gp-uvmclick
Create and complete the UVM funding proposal record in UVMClick (grants.connect.uvm.edu) — SmartForm pages, document uploads, budget periods, IBB F&A sheet, compliance answers, and the UVMClick budget — up to routing. Use for "start UVMClick", "fill UVMClick", "FP0000…", "UVMClick budget", "IBB allocation", or before opening grants.connect.uvm.edu.
- License 许可
- GPL-3.0
- 最近更新
- 2026-11-13
- Stars
- ★ 0
- Forks
- 0
01 前言 Front Matter
- name
- gp-uvmclick
- description
- Create and complete the UVM funding proposal record in UVMClick (grants.connect.uvm.edu) — SmartForm pages, document uploads, budget periods, IBB F&A sheet, compliance answers, and the UVMClick budget — up to routing. Use for "start UVMClick", "fill UVMClick", "FP0000…", "UVMClick budget", "IBB allocation", or before opening grants.connect.uvm.edu.
03 SKILL.md 正文
gp-uvmclick
Read ~/.claude/skills/using-grantpowers/references/browser.md and
references/uvm-facts.md first. The PI signs in. Certify and
"Submit For Department Review" belong to gp-spa-route.
SmartForm (Create Funding Proposal)
Fill every page from the proposal's facts; never invent:
- General Proposal Information.
- Fill the title, sponsor (NSF), and the activity type (RESEARCH – Basic).
- Fill the start and end dates. Check the end date: the form defaults to 5 years.
- Personnel. Add the PI. Add others only if they are named in the budget.
- Submission Information.
- S2S: No. Method: "SPA RA will submit via Sponsor's electronic submission system".
- Who submits: the AOR, through Research.gov, with the temp ID.
- Upload every final PDF under Submission Documents, and the SPA form, internal budget, COA and IBB sheet under Internal Supporting Documents, using the drag-drop technique.
- Budget Periods and Key Dates.
- Set the deadline.
- Set the number of periods to the duration: use Remove Period until the end date is right, then re-read the page.
- IBB F&A Allocation.
- Does it include F&A? Yes.
- Download the IBB tool (URL in uvm-facts) and fill it, giving 100% to the PI's department. Upload it through the "Upload" dialog (iframe).
- Deviation: No.
- Review and Approvals. PI eligibility, construction, F&A waiver: No, unless the PI says otherwise.
- Compliance Review.
- Human subjects, animals, radioactive materials, stem cells, NIH DMS: No.
- Gain-of-function: "I Confirm" (the work is not dangerous gain-of-function research), unless the PI says otherwise.
- Additional Proposal Information. Program income, cancer, SBIR, STTR, off-site research: No, unless the PI says otherwise.
- Completion Instructions. Finish.
UVMClick budget (workspace → Working Budgets → [Edit])
- General.
- Standard F&A: yes. Rate limitation: no.
- Personnel inflation 4%, with Inflate Period 1 checked when the NSF budget raises the salary before year 1.
- General inflation 0.
- Personnel Cost Definition. "Import Proposal Personnel" brings in the PI. Set "budget summer separately" to Yes. Add a "Staff Member To Be Determined" row for the Graduate Student (12 months), with the stipend base.
- Personnel Costs. Click Edit, then for each period:
- PI: summer effort 2 months, summer salary-request months 2, fringe rate (see uvm-facts).
- Student: 3 months for a 25% appointment, fringe 13%. Click the grid's Save.
- General Cost Definition. Add one line per category, from the cost-type list. Tuition goes under "Tuition & Fees", excluded from indirect.
- General Costs. Click Edit, set the per-period amounts (e.g. publication in year 2 only, tuition rising), and click the grid's Save.
- Compare the totals with the NSF budget. Report any difference above $15, and any default rate that differs from the NSF budget (e.g. the fringe rate).
04 同仓库更多 Skills
writing-skills
Use when creating new skills, editing existing skills, or verifying skills work before deployment
writing-plans
Use when you have a spec or requirements for a multi-step task, before touching code
verification-before-completion
Use when about to claim work is complete, fixed, or passing, before committing or creating PRs - requires running verification commands and confirming output before making any success claims; evidence before assertions always
using-superpowers
Use when starting any conversation - establishes how to find and use skills, requiring skill invocation before ANY response including clarifying questions
using-git-worktrees
Use when starting feature work that needs isolation from current workspace or before executing implementation plans - ensures an isolated workspace exists via native tools or git worktree fallback
test-driven-development
Use when implementing any feature or bugfix, before writing implementation code