[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M7F1NTPD66SY7A8Z3465K545":3,"skill-same:01M7F1NTPD66SY7A8Z3465K545":64},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":16,"categories":17,"keywords":18,"publishedAt":19,"linkOnly":20,"markdownContent":21,"markdownBody":22,"frontMatter":23,"refName":44,"commitSha":45,"skillDirectory":46,"forksCount":14,"repositoryHtmlUrl":47,"repositoryHomepageUrl":47,"ownerHtmlUrl":48,"ownerBlogUrl":6,"ownerDescription":6,"updatedAt":49,"install":50,"resources":63},"01M7F1NTPD66SY7A8Z3465K545","modeling-mining-project-economics",null,"Builds mining project financial models with resource estimation, mine plan integration, and commodity price sensitivity analysis. Use when modeling mining investments, analyzing feasibility studies, or evaluating mineral assets.","Mr-Nobody-Anonymous\u002FAll-skills","Mr-Nobody-Anonymous","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F184253119?v=4","01M7AEXFJHKTYQW5R0ZCQQTWFV","anonymous","01M7C00M3GQR4QKP9GZA42GFAK",0,"Apache-2.0","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Feconomics\u002Fmodeling-mining-project-economics\u002FSKILL.md",[],[],"2026-11-16 10:05:34",false,"---\nname: modeling-mining-project-economics\nlanguage: en\ndescription: Builds mining project financial models with resource estimation, mine plan integration, and commodity price sensitivity analysis. Use when modeling mining investments, analyzing feasibility studies, or evaluating mineral assets.\ntags:\n  - modeling\n  - real-assets-and-natural-resources\n  - investment\nmetadata:\n  author: casemark\n  practice_areas:\n    - Natural Resources\n    - Energy Capital\n    - Commodity Investment\n  document_types:\n    - Financial Model\n  skill_modes:\n    - Modeling\n    - Forecasting\nsource: \"https:\u002F\u002Fgithub.com\u002FCaseMark\u002Fskills\"\nsource_repository: \"CaseMark\u002Fskills\"\nsource_path: \"skills\u002Fcapital\u002Fmodeling-mining-project-economics\u002FSKILL.md\"\nlicense: \"Apache-2.0\"\nimported_at: \"2026-09-20\"\n---\n# Modeling Mining Project Economics\n\nBuilds mining project financial models with resource estimation, mine plan integration, and commodity price sensitivity analysis.\n\n## When To Use\n\n- Evaluating a mining project at PEA, pre-feasibility, or bankable feasibility stage\n- Modeling acquisition economics for an operating or development-stage mineral asset\n- Running commodity price sensitivity on an existing mine plan\n- Stress-testing capital structure or financing scenarios for a mining investment\n- Comparing multiple deposit or project alternatives on a risk-adjusted basis\n\n## Inputs To Gather\n\n- **Resource\u002Freserve statement** — NI 43-101 or JORC-compliant technical report with measured, indicated, and inferred tonnages and grades\n- **Mine plan** — annual production schedule (tonnes mined, strip ratio or development metres, processing throughput), mine life, and phasing\n- **Metallurgical recovery** — process flow, expected recoveries by ore type, and concentrate specifications\n- **Capital cost estimates** — initial capex (direct and indirect), sustaining capex schedule, closure\u002Freclamation costs, and contingency percentages\n- **Operating cost breakdown** — mining cost per tonne moved, processing cost per tonne milled, G&A, transport, and refining\u002Ftreatment charges (TC\u002FRC)\n- **Commodity price assumptions** — spot, forward curve, broker consensus, and long-term real price deck; specify currency and inflation basis\n- **Fiscal regime** — royalty structure (NSR, ad valorem, profit-based), corporate tax rate, depreciation\u002Famortization rules, withholding taxes, and any stability agreements [VERIFY jurisdiction-specific rates and royalty formulas]\n- **Financing terms** — debt quantum, interest rate, tenor, repayment profile, hedging commitments, stream\u002Froyalty obligations if applicable\n- **Discount rate inputs** — risk-free rate, equity risk premium, country risk premium, beta, and any project-specific risk adjustments\n\n## Workflow\n\n1. **Structure the production model**\n   - Map annual mine plan into the model: ore tonnes, waste tonnes, strip ratio, mill feed, head grade, and recovery\n   - Separate open-pit and underground if both methods apply\n   - Apply grade-tonnage curves to test sensitivity around cut-off grade assumptions\n\n2. **Build the revenue module**\n   - Calculate payable metal production (recovered metal × payable percentage)\n   - Deduct treatment charges, refining charges, and transport costs to arrive at net smelter return (NSR)\n   - Link revenue to the commodity price deck; allow toggling between spot, consensus, and user-defined scenarios\n\n3. **Model operating costs**\n   - Structure costs as mining, processing, G&A, and selling\u002Ftransport on a per-unit basis (cost per tonne mined, cost per tonne milled)\n   - Escalate costs annually using relevant inflation indices (CPI, diesel, labour, power)\n   - Calculate all-in sustaining cost (AISC) and all-in cost (AIC) per payable ounce\u002Fpound\u002Ftonne for benchmarking\n\n4. **Populate the capital schedule**\n   - Phase initial capex across the construction timeline; apply drawdown curves\n   - Schedule sustaining capex, deferred stripping or development, and expansion capex\n   - Include closure and rehabilitation provisions with timing assumptions\n\n5. **Apply the fiscal regime**\n   - Model royalty calculations specific to jurisdiction (NSR-based, profit-based, sliding scale) [VERIFY]\n   - Build tax depreciation schedules (straight-line, declining balance, or units-of-production as applicable) [VERIFY]\n   - Calculate taxable income, tax losses carried forward, and cash tax payable\n   - Include any tax holidays, investment incentives, or stability agreement terms [VERIFY]\n\n6. **Construct the cash flow waterfall**\n   - Build pre-tax and after-tax free cash flow (FCF) from revenue through capex and taxes\n   - Layer in debt service (drawdowns, interest, principal repayment) to derive levered FCF and equity cash flows\n   - If streaming or royalty financing exists, model as a separate cash flow deduction\n\n7. **Calculate valuation metrics**\n   - NPV at multiple discount rates (typically 5%, 8%, 10% real)\n   - IRR (project-level and equity-level)\n   - Payback period (simple and discounted)\n   - NPV\u002Fcapex ratio as a capital efficiency indicator\n\n8. **Run sensitivity and scenario analysis**\n   - One-variable sensitivity: commodity price, grade, recovery, capex, opex, discount rate, FX rate\n   - Two-variable tornado chart: price vs. grade, price vs. capex\n   - Scenario analysis: base case, upside (higher price \u002F higher grade), downside (lower price \u002F cost overrun \u002F delayed ramp-up)\n   - Monte Carlo simulation inputs if probabilistic analysis is required (define distributions for key variables)\n\n## Output\n\n- **Executive summary** — project NPV, IRR, payback, and AISC at base case with 2–3 key sensitivities highlighted\n- **Annual cash flow schedule** — production, revenue, opex, capex, taxes, and FCF by year over the mine life\n- **Sensitivity tables** — NPV and IRR across a matrix of commodity prices and discount rates\n- **Tornado chart** — ranking of variables by impact on NPV\n- **Unit cost analysis** — cash cost, AISC, and AIC benchmarked against industry peers\n- **Financing summary** — debt coverage ratios (DSCR, LLCR) if project finance is modeled\n- **Assumption register** — every input with source, date, and [VERIFY] flags for jurisdiction-dependent items\n\n## Quality Checks\n\n- Confirm resource classification (measured\u002Findicated vs. inferred) matches the study stage — do not include inferred resources in feasibility-level economics without flagging\n- Reconcile total mine production in the model against the mine plan in the technical report (within ±2%)\n- Verify that AISC calculation follows World Gold Council or equivalent industry standard methodology\n- Cross-check tax and royalty calculations against published fiscal terms for the jurisdiction [VERIFY]\n- Ensure discount rate assumptions are consistent with the project's risk profile and peer comparables\n- Validate that the model balances: opening cash + sources = uses + closing cash in every period\n- Test boundary conditions — zero price, zero grade, and maximum capex overrun should produce logical (negative) results, not errors\n- Flag any circular references (e.g., tax ↔ interest ↔ debt sizing) and document the resolution method (iteration or hard-code break)\n","# Modeling Mining Project Economics\n\nBuilds mining project financial models with resource estimation, mine plan integration, and commodity price sensitivity analysis.\n\n## When To Use\n\n- Evaluating a mining project at PEA, pre-feasibility, or bankable feasibility stage\n- Modeling acquisition economics for an operating or development-stage mineral asset\n- Running commodity price sensitivity on an existing mine plan\n- Stress-testing capital structure or financing scenarios for a mining investment\n- Comparing multiple deposit or project alternatives on a risk-adjusted basis\n\n## Inputs To Gather\n\n- **Resource\u002Freserve statement** — NI 43-101 or JORC-compliant technical report with measured, indicated, and inferred tonnages and grades\n- **Mine plan** — annual production schedule (tonnes mined, strip ratio or development metres, processing throughput), mine life, and phasing\n- **Metallurgical recovery** — process flow, expected recoveries by ore type, and concentrate specifications\n- **Capital cost estimates** — initial capex (direct and indirect), sustaining capex schedule, closure\u002Freclamation costs, and contingency percentages\n- **Operating cost breakdown** — mining cost per tonne moved, processing cost per tonne milled, G&A, transport, and refining\u002Ftreatment charges (TC\u002FRC)\n- **Commodity price assumptions** — spot, forward curve, broker consensus, and long-term real price deck; specify currency and inflation basis\n- **Fiscal regime** — royalty structure (NSR, ad valorem, profit-based), corporate tax rate, depreciation\u002Famortization rules, withholding taxes, and any stability agreements [VERIFY jurisdiction-specific rates and royalty formulas]\n- **Financing terms** — debt quantum, interest rate, tenor, repayment profile, hedging commitments, stream\u002Froyalty obligations if applicable\n- **Discount rate inputs** — risk-free rate, equity risk premium, country risk premium, beta, and any project-specific risk adjustments\n\n## Workflow\n\n1. **Structure the production model**\n   - Map annual mine plan into the model: ore tonnes, waste tonnes, strip ratio, mill feed, head grade, and recovery\n   - Separate open-pit and underground if both methods apply\n   - Apply grade-tonnage curves to test sensitivity around cut-off grade assumptions\n\n2. **Build the revenue module**\n   - Calculate payable metal production (recovered metal × payable percentage)\n   - Deduct treatment charges, refining charges, and transport costs to arrive at net smelter return (NSR)\n   - Link revenue to the commodity price deck; allow toggling between spot, consensus, and user-defined scenarios\n\n3. **Model operating costs**\n   - Structure costs as mining, processing, G&A, and selling\u002Ftransport on a per-unit basis (cost per tonne mined, cost per tonne milled)\n   - Escalate costs annually using relevant inflation indices (CPI, diesel, labour, power)\n   - Calculate all-in sustaining cost (AISC) and all-in cost (AIC) per payable ounce\u002Fpound\u002Ftonne for benchmarking\n\n4. **Populate the capital schedule**\n   - Phase initial capex across the construction timeline; apply drawdown curves\n   - Schedule sustaining capex, deferred stripping or development, and expansion capex\n   - Include closure and rehabilitation provisions with timing assumptions\n\n5. **Apply the fiscal regime**\n   - Model royalty calculations specific to jurisdiction (NSR-based, profit-based, sliding scale) [VERIFY]\n   - Build tax depreciation schedules (straight-line, declining balance, or units-of-production as applicable) [VERIFY]\n   - Calculate taxable income, tax losses carried forward, and cash tax payable\n   - Include any tax holidays, investment incentives, or stability agreement terms [VERIFY]\n\n6. **Construct the cash flow waterfall**\n   - Build pre-tax and after-tax free cash flow (FCF) from revenue through capex and taxes\n   - Layer in debt service (drawdowns, interest, principal repayment) to derive levered FCF and equity cash flows\n   - If streaming or royalty financing exists, model as a separate cash flow deduction\n\n7. **Calculate valuation metrics**\n   - NPV at multiple discount rates (typically 5%, 8%, 10% real)\n   - IRR (project-level and equity-level)\n   - Payback period (simple and discounted)\n   - NPV\u002Fcapex ratio as a capital efficiency indicator\n\n8. **Run sensitivity and scenario analysis**\n   - One-variable sensitivity: commodity price, grade, recovery, capex, opex, discount rate, FX rate\n   - Two-variable tornado chart: price vs. grade, price vs. capex\n   - Scenario analysis: base case, upside (higher price \u002F higher grade), downside (lower price \u002F cost overrun \u002F delayed ramp-up)\n   - Monte Carlo simulation inputs if probabilistic analysis is required (define distributions for key variables)\n\n## Output\n\n- **Executive summary** — project NPV, IRR, payback, and AISC at base case with 2–3 key sensitivities highlighted\n- **Annual cash flow schedule** — production, revenue, opex, capex, taxes, and FCF by year over the mine life\n- **Sensitivity tables** — NPV and IRR across a matrix of commodity prices and discount rates\n- **Tornado chart** — ranking of variables by impact on NPV\n- **Unit cost analysis** — cash cost, AISC, and AIC benchmarked against industry peers\n- **Financing summary** — debt coverage ratios (DSCR, LLCR) if project finance is modeled\n- **Assumption register** — every input with source, date, and [VERIFY] flags for jurisdiction-dependent items\n\n## Quality Checks\n\n- Confirm resource classification (measured\u002Findicated vs. inferred) matches the study stage — do not include inferred resources in feasibility-level economics without flagging\n- Reconcile total mine production in the model against the mine plan in the technical report (within ±2%)\n- Verify that AISC calculation follows World Gold Council or equivalent industry standard methodology\n- Cross-check tax and royalty calculations against published fiscal terms for the jurisdiction [VERIFY]\n- Ensure discount rate assumptions are consistent with the project's risk profile and peer comparables\n- Validate that the model balances: opening cash + sources = uses + closing cash in every period\n- Test boundary conditions — zero price, zero grade, and maximum capex overrun should produce logical (negative) results, not errors\n- Flag any circular references (e.g., tax ↔ interest ↔ debt sizing) and document the resolution method (iteration or hard-code break)\n",{"name":5,"tags":24,"source":28,"license":15,"language":29,"metadata":30,"description":7,"imported_at":41,"source_path":42,"source_repository":43},[25,26,27],"modeling","real-assets-and-natural-resources","investment","https:\u002F\u002Fgithub.com\u002FCaseMark\u002Fskills","en",{"author":31,"skill_modes":32,"document_types":35,"practice_areas":37},"casemark",[33,34],"Modeling","Forecasting",[36],"Financial Model",[38,39,40],"Natural Resources","Energy Capital","Commodity Investment","2026-09-20","skills\u002Fcapital\u002Fmodeling-mining-project-economics\u002FSKILL.md","CaseMark\u002Fskills","main","2d1750717747097b602acf30bd09a7cbd4b4c6ea","awesome_skills\u002Feconomics\u002Fmodeling-mining-project-economics","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous","2026-11-09 11:45:36",{"source":8,"skillName":5,"commands":51,"prompt":61,"zipAvailable":62},[52,55,58],{"tool":53,"command":54},"npx","npx skills add Mr-Nobody-Anonymous\u002FAll-skills --skill modeling-mining-project-economics",{"tool":56,"command":57},"bunx","bunx skills add Mr-Nobody-Anonymous\u002FAll-skills --skill modeling-mining-project-economics",{"tool":59,"command":60},"pnpm","pnpm dlx skills add Mr-Nobody-Anonymous\u002FAll-skills --skill modeling-mining-project-economics","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Feconomics\u002Fmodeling-mining-project-economics\u002FSKILL.md",true,[],[65,73,80,87,94,101],{"skillNo":66,"name":67,"nameZh":6,"description":68,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":69,"licenseFileUrl":6,"sourceHtmlUrl":70,"categories":71,"keywords":72,"publishedAt":19},"01M7FFFZPC2025JQQHPHDX154J","dei-assessment","Assess diversity, equity, and inclusion with metrics. TRIGGERS - Use when user needs help with dei-assessment related tasks.","MIT","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Fhr-people\u002Fdei-assessment\u002FSKILL.md",[],[],{"skillNo":74,"name":75,"nameZh":6,"description":76,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":69,"licenseFileUrl":6,"sourceHtmlUrl":77,"categories":78,"keywords":79,"publishedAt":19},"01M7FFFWN8H4WA7A6Y398QKB6J","dei-action-plan","Create DEI action plans with goals and initiatives. TRIGGERS - Use when user needs help with dei-action-plan related tasks.","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Fhr-people\u002Fdei-action-plan\u002FSKILL.md",[],[],{"skillNo":81,"name":82,"nameZh":6,"description":83,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":69,"licenseFileUrl":6,"sourceHtmlUrl":84,"categories":85,"keywords":86,"publishedAt":19},"01M7FFFSHTM0QZRVZ2NRJTJ0PY","culture-fit-assessment","Design culture add assessment processes. TRIGGERS - Use when user needs help with culture-fit-assessment related tasks.","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Fhr-people\u002Fculture-fit-assessment\u002FSKILL.md",[],[],{"skillNo":88,"name":89,"nameZh":6,"description":90,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":69,"licenseFileUrl":6,"sourceHtmlUrl":91,"categories":92,"keywords":93,"publishedAt":19},"01M7FFFMA12RKEQA38KHJSXXPS","cowork-to-code-bridge","Use an already-installed, independently verified cowork-to-code bridge to run narrowly approved actions on the user's own macOS, Linux, or WSL2 machine through a local file queue.","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Fhr-people\u002Fcowork-to-code-bridge\u002FSKILL.md",[],[],{"skillNo":95,"name":96,"nameZh":6,"description":97,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":69,"licenseFileUrl":6,"sourceHtmlUrl":98,"categories":99,"keywords":100,"publishedAt":19},"01M7FFFH1F6M8YRGW5V487GH1K","counter-offer-response","Draft counter-offer responses for retention. TRIGGERS - Use when user needs help with counter-offer-response related tasks.","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Fhr-people\u002Fcounter-offer-response\u002FSKILL.md",[],[],{"skillNo":102,"name":103,"nameZh":6,"description":104,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":69,"licenseFileUrl":6,"sourceHtmlUrl":105,"categories":106,"keywords":107,"publishedAt":19},"01M7FFFDGEHV8Y7J9N40HZXW52","continuous-feedback-system","Design continuous feedback systems. TRIGGERS - Use when user needs help with continuous-feedback-system related tasks.","https:\u002F\u002Fgithub.com\u002FMr-Nobody-Anonymous\u002FAll-skills\u002Fblob\u002Fmain\u002Fawesome_skills\u002Fhr-people\u002Fcontinuous-feedback-system\u002FSKILL.md",[],[]]