weekly-review
Use when the user asks for the weekly review of their Godot game, or when the scheduled Friday review starts.
- License 许可
- Apache-2.0
- 最近更新
- 2026-11-13
- Stars
- ★ 1
- Forks
- 0
01 前言 Front Matter
- name
- weekly-review
- description
- Use when the user asks for the weekly review of their Godot game, or when the scheduled Friday review starts.
03 SKILL.md 正文
Weekly review
A short, written look back at the week and forward at the next one. Read the facts; do not change code.
1. Facts
pwsh ${CLAUDE_PLUGIN_ROOT}/ci/godot/hyperdot.ps1 status -Json(features, plan, runs, git, warnings).git log --since=7.days --stat --format='%cs %s'for what changed..godot/hyperdot-history.jsonl: this week's runs; failure codes that recur.- The previous
plan/STATUS.mdand the last file inplan/reviews/, to see what moved since then. bench-results/bench.csv, if present: compare this week's rows with earlier ones under the same label.docs/kit-notes.md: the lines added this week, and older ones with no pull request link yet.
2. Write plan/reviews/<yyyy-mm-dd>.md
- Done this week: features whose mark improved (with evidence), tasks moved to done.
- Health: test runs this week (passed/failed), recurring failures, frame-pacing changes.
- Phase: current phase, open gates, weeks used against its timebox.
- Outside eyes: who outside the project played a build this week, and what they hit. None for two weeks is a risk. From their notes: where they wanted to do something the game did not allow, and which choices nobody picked.
- Pace: hours worked against
weeklyHours, and complaints that keep coming back; a tired developer stops acting on feedback (TumbleSeed postmortem). Ask whether the user still wants to play the current build: work they no longer care about wears out the one person the game depends on. - Risks: at most three, each with one concrete mitigation.
- Kit changes: from
docs/kit-notes.md, at most three proposed changes to Hyperdot, each with the notes behind it and the smallest place it fits (adoctorcheck, a line in a skill, a script fix), asretrostep 3 sorts them. A note that came back three times or more goes first. - Next week: three to five proposed tasks, must-have features and phase gates first, within the user's weekly hours
(
weeklyHoursinplan/plan.json) and the work-in-progress limit.
3. Agree next week
One multiple-choice question (multi-select) with the proposed tasks. Add the chosen ones with
plan -Do add -Title ... -Feature F<n> -Column todo and sync them to the GitHub Project (plan -Do sync) the way game step 5 describes.
Then one multiple-choice question per proposed kit change: "Open a kit PR", "Later", "Drop it". The owner approves
every kit change: when this review runs as the scheduled Friday task, nobody is there to answer, so write the proposals
under Kit changes in the review file and stop; the owner answers when reading it, and /retro opens the approved
pull requests the way its step 5 describes. Never open one unapproved.
If the week produced a lesson worth keeping, suggest running /retro.
04 同仓库更多 Skills
over-budget
Use when a fixture exceeds the size budget.
bad-yaml
暂无简介
bad-workflow-description
Use when testing; runs the kit and then reads the JSON.
bad-version
Use when a fixture quotes a stale package version.
bad-value
Use when a fixture passes a value outside a parameter's set.
bad-trigger
Helps with Godot tests.