egret
Progressive-disclosure workflow for Egret market and operations optimization. Use whenever the user wants to run DC-OPF, AC-OPF, or unit commitment through PowerMCP — even when they just say 'what's the cheapest dispatch', 'commit the units', 'check for congestion', or 'is this schedule feasible'. E
- License 许可
- MIT
- 最近更新
- 2026-11-09
- Stars
- ★ 0
- Forks
- 0
01 前言 Front Matter
- name
- egret
- risk
- low
- source
- https://github.com/Power-Agent/PowerSkills
- license
- MIT
- version
- 1.0.0
- category
- electrical-engineering
- description
- Progressive-disclosure workflow for Egret market and operations optimization. Use whenever the user wants to run DC-OPF, AC-OPF, or unit commitment through PowerMCP — even when they just say 'what's the cheapest dispatch', 'commit the units', 'check for congestion', or 'is this schedule feasible'. E
- imported_at
- 2026-09-20
- source_path
- powerskills-tool/skills/egret/SKILL.md
- source_repository
- Power-Agent/PowerSkills
- disable-model-invocation
- false
03 SKILL.md 正文
Egret workflow
Start with the cheapest model that can answer the question. Do not jump into unit commitment when a single-snapshot OPF will do.
Default tool ladder
solve_dc_opf(case_file, solver, return_results)for fast feasibility and congestion screening.solve_ac_opf(case_file, solver, return_results)when voltage or reactive realism matters.solve_unit_commitment_problem(case_file, solver, mipgap, timelimit)only after the horizon, reserve logic, and commitment assumptions are clear.
Working rules
- Confirm the case file format, solver, and time horizon before solving.
- Use DC OPF first unless the question explicitly depends on AC feasibility.
- Treat UC as a higher-cost study that needs a clear operational objective.
- Validate promising dispatch fixes in an AC tool when voltage limits matter.
Escalation triggers
Quote the binding constraint or infeasibility cause rather than saying "it failed".
| Observation | Escalate to |
|---|---|
| OPF or UC infeasible, reserve-short, or implausibly expensive | operations-planning-mitigation |
| AC-OPF bus voltage outside [0.95, 1.05] pu | voltage-violation-mitigation |
| A branch limit binds persistently across the horizon | thermal-overload-mitigation |
Deliver
- The case, solver, and study type.
- The limiting constraints or binding tradeoffs.
- Whether the next step is AC validation, UC escalation, or mitigation.
04 同仓库更多 Skills
dei-assessment
Assess diversity, equity, and inclusion with metrics. TRIGGERS - Use when user needs help with dei-assessment related tasks.
dei-action-plan
Create DEI action plans with goals and initiatives. TRIGGERS - Use when user needs help with dei-action-plan related tasks.
culture-fit-assessment
Design culture add assessment processes. TRIGGERS - Use when user needs help with culture-fit-assessment related tasks.
cowork-to-code-bridge
Use an already-installed, independently verified cowork-to-code bridge to run narrowly approved actions on the user's own macOS, Linux, or WSL2 machine through a local file queue.
counter-offer-response
Draft counter-offer responses for retention. TRIGGERS - Use when user needs help with counter-offer-response related tasks.
continuous-feedback-system
Design continuous feedback systems. TRIGGERS - Use when user needs help with continuous-feedback-system related tasks.