AGENT SKILL

plan

Use when a spec is ready, even if the work seems obvious; split it into tasks, each with its files, one test command and which tasks block it, then get the plan approved. Do NOT use for writing the spec (use `spec`), a new or vague request (use `grill`) or building an approved task (use `build`).

License 许可
Apache-2.0
最近更新
2026-11-09
Stars
★ 0
Forks
0

01 前言 Front Matter

name
plan
description
Use when a spec is ready, even if the work seems obvious; split it into tasks, each with its files, one test command and which tasks block it, then get the plan approved. Do NOT use for writing the spec (use `spec`), a new or vague request (use `grill`) or building an approved task (use `build`).

02 资源文件 1

03 SKILL.md 正文

Plan

Overview

Turns a spec with no open questions into tasks a fresh session can build test-first, and gets the human's approval recorded by hash. Template: data.content of anneal playbook show plan-template; structure: anneal playbook show plan-schema.

  • You MUST write the plan from the template and run anneal lint plan <file> until it exits 0, applying each finding's fix.
  • You MUST give every task its Files:, one Test: command and its Blocked by: line; anneal lint plan rejects a task without them, a blocker that is not a task, and a cycle.
  • You MUST run anneal plan approve <file> only after the human approves the plan you showed them; it refuses while the spec has any [NEEDS CLARIFICATION] marker.
  • You MUST run anneal plan check <file> before building from a plan; exit 4 means it changed since approval, so it goes back to the human.

When to use

  • A spec passes anneal lint spec with data.needs_clarification at 0, and it has no approved plan yet.
  • Not when the request is new or vague (use grill), nor when the spec is unwritten (use spec), nor when an approved task is next (use build).

Process

  1. Read the spec. Read it whole, and the code its requirements touch. It's working if you can name the files each acceptance criterion changes.
  2. Slice. Cut tracer-bullet tasks: each one a thin path through every layer, ending in a test that passes (references/slice.md). It's working if every task ends green on its own.
  3. Write each task. ### T<n>: <title>, its three lines, then test-first steps: failing test, run it red, code, run it green. It's working if a session with only this task and the spec could build it.
  4. Block sparingly. Add a blocker only where a task needs another's output. It's working if most tasks can run in parallel.
  5. Write the Review focus. Where a reviewer should look hardest, and why. It's working if each item names a file or a task.
  6. Lint. Run anneal lint plan docs/plans/<feature>.md and apply each fix. It's working if it exits 0.
  7. Approve. Show the human the plan; on their explicit yes, run anneal plan approve. It's working if it exits 0.
  8. Keep it current. Any edit voids the approval; on exit 4 from anneal plan check, show the change and approve again. It's working if the check exits 0 when building starts.

Rationalizations

Excuse Reality
"The tasks are obvious from the spec" Then writing them down is quick, and the review sees them.
"One big task is simpler" One big task has no tracer bullet and no early green.
"I'll pick the test command later" A task without a command cannot prove it is done.
"The lead said skip the tests" Keep every Test:; don't offer to drop it.
"Everything depends on everything" Then the slices are horizontal layers. Cut through them.
"A small edit doesn't need re-approval" The hash changed; plan check exits 4. Ask again.

Red flags

  • Approving while the spec still has a [NEEDS CLARIFICATION] marker.
  • A task whose files are "various" or whose test is "run the tests".
  • Editing the plan after approval without running anneal plan check.

Verification

  • anneal lint plan docs/plans/<feature>.md exits 0.
  • anneal plan check docs/plans/<feature>.md exits 0.
  • anneal ledger query --type plan_approved shows the plan's path and its sha256: hash.

04 同仓库更多 Skills

Wet-Ink-Corporation
Wet-Ink-Corporation/anneal

write-skill

Use to write or change a skill test-first, even if the change looks like a wording fix; watch a case fail with no guidance, then pass Tiers 0 to 3 before merge. Do NOT use for turning a correction into a check (use `correct`) or building code (use `build`).

★ 0
Wet-Ink-Corporation
Wet-Ink-Corporation/anneal

verify

Use when asked "is it fixed?", "tested?" or "can we close it?", or to check a claim, and before calling work done or fixed, even if told to skip tests; prove it fresh, failing before the fix and passing after, and doubt it. Do NOT use for an unknown failure (use `diagnose`) or the PR (use `ship`).

★ 0
Wet-Ink-Corporation
Wet-Ink-Corporation/anneal

spec

Use when requirements are agreed, even if the spec seems obvious; write the spec or its acceptance criteria (EARS, SHALL), Out of Scope and the constitution check of its gates. Do NOT use for a new or vague request (use `grill`) or splitting a spec into tasks (use `plan`).

★ 0
Wet-Ink-Corporation
Wet-Ink-Corporation/anneal

ship

Use when a change needs a pull request, review verdict or depth, merge, schema migration, rollout, canary or rollback, even if it looks safe; decide GO or NO-GO only with a rollback ready. Do NOT use for proving work done or passing (use `verify`) or a failure with an unknown cause (use `diagnose`).

★ 0
Wet-Ink-Corporation
Wet-Ink-Corporation/anneal

orchestrate

Use to run an approved plan's ready tickets across subagents, even when fanning out looks obvious; park one-way calls in weigh-in and rule on the rest. Do NOT use for one task (use `build`) or splitting work into tickets (use `plan`).

★ 0
Wet-Ink-Corporation
Wet-Ink-Corporation/anneal

handoff

Use at a phase boundary or when the context monitor warns, even if the context still seems roomy; choose continue, clear, hand off, a subagent or compact, and put what must survive on disk. Do NOT use for proving work done (use `verify`) or splitting work into tasks (use `plan`).

★ 0