC escalation, or mitigation.