AGENT SKILL

release

Ship a finished milestone safely - readiness gate, version and CHANGELOG, commit, push or pull request, deploy, verify and a rollback plan. Use when asked to release, ship, deploy, publish or tag a version.

License 许可
MIT
最近更新
2026-11-10
Stars
★ 3
Forks
0

01 前言 Front Matter

name
release
description
Ship a finished milestone safely - readiness gate, version and CHANGELOG, commit, push or pull request, deploy, verify and a rollback plan. Use when asked to release, ship, deploy, publish or tag a version.

03 SKILL.md 正文

Release

Stop at the first red step and say what is wrong. Pushing, publishing and deploying are seen by other people: before each one, say what it will do and how to undo it, and let the user approve it.

1. Gate

  • The milestone's Done when list is met: check each line against the code or by running it.
  • git status is clean, or every change belongs to this release.
  • Install, tests, typecheck and lint pass locally (the commands in CLAUDE.md).
  • CI is green on the branch: gh run list --branch <branch> --limit 5.

2. Prepare

  • Version: bump it where the project keeps it (package.json, pyproject.toml, Cargo.toml, …) following semver: breaking change = major, feature = minor, fix = patch. Skip if the project does not version.
  • CHANGELOG: add an entry at the top in the project's existing style, written for users: what they can now do, what was fixed, anything they must change.
  • Docs and README still describe what ships; _project/STATUS.md says what was released.

3. Ship

  • Commit with the project's message style (for example chore(release): 1.2.0).
  • Push the branch, or open a pull request with gh pr create when the project merges through pull requests. Never force-push to main or master.
  • Tag the release when the project tags (git tag v1.2.0, push the tag), and create the GitHub release from the CHANGELOG entry (gh release create).
  • Deploy with the project's own command or workflow; do not invent a new deploy path.

4. Verify

  • Watch the workflow run to the end (gh run watch or gh run view).
  • Check the deployed thing answers: open the URL, run the installed command, or read the package page. Report the links.

5. Rollback plan

Write down, before or right after shipping: the last good version or commit, the command to roll back (revert and redeploy, or redeploy the previous tag), and how to check it worked. If the project has no docs/runbook.md, offer to write one with deploy, rollback and health checks.

04 同仓库更多 Skills

syedmehedihussain
syedmehedihussain/cherry

verification-loop

Run a six-phase verification of a Claude Code session's work — build, type check, lint, tests with coverage, security grep, and diff review — then produce a PASS/FAIL verification report. Use when verifying work after completing a feature or refactor, before creating a PR, or when quality gates must pass.

★ 3
syedmehedihussain
syedmehedihussain/cherry

e2e-testing

Playwright E2E testing patterns, Page Object Model, configuration, CI/CD integration, artifact management, and flaky test strategies. Use when writing Playwright tests, structuring page objects, or fixing flaky E2E runs in CI.

★ 3
syedmehedihussain
syedmehedihussain/cherry

browser-qa

Run automated post-deploy UI verification with a browser automation MCP (claude-in-chrome, Playwright, or Puppeteer): console-error and Core Web Vitals smoke checks, form and auth-flow interaction tests, screenshot visual regression across three breakpoints, and axe-core accessibility audits ending in a SHIP / DO-NOT-SHIP verdict. Use when testing a deployed feature on staging or preview, before shipping frontend changes, reviewing a frontend PR, or checking responsive layout and accessibility.

★ 3
syedmehedihussain
syedmehedihussain/cherry

ai-regression-testing

Regression testing strategies for AI-assisted development. Sandbox-mode API testing without database dependencies, automated bug-check workflows, and patterns to catch AI blind spots where the same model writes and reviews code. Use when adding regression coverage to AI-assisted code, or when the same model both wrote and reviewed a change.

★ 3
syedmehedihussain
syedmehedihussain/cherry

story-lifecycle

Manage a file-based epic → story → sprint development loop without requiring an external project management tool. Creates and tracks epics, breaks them into user stories, assigns them to sprints, and drives implementation story by story. Use when starting a new feature initiative or when the team has no Jira/Linear/Taiga but needs structured delivery tracking.

★ 3
syedmehedihussain
syedmehedihussain/cherry

intent-driven-development

Turn ambiguous or high-impact product and engineering changes into scoped, verifiable acceptance criteria before or alongside implementation. Use when a user asks to clarify a feature, define acceptance criteria, de-risk a security/data/migration/integration change, prepare implementation requirements for another agent, or make a complex request testable. Do not trigger for trivial edits, straightforward fixes, active debugging, code review, or implementation requests whose acceptance conditions are already clear unless the user explicitly invokes this skill.

★ 3