01 前言 Front Matter

name
convergence-failure-mitigation
risk
low
source
https://github.com/Power-Agent/PowerSkills
license
MIT
version
1.0.0
category
electrical-engineering
description
Senior power-engineer playbook for power-flow convergence failures. Use whenever a base case or post-change case diverges, oscillates, or fails to solve in PSS/E, PSLF, PowerWorld, pandapower, PyPSA, surge, or OpenDSS. Triggers on 'power flow diverged', 'case won't solve', 'did not converge', 'blown
imported_at
2026-09-20
source_path
powerskills-engineering/skills/convergence-failure-mitigation/SKILL.md
source_repository
Power-Agent/PowerSkills
disable-model-invocation
false

03 SKILL.md 正文

Convergence failure mitigation

Start from the failed solve and its mismatch report. The goal is to learn why it failed, not just to force a solution.

Preferred action order

  1. Rule out data problems first: isolated or de-energized buses, zero or absurd branch impedances, missing or misplaced swing bus, transformer tap and phase-angle data, load/generation totals that cannot balance.
  2. Check islanding and slack coverage: every energized island needs a slack with feasible MW. Use the tool's island or topology report before touching solver settings.
  3. Simplify the solve, then restore: try flat start vs warm start, lock taps, switched shunts, and phase shifters, relax generator Q-limits — then re-enable controls stepwise once a solution exists.
  4. Seed from an easier point: a DC solve, a previously solved neighbor case, or a reduced-stress version of the case, then scale load or transfer toward the target in steps.
  5. If failure persists only near the target stress level, treat it as a feasibility boundary, not a numerical bug: reduce transfer or load, add reactive support, and flag possible voltage-collapse proximity.

Working rules

  • The largest mismatch bus tells you where to look — start there, not with global solver settings.
  • Change one solver setting at a time and record what finally solved.
  • A case solved with controls locked or Q-limits relaxed is not finished; restore realism before reporting results from it.
  • Distinguish "the math failed" from "the operating point does not exist" — the corrective actions are completely different.

Deliver

  • The failure category: data error, control interaction, numerical fragility, or physical infeasibility.
  • The specific change that made the case solve.
  • Any realism caveats that remain (locked controls, relaxed limits) and what to re-check.