Use when the user asks Pi to complete, finalize, finish, or run complete-feature for a HEPHA FEAT from a registered project workspace after required review and verification are accepted, for example "use the complete-feature skill for FEAT-002".
- License 许可
- MIT
- 最近更新
- 2026-10-31
- Stars
- ★ 0
- Forks
- 0
01 前言 Front Matter
- name
- complete-feature
- description
- Use when the user asks Pi to complete, finalize, finish, or run complete-feature for a HEPHA FEAT from a registered project workspace after required review and verification are accepted, for example "use the complete-feature skill for FEAT-002".
- agent_action
- complete-feature
02 资源文件 1
03 SKILL.md 正文
Complete Feature
Model Authority
This procedure is model-neutral. When invoked directly, execution is
direct_host and remains in the current Pi, Codex, or Claude Code session; that
active host owns model selection. Do not query Hepha routing policy, request a
model switch, automatically hand off, choose a fallback model, or fabricate
route-policy evidence. Direct execution does not fabricate an orchestrated
receipt. Only an explicit Hepha launcher or dashboard dispatch creates a
separate orchestrated worker, whose route is injected outside this skill.
You are executing the HEPHA complete-feature workflow directly from Pi.
This skill is for console-driven finalization. It must work when Pi is opened
from a registered project or parent workspace and the user names the active
project plus a FEAT id such as FEAT-002.
Invocation Contract
Treat the user's request to use this skill as explicit human acceptance that:
- code review has been performed or accepted;
- manual tests have been run or accepted;
- the final HEPHA human gates may be closed by this run.
Do not ask for another code-review or manual-test confirmation. Still verify that phase files, review artifacts, and findings do not contradict that acceptance. Stop with a blocker if a numbered phase is unresolved, a blocking finding is still open, validation markers remain, tests fail, git cannot merge safely, or the requested FEAT is already cancelled.
Required Inputs
Accept these from the user's message:
- project name or alias, such as
HEPHA,Hepha, orAgenticDevelopmentProcess; - FEAT id, such as
FEAT-002; - optional MemoryBank path override.
If the FEAT id is missing, ask one concise question. Otherwise, infer safely.
Workspace And Project Resolution
- Treat the current directory as the workspace starting point.
- Resolve the active project named by the user and locate its repository root.
- Read the project
AGENTS.mdand project brief or MemoryBank overview when present before editing. - Resolve the active project:
HEPHA,Hepha, andAgenticDevelopmentProcessmap to<workspace root>/AgenticDevelopmentProcess.- If the user names another project, use
docs/projects.mdor the nearest child repo folder matching that name.
- Read the child project
AGENTS.mdandREADME.mdwhen present. - Run project git, build, test, and edit commands from the child project root, not from the parent workspace.
MemoryBank And FEAT Resolution
Resolve the MemoryBank in this order:
- User-supplied MemoryBank path, if present.
.hepha/projects.jsonin the child project, matching projectname,id, or child root path.<child project root>/MemoryBankwhen it containsFeatures/.- A direct search under the child root for
MemoryBank/Features.
Then resolve the FEAT:
- Normalize the requested FEAT id to uppercase, for example
FEAT-002. - Search
MemoryBank/Features/03_IN_PROGRESSfirst. - If the FEAT is not present on the current branch, inspect local git branches
for a branch containing
Features/03_IN_PROGRESS/<FEAT folder>, then switch only after confirming the worktree is clean or unrelated changes are safe. - Continue only when the FEAT folder is in
03_IN_PROGRESS. - Require
FeatureDescription.md,FeatureTasks.md, and numberedPhases/phase-N-*.mdfiles. - Stop if the FEAT contains
[NEEDS VALIDATION], and report exact file and line references.
Completion Gate
Before finalizing, verify:
- every numbered phase file is
COMPLETEDorSKIPPED; FeatureTasks.mdphase ledger agrees with phase files;- user code review and manual tests are recorded or are accepted by this invocation contract;
- blocking code-review findings are resolved or explicitly accepted by the user;
- human review findings are closed, accepted, or absent;
- every applicable linked EPIC
EpicAcceptanceTests.mdscenario has exact Gherkin/Playwright, integration-test, static-check, or documented existing-coverage evidence in the FEAT'sEPIC Acceptance Traceability; - linked EPIC acceptance criteria have exact test/check/documentation evidence;
- linked EPIC child FEAT states can be resolved from the current MemoryBank;
MemoryBank/LessonsLearnedactive rules have been read and applied.- every numbered phase has
## Quality Gate Evidencefor changed files, tests, Gherkin/Playwright E2E, and code review decisions; - no phase quality gate is still
missing; - every test, E2E, or code-review waiver has an explicit justification tied to the phase scope.
If any check fails, fix recoverable documentation or code issues, then rerun the smallest relevant verification. Escalate only when the remaining issue requires human judgment, credentials, unsafe destructive action, or an unresolved merge conflict.
Missing phase quality gates are completion blockers. Do not treat the user's invocation acceptance as permission to ignore absent evidence; it only confirms that human review/manual-test gates may be closed when the phase evidence does not contradict that acceptance.
Accept not applicable or waived gates when the phase file names the reason:
planning-only, health-check-only, documentation-only, test-only, no browser
behavior, or comment-only production changes with no executable behavior
change. Do not accept generic waivers such as "not needed" without scope and
file-specific rationale.
Finalization Steps
Execute these steps in order:
- Inspect
git status --short --branchfrom the project root. - Read the FEAT folder, linked EPIC documents, code reviews, completion notes,
and relevant
MemoryBank/LessonsLearneddocuments. - Run final relevant checks one at a time:
- apply the
serialized-build-commandsskill when available; - prefer the project's documented typecheck/lint/test commands;
- record exact commands and outcomes.
- apply the
- Create or update
<FEAT folder>/completion-report.md. - Create or update
MemoryBank/LessonsLearned/<feat-id-lower>-lessons-learned.md. - Commit all completed FEAT work on the implementation branch.
- Push the implementation branch to its configured remote.
- Merge the implementation branch into
master; usemainonly whenmastertruly does not exist. - Move the FEAT folder from
Features/03_IN_PROGRESStoFeatures/04_COMPLETED, preserving the folder name and files. - Update the completed FEAT source status to
Completedwhen the source document has a stale status such asReady To Develop,In Progress, orAwaiting Acceptance. - Re-evaluate every linked EPIC:
- collect child FEAT ids from the EPIC document and from FEAT documents that declare the EPIC as their parent;
- resolve each child FEAT by folder state under the same MemoryBank;
- if every child FEAT is in
Features/04_COMPLETED, mark the EPIC state asCompletedand update its progress tables/summary; - otherwise update progress counts honestly and leave the EPIC
InProgress; - do not mark an EPIC complete when any child FEAT is missing, cancelled, submitted, ready, or in progress.
- Commit the MemoryBank folder move, completed FEAT status update, linked
EPIC progress update, and LessonsLearned changes on
master. - Push
master. - If the implementation branch used a separate git worktree, clean it up only
after the branch has been merged and pushed:
- record
git worktree list --porcelainbefore checkout/merge when a worktree may be involved; - never remove the current project root worktree;
- verify the implementation worktree is clean or contains only already merged artifacts;
- run
git worktree remove <worktree-path>and thengit worktree prune; - if removal is unsafe, report the retained path and exact reason.
- record
- If
.hepha/hepha.sqliteexists, sync the HEPHA metadata only after the folder move commit succeeds. Use the bundled helper when available:
node pi-packages/pi-skill-hepha-continue-implementation/skills/complete-feature/scripts/sync-completion-state.mjs \
--project-root <project-root> \
--memory-bank <memory-bank-path> \
--feat-id <FEAT-ID> \
--feat-folder <FEAT-folder-name> \
--summary "Completed <FEAT-ID> through direct Pi complete-feature skill."
If the SQLite helper is unavailable or node:sqlite is unsupported, report that
metadata sync was skipped; do not undo filesystem or git completion.
Branch And Watcher Safety
- Direct Pi execution is not hosted by the HEPHA orchestrator, so repository file changes cannot kill this Pi run.
- If a local HEPHA dev server or
tsx watchprocess is running in the same worktree, expect it may restart when branch checkout or source edits happen. This is acceptable for direct console finalization, but do not rely on the dashboard run state as the source of truth. - Do not run local dev servers or watch commands.
- Do not revert unrelated user changes.
- Do not hide merge conflicts, failed pushes, failed tests, or dirty unrelated work.
- Do not leave a feature worktree behind after successful completion unless it is dirty, current, or otherwise unsafe to remove; report retained worktrees explicitly.
Output Contract
Return a concise Markdown report with:
- project root and MemoryBank path used;
- FEAT id and source/completed folders;
- final checks run;
- files/docs updated;
- commits, pushes, and branch merges performed;
- linked EPIC state/progress updates performed;
- worktree cleanup performed or skipped with reason;
- SQLite metadata sync status;
- blockers, if any;
- exact result line:
Complete Feature Result: COMPLETEDorComplete Feature Result: BLOCKED.
04 同仓库更多 Skills
serialized-build-commands
Agents should invoke this skill before running build, test, lint, or format commands that use shared caches, file locks, build directories, or package manager state. Use especially before Rust Cargo commands such as cargo check, cargo test, cargo clippy, cargo fmt, cargo build, or any shell command containing cargo.
submit-epic
Use when the user asks Pi to submit, create, or draft a new HEPHA EPIC directly from a registered project workspace, preserving the useful legacy DevCycle MCP submit-epic command, for example "submit-epic for HEPHA build observability projection hooks" or "create a HEPHA EPIC titled Runtime Approval Gates".
start-feature
Use when the user asks Pi to start a HEPHA FEAT implementation, run start-feature, or run start-implementing for a READY FEAT from a registered project workspace, for example "use the start-feature skill for FEAT-003".
refine-feature
Use when the user asks Pi to run refine-feature, refine a HEPHA FEAT, create FeatureTasks and phase files, or move a clarified FEAT to Ready To Develop, for example "refine-feature FEAT-004" or "Use the refine-feature skill for HEPHA FEAT-004".
design-feature
Use when the user asks Pi to run design-feature, design a HEPHA FEAT, create UI requirements, or prepare UX/design artifacts for a FEAT, for example "design-feature FEAT-004" or "Use the design-feature skill for HEPHA FEAT-004".
deep-dive
Use when the user asks Pi to run a HEPHA Deep-Dive for an EPIC or FEAT, gather Deep-Dive questions, or apply saved Deep-Dive answers to a MemoryBank document, for example "use the deep-dive skill for HEPHA FEAT-004".