[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M7F1P1BAC8CPZ3V5F5V61PVK":3,"skill-same:01M7F1P1BAC8CPZ3V5F5V61PVK":63},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":16,"categories":17,"keywords":18,"publishedAt":19,"linkOnly":20,"markdownContent":21,"markdownBody":22,"frontMatter":23,"refName":43,"commitSha":44,"skillDirectory":45,"forksCount":14,"repositoryHtmlUrl":46,"repositoryHomepageUrl":46,"ownerHtmlUrl":47,"ownerBlogUrl":6,"ownerDescription":6,"updatedAt":48,"install":49,"resources":62},"01M7F1P1BAC8CPZ3V5F5V61PVK","modeling-resource-depletion-economics",null,"Builds depletion models with production decline, reserve replacement economics, and terminal value analysis for finite-life assets. Use when modeling depletion, analyzing resource longevity, or evaluating reserve life economics.","Mr-Nobody-Anonymous\u002FAll-skills","Mr-Nobody-Anonymous","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F184253119?v=4","01M7AEXFJHKTYQW5R0ZCQQTWFV","anonymous","01M7C00M3GQR4QKP9GZA42GFAK",0,"Apache-2.0","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Feconomics\u002Fmodeling-resource-depletion-economics\u002FSKILL.md",[],[],"2026-11-16 10:05:34",false,"---\nname: modeling-resource-depletion-economics\nlanguage: en\ndescription: Builds depletion models with production decline, reserve replacement economics, and terminal value analysis for finite-life assets. Use when modeling depletion, analyzing resource longevity, or evaluating reserve life economics.\ntags:\n  - modeling\n  - real-assets-and-natural-resources\nmetadata:\n  author: casemark\n  practice_areas:\n    - Natural Resources\n    - Energy Capital\n    - Commodity Investment\n  document_types:\n    - Financial Model\n  skill_modes:\n    - Modeling\n    - Forecasting\nsource: \"https:\u002F\u002Fgithub.com\u002FCaseMark\u002Fskills\"\nsource_repository: \"CaseMark\u002Fskills\"\nsource_path: \"skills\u002Fcapital\u002Fmodeling-resource-depletion-economics\u002FSKILL.md\"\nlicense: \"Apache-2.0\"\nimported_at: \"2026-09-20\"\n---\n# Modeling Resource Depletion Economics\n\nBuilds depletion models with production decline, reserve replacement economics, and terminal value analysis for finite-life assets.\n\n## When To Use\n\n- Valuing oil & gas properties, mining concessions, or timber tracts where asset life is bounded by extractable reserves\n- Forecasting production revenue streams under hyperbolic, exponential, or harmonic decline assumptions\n- Evaluating reserve replacement economics — whether infill drilling, secondary recovery, or exploration capex extends economic life at acceptable returns\n- Calculating terminal\u002Fsalvage value and asset retirement obligations (ARO) for finite-life assets\n- Stress-testing resource investments against commodity price, decline rate, and cost escalation scenarios\n\n## Inputs To Gather\n\n- **Reserve estimates**: Proved (1P), proved + probable (2P), and contingent resource volumes with classification basis (SEC, PRMS, NI 51-101) [VERIFY classification standard used]\n- **Current production rates**: Recent monthly\u002Fquarterly production data (BOE\u002Fd, tons\u002Fmonth, MBF\u002Fyear as applicable)\n- **Decline curve parameters**: Initial decline rate (Di), b-factor (hyperbolic exponent), and minimum decline rate (Dmin) if using modified hyperbolic\n- **Commodity pricing**: Strip pricing, flat-price assumptions, or escalation model; specify real vs. nominal terms\n- **Operating costs**: LOE\u002Fper-unit lifting costs, royalties\u002Foverriding royalties, severance\u002Fad valorem taxes [VERIFY applicable fiscal regime]\n- **Capital program**: Maintenance capex, development capex schedule, and reserve replacement investment plan\n- **Discount rate \u002F WACC**: Risk-adjusted rate appropriate to resource type and jurisdiction\n- **ARO \u002F reclamation costs**: Plugging & abandonment, mine closure, or reforestation obligations with timing estimates\n\n## Workflow\n\n1. **Establish reserve base and production profile**\n   - Classify reserves by category (PDP, PDNP, PUD, probable, possible)\n   - Fit decline curves to historical production; select decline model (exponential for mature assets, hyperbolic for unconventional, harmonic where warranted)\n   - Set economic limit — production rate at which net revenue equals operating cost\n\n2. **Build revenue forecast**\n   - Apply production volumes to commodity price deck on a per-period basis\n   - Account for product mix (oil\u002Fgas\u002FNGL ratios, ore grade variation over mine life)\n   - Incorporate hedging or contract pricing if applicable\n\n3. **Layer in cost structure**\n   - Fixed vs. variable opex separation; apply per-unit variable costs to production schedule\n   - Schedule development capex tied to reserve category conversion (PUD → PDP)\n   - Include royalty burdens, production taxes, and income tax modeling [VERIFY royalty\u002Ftax rates by jurisdiction]\n\n4. **Model reserve replacement economics**\n   - For each tranche of replacement capex, calculate incremental reserves added, F&D cost ($\u002FBOE or $\u002Fton), and recycle ratio (netback ÷ F&D)\n   - Compare recycle ratios against hurdle (typically >1.5× for conventional, >2.0× for unconventional) [VERIFY current market benchmarks]\n   - Determine whether reserve additions extend asset life beyond base decline or merely slow decline rate\n\n5. **Calculate terminal value and ARO**\n   - Terminal value = salvage value of surface equipment + land residual − ARO obligation (discounted)\n   - For mining: include reclamation bonding costs and post-closure monitoring\n   - If perpetual tail production exists (e.g., low-rate stripper wells), capitalize at economic limit or apply a terminal multiple\n\n6. **Run depletion and valuation**\n   - Compute unit-of-production depletion for each period: (period production ÷ remaining reserves) × depletable basis\n   - Generate PV-10 (undiscounted and at 10% per SEC convention) and NPV at project WACC\n   - Calculate reserve life index (RLI = reserves ÷ annual production) at each forecast point\n\n7. **Sensitivity and scenario analysis**\n   - Vary commodity price (±20%, ±40%), decline rate (b-factor ±0.2), and opex escalation (CPI vs. oilfield-specific indices)\n   - Run breakeven analysis: minimum commodity price to achieve target IRR or positive NPV\n   - Tornado chart of top-5 value drivers ranked by impact on PV-10\n\n## Output\n\nThe completed model should include:\n\n- **Production forecast table**: Annual volumes by reserve category with cumulative depletion percentage\n- **Cash flow waterfall**: Revenue → royalties → opex → capex → taxes → net cash flow, per period\n- **Depletion schedule**: Unit-of-production depletion by period with remaining depletable basis\n- **Reserve replacement summary**: F&D cost, recycle ratio, and incremental RLI per capex tranche\n- **Valuation summary**: PV-10, NPV at WACC, IRR, and payback period\n- **Sensitivity outputs**: Tornado chart, breakeven price, and scenario comparison table\n- **Assumptions log**: Every key input with source, date, and [VERIFY] flags where data is uncertain\n\n## Quality Checks\n\n- Confirm cumulative production in forecast does not exceed total recoverable reserves (1P or 2P as specified)\n- Verify decline curve fit against at least 12 months of historical production — flag assets with insufficient history\n- Check that economic limit is correctly applied: no periods should show negative net operating income unless explicitly modeling pre-production or development phases\n- Ensure depletion basis ties to acquisition\u002Fdevelopment cost less accumulated depletion and impairment\n- Validate that PV-10 calculation uses pre-tax, pre-financing cash flows per SEC methodology when presented as PV-10 (vs. post-tax NPV)\n- Cross-check RLI trajectory — if RLI is increasing while production declines, confirm reserve additions are the driver\n- Confirm ARO timing is consistent with expected plug\u002Fabandonment or closure schedule, not artificially deferred\n","# Modeling Resource Depletion Economics\n\nBuilds depletion models with production decline, reserve replacement economics, and terminal value analysis for finite-life assets.\n\n## When To Use\n\n- Valuing oil & gas properties, mining concessions, or timber tracts where asset life is bounded by extractable reserves\n- Forecasting production revenue streams under hyperbolic, exponential, or harmonic decline assumptions\n- Evaluating reserve replacement economics — whether infill drilling, secondary recovery, or exploration capex extends economic life at acceptable returns\n- Calculating terminal\u002Fsalvage value and asset retirement obligations (ARO) for finite-life assets\n- Stress-testing resource investments against commodity price, decline rate, and cost escalation scenarios\n\n## Inputs To Gather\n\n- **Reserve estimates**: Proved (1P), proved + probable (2P), and contingent resource volumes with classification basis (SEC, PRMS, NI 51-101) [VERIFY classification standard used]\n- **Current production rates**: Recent monthly\u002Fquarterly production data (BOE\u002Fd, tons\u002Fmonth, MBF\u002Fyear as applicable)\n- **Decline curve parameters**: Initial decline rate (Di), b-factor (hyperbolic exponent), and minimum decline rate (Dmin) if using modified hyperbolic\n- **Commodity pricing**: Strip pricing, flat-price assumptions, or escalation model; specify real vs. nominal terms\n- **Operating costs**: LOE\u002Fper-unit lifting costs, royalties\u002Foverriding royalties, severance\u002Fad valorem taxes [VERIFY applicable fiscal regime]\n- **Capital program**: Maintenance capex, development capex schedule, and reserve replacement investment plan\n- **Discount rate \u002F WACC**: Risk-adjusted rate appropriate to resource type and jurisdiction\n- **ARO \u002F reclamation costs**: Plugging & abandonment, mine closure, or reforestation obligations with timing estimates\n\n## Workflow\n\n1. **Establish reserve base and production profile**\n   - Classify reserves by category (PDP, PDNP, PUD, probable, possible)\n   - Fit decline curves to historical production; select decline model (exponential for mature assets, hyperbolic for unconventional, harmonic where warranted)\n   - Set economic limit — production rate at which net revenue equals operating cost\n\n2. **Build revenue forecast**\n   - Apply production volumes to commodity price deck on a per-period basis\n   - Account for product mix (oil\u002Fgas\u002FNGL ratios, ore grade variation over mine life)\n   - Incorporate hedging or contract pricing if applicable\n\n3. **Layer in cost structure**\n   - Fixed vs. variable opex separation; apply per-unit variable costs to production schedule\n   - Schedule development capex tied to reserve category conversion (PUD → PDP)\n   - Include royalty burdens, production taxes, and income tax modeling [VERIFY royalty\u002Ftax rates by jurisdiction]\n\n4. **Model reserve replacement economics**\n   - For each tranche of replacement capex, calculate incremental reserves added, F&D cost ($\u002FBOE or $\u002Fton), and recycle ratio (netback ÷ F&D)\n   - Compare recycle ratios against hurdle (typically >1.5× for conventional, >2.0× for unconventional) [VERIFY current market benchmarks]\n   - Determine whether reserve additions extend asset life beyond base decline or merely slow decline rate\n\n5. **Calculate terminal value and ARO**\n   - Terminal value = salvage value of surface equipment + land residual − ARO obligation (discounted)\n   - For mining: include reclamation bonding costs and post-closure monitoring\n   - If perpetual tail production exists (e.g., low-rate stripper wells), capitalize at economic limit or apply a terminal multiple\n\n6. **Run depletion and valuation**\n   - Compute unit-of-production depletion for each period: (period production ÷ remaining reserves) × depletable basis\n   - Generate PV-10 (undiscounted and at 10% per SEC convention) and NPV at project WACC\n   - Calculate reserve life index (RLI = reserves ÷ annual production) at each forecast point\n\n7. **Sensitivity and scenario analysis**\n   - Vary commodity price (±20%, ±40%), decline rate (b-factor ±0.2), and opex escalation (CPI vs. oilfield-specific indices)\n   - Run breakeven analysis: minimum commodity price to achieve target IRR or positive NPV\n   - Tornado chart of top-5 value drivers ranked by impact on PV-10\n\n## Output\n\nThe completed model should include:\n\n- **Production forecast table**: Annual volumes by reserve category with cumulative depletion percentage\n- **Cash flow waterfall**: Revenue → royalties → opex → capex → taxes → net cash flow, per period\n- **Depletion schedule**: Unit-of-production depletion by period with remaining depletable basis\n- **Reserve replacement summary**: F&D cost, recycle ratio, and incremental RLI per capex tranche\n- **Valuation summary**: PV-10, NPV at WACC, IRR, and payback period\n- **Sensitivity outputs**: Tornado chart, breakeven price, and scenario comparison table\n- **Assumptions log**: Every key input with source, date, and [VERIFY] flags where data is uncertain\n\n## Quality Checks\n\n- Confirm cumulative production in forecast does not exceed total recoverable reserves (1P or 2P as specified)\n- Verify decline curve fit against at least 12 months of historical production — flag assets with insufficient history\n- Check that economic limit is correctly applied: no periods should show negative net operating income unless explicitly modeling pre-production or development phases\n- Ensure depletion basis ties to acquisition\u002Fdevelopment cost less accumulated depletion and impairment\n- Validate that PV-10 calculation uses pre-tax, pre-financing cash flows per SEC methodology when presented as PV-10 (vs. post-tax NPV)\n- Cross-check RLI trajectory — if RLI is increasing while production declines, confirm reserve additions are the driver\n- Confirm ARO timing is consistent with expected plug\u002Fabandonment or closure schedule, not artificially deferred\n",{"name":5,"tags":24,"source":27,"license":15,"language":28,"metadata":29,"description":7,"imported_at":40,"source_path":41,"source_repository":42},[25,26],"modeling","real-assets-and-natural-resources","https:\u002F\u002Fgithub.com\u002FCaseMark\u002Fskills","en",{"author":30,"skill_modes":31,"document_types":34,"practice_areas":36},"casemark",[32,33],"Modeling","Forecasting",[35],"Financial Model",[37,38,39],"Natural Resources","Energy Capital","Commodity Investment","2026-09-20","skills\u002Fcapital\u002Fmodeling-resource-depletion-economics\u002FSKILL.md","CaseMark\u002Fskills","main","2d1750717747097b602acf30bd09a7cbd4b4c6ea","awesome_skills\u002Feconomics\u002Fmodeling-resource-depletion-economics","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous","2026-11-09 11:45:36",{"source":8,"skillName":5,"commands":50,"prompt":60,"zipAvailable":61},[51,54,57],{"tool":52,"command":53},"npx","npx skills add Mr-Nobody-Anonymous\u002FAll-skills --skill modeling-resource-depletion-economics",{"tool":55,"command":56},"bunx","bunx skills add Mr-Nobody-Anonymous\u002FAll-skills --skill modeling-resource-depletion-economics",{"tool":58,"command":59},"pnpm","pnpm dlx skills add Mr-Nobody-Anonymous\u002FAll-skills --skill modeling-resource-depletion-economics","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Feconomics\u002Fmodeling-resource-depletion-economics\u002FSKILL.md",true,[],[64,72,79,86,93,100],{"skillNo":65,"name":66,"nameZh":6,"description":67,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":68,"licenseFileUrl":6,"sourceHtmlUrl":69,"categories":70,"keywords":71,"publishedAt":19},"01M7FFFZPC2025JQQHPHDX154J","dei-assessment","Assess diversity, equity, and inclusion with metrics. TRIGGERS - Use when user needs help with dei-assessment related tasks.","MIT","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Fhr-people\u002Fdei-assessment\u002FSKILL.md",[],[],{"skillNo":73,"name":74,"nameZh":6,"description":75,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":68,"licenseFileUrl":6,"sourceHtmlUrl":76,"categories":77,"keywords":78,"publishedAt":19},"01M7FFFWN8H4WA7A6Y398QKB6J","dei-action-plan","Create DEI action plans with goals and initiatives. TRIGGERS - Use when user needs help with dei-action-plan related tasks.","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Fhr-people\u002Fdei-action-plan\u002FSKILL.md",[],[],{"skillNo":80,"name":81,"nameZh":6,"description":82,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":68,"licenseFileUrl":6,"sourceHtmlUrl":83,"categories":84,"keywords":85,"publishedAt":19},"01M7FFFSHTM0QZRVZ2NRJTJ0PY","culture-fit-assessment","Design culture add assessment processes. TRIGGERS - Use when user needs help with culture-fit-assessment related tasks.","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Fhr-people\u002Fculture-fit-assessment\u002FSKILL.md",[],[],{"skillNo":87,"name":88,"nameZh":6,"description":89,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":68,"licenseFileUrl":6,"sourceHtmlUrl":90,"categories":91,"keywords":92,"publishedAt":19},"01M7FFFMA12RKEQA38KHJSXXPS","cowork-to-code-bridge","Use an already-installed, independently verified cowork-to-code bridge to run narrowly approved actions on the user's own macOS, Linux, or WSL2 machine through a local file queue.","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Fhr-people\u002Fcowork-to-code-bridge\u002FSKILL.md",[],[],{"skillNo":94,"name":95,"nameZh":6,"description":96,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":68,"licenseFileUrl":6,"sourceHtmlUrl":97,"categories":98,"keywords":99,"publishedAt":19},"01M7FFFH1F6M8YRGW5V487GH1K","counter-offer-response","Draft counter-offer responses for retention. TRIGGERS - Use when user needs help with counter-offer-response related tasks.","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Fhr-people\u002Fcounter-offer-response\u002FSKILL.md",[],[],{"skillNo":101,"name":102,"nameZh":6,"description":103,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":68,"licenseFileUrl":6,"sourceHtmlUrl":104,"categories":105,"keywords":106,"publishedAt":19},"01M7FFFDGEHV8Y7J9N40HZXW52","continuous-feedback-system","Design continuous feedback systems. TRIGGERS - Use when user needs help with continuous-feedback-system related tasks.","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Fhr-people\u002Fcontinuous-feedback-system\u002FSKILL.md",[],[]]