goal-management
暂无简介
- License 许可
- MIT
- 最近更新
- 2026-10-16
- Stars
- ★ 0
- Forks
- 0
02 资源文件 6
- 参考文档checks/goal-management-checklist.md2.1 KB
- 参考文档manifest.json2.2 KB
- 参考文档references/goal-management-guide.md3.9 KB
- 脚本scripts/verify.sh3.8 KB
- 参考文档templates/goal-management-spec.md2.6 KB
- 参考文档templates/goal-management-template.md808 B
03 SKILL.md 正文
Prumo Goal Authoring, Phasing & Lock Management
Purpose
Author and manage Prumo Goals with measurable acceptance criteria, phased execution plans, evidence linkage, and lock discipline — so scope is explicit, progress is verifiable, and locked criteria can never be silently weakened.
Use when
- Authoring a new Goal: title, context, acceptance criteria, phase breakdown, evidence plan.
- Phasing execution: sequencing slices, assigning owners, defining per-phase exit gates.
- Locking criteria: freezing acceptance terms before implementation begins.
- Auditing Goal health: stale locks, unmapped criteria, evidence gaps, scope drift.
Do not use when
- Writing application code toward a Goal (use the domain skill; this skill manages the Goal itself).
- Running git branching or pull request mechanics (use
git-workflow). - Measuring performance or auditing complexity inside a Goal's tasks (use
benchmarking,code-quality). - Weakening a locked criterion because implementation is hard — that requires a recorded re-scope decision, never a quiet edit.
Required context
- Goal statement in one sentence plus the problem it solves and the explicit non-goals.
- Acceptance criteria as measurable predicates (numbers, named tests, named gates), each with its evidence type.
- Phase list with owners, exit gates, and dependencies between phases.
- Lock state: which criteria are locked, by whom, and at which commit or timestamp.
Procedure
- Author the Goal with measurable criteria:
- Write the title as an outcome (
Tiered pricing computes within 0.01 of golden fixtures), not an activity (Work on pricing). - Express every acceptance criterion as a falsifiable predicate:
p99 render latency at most 120 ms at 500 rps measured by k6 run load/invoice-endpoint.js, neverfast enough. - List non-goals explicitly (e.g. multi-currency support excluded; PDF layout untouched) to bound scope disputes later.
- Write the title as an outcome (
- Phase the work into gated slices:
- Split into phases of 1–3 days each with a single owner: Phase 1 data model, Phase 2 computation, Phase 3 API exposure, Phase 4 rollout.
- Define each phase's exit gate in the same measurable style (
Phase 2 exits when TestCalculateTieredPrice 18/18 green plus benchstat delta beyond noise). - Record phase dependencies (Phase 3 needs Phase 1's struct; Phase 4 needs the release-engineering rollout plan) so blocked phases are visible, not surprising.
- Lock criteria before implementation:
- Freeze acceptance criteria with
prumo goal lock billing-tiered-pricing --criteria AC1,AC2,AC3,AC4; record the lock commit and timestamp in the Goal file. - After locking, any criterion change requires a re-scope entry: reason, authorizer, and impact on completed phases. Silent edits to locked lines are prohibited.
- Verify lock integrity in review:
git diff <lock-commit>..HEAD -- goals/billing-tiered-pricing.mdmust show changes only in status and evidence sections.
- Freeze acceptance criteria with
- Link evidence continuously:
- Append evidence per criterion as work lands: test run IDs, benchmark summaries, review links (PR billing-api#482 for AC1–AC3).
- Mark a criterion satisfied only when its named evidence exists and passes; partial evidence keeps the criterion open with a dated note.
- Run the Goal health check weekly: every open criterion has an owner and a next action dated within 7 days, or it is flagged stale.
- Close or re-scope explicitly:
- Close the Goal when all criteria are satisfied with linked evidence; record the closing commit and a one-paragraph outcome note.
- If scope must change, file the re-scope entry first, update phases and owners, then continue — never edit locked criteria mid-flight without the entry.
- Run the verification script
scripts/verify.shfrom the repo root; it must exit 0.
Decision rules
- Criteria Are Predicates or They Do Not Exist: Unmeasurable criteria (
robust,clean,fast) are rewritten before the Goal is accepted. - Locked Means Append-Only: Locked criteria lines change only via recorded re-scope entries; direct edits fail review.
- No Orphan Criteria: Every criterion has exactly one owner and one evidence type from authoring time; orphans block Goal activation.
- Phases Exit Through Gates: A phase is done when its exit gate passes, not when its timebox expires; expired timeboxes trigger re-planning, not silent carryover.
- Stale Goals Get a Verdict Weekly: Any Goal with no evidence update in 7 days is reaffirmed, re-scoped, or archived — never left ambiguous.
Evidence required
- Goal specification adhering to
templates/goal-management-spec.mdwith criteria, phases, locks, and evidence links. - Lock record: criteria locked, authorizer, commit, and timestamp.
- Per-criterion evidence: test logs, benchmark summaries, review links as named in the Goal.
- Re-scope entries (if any) with reason, authorizer, and impact analysis.
- Passing execution log from
scripts/verify.sh.
Output contract
- Activated Goal file with measurable criteria, phased plan, owners, and lock record.
- Living evidence ledger: each criterion mapped to current evidence and status.
- Health report: stale flags, blocked phases with blockers named, next actions dated.
- Closure note or re-scope record when the Goal ends or changes.
Stop conditions
- All acceptance criteria satisfied with linked passing evidence and the Goal formally closed.
- Goal re-scoped with recorded authorization and updated phases, owners, and locks.
- Goal archived as obsolete with rationale and superseding reference (if any).
- Token budget exhausted.
- Blocked on external dependency.
Escalation rules
- Escalate to Lead Architect if locked criteria conflict with each other or with architecture invariants discovered mid-flight.
- Escalate to the Goal sponsor if re-scope changes the promised outcome, timeline, or non-goals boundary.
- Escalate immediately if evidence contradicts a claimed satisfied criterion; the criterion reopens until new evidence passes.
04 同仓库更多 Skills
zoom-reflow
暂无简介
wireframe-styleguide
暂无简介
visual-regression
Pixel-by-pixel snapshot testing, Playwright integration, dynamic content masking, deterministic font rendering, and cross-browser CI gates
ui-implementation
Component-driven UI implementation, multi-state matrix (default, hover, focus-visible, active, disabled, loading, empty, error), DTCG design tokens, responsive layout contracts, and accessibility tree mapping.
tui-editor-engine
Text buffer and editing semantics for a terminal code editor — index conversion, transaction-first editing, multi-cursor invariants, undo grouping, and large-file behaviour.
tree-sitter-context-indexing
暂无简介