Turn an established plan into independently verifiable vertical implementation slices with acceptance criteria, verification, and true dependencies. Use when breaking planned work into tickets; small changes can stay as one task.
- License 许可
- MIT
- 最近更新
- 2026-11-14
- Stars
- ★ 0
- Forks
- 0
01 前言 Front Matter
- name
- to-tickets
- description
- Turn an established plan into independently verifiable vertical implementation slices with acceptance criteria, verification, and true dependencies. Use when breaking planned work into tickets; small changes can stay as one task.
02 资源文件 1
- 许可证LICENSE1.0 KB
03 SKILL.md 正文
Turn a Plan into Tickets
Convert an established plan into the smallest useful set of implementation slices. Each slice should deliver a narrow, complete behavior that can be demonstrated and verified through the relevant layers. Avoid separate database, backend, and UI tickets when none would establish a useful outcome on its own. Infrastructure or internal changes can deliver an observable operational or developer outcome. If one focused task suffices, keep it as one; do not manufacture a backlog.
Reuse the plan
Read the relevant plan, repository guidance, affected code, and verification
commands within current permissions. Reuse accepted scope, decisions, and
constraints rather than reopening them. Use the existing task record and
project-context workflow when available; avoid parallel records or separate
debt ledgers. thorough-plan develops an approach; this skill decomposes an
established approach. If the plan lacks a consequential decision, identify the
specific gap and continue slicing unaffected work. Ask only when the answer
materially changes the slices; label assumptions and proposals as such.
Choose slices and dependencies
Start with the smallest complete path that proves the approach, then extend behavior in useful increments. Include integration, error handling, and relevant tests in each slice rather than postponing them to a final integration ticket. Keep the project working between slices. Scope slices for reviewable outcomes, not a fixed duration, file count, or number of tickets.
Record a dependency only when another slice must supply a concrete capability, interface, data state, or decision before this slice can complete. Name that prerequisite and explain why. Distinguish a preferred order from a true blocker; mark independent slices explicitly. Break dependency cycles by narrowing scope or agreeing on a stable interface. Do not claim independence when verification still requires unfinished work. For unresolved external blockers, name the missing input, affected slices, and what would unblock them without inventing an owner or deadline.
Where persisted data or compatibility warrants staged change, consider expand–migrate–contract:
- Expand: add compatible interfaces or storage while existing consumers work.
- Migrate: move consumers or backfill data in verifiable increments; include coexistence, failure recovery, and data preservation checks as relevant.
- Contract: remove old paths only after evidence shows migration is complete and the agreed compatibility window has ended.
Make those prerequisites explicit. Use a simpler direct change when it meets the project's compatibility and data requirements; this pattern is not a required architecture.
Present actionable tickets
Default to the conversation. For each slice, provide a concise title and:
- Outcome: the observable behavior or capability and its link to the plan's requirement or goal.
- Scope: included work, relevant components, and boundaries needed to prevent overlap or unplanned expansion.
- Acceptance criteria: observable success and relevant failure, compatibility, or data preservation behavior; avoid vague criteria such as “works correctly.”
- Verification: specific existing checks, proportionate new tests, or manual observations that would establish the criteria. Label planned checks as planned; a drafted ticket is not completion evidence.
- Dependencies/blockers: prerequisite slice IDs and reasons, unresolved inputs, or “None.” Distinguish completion dependencies from work that can start now.
Use stable IDs when useful for cross-references. Keep enough context in each ticket for implementation without reconstructing the whole conversation; link the source plan and accepted decisions instead of duplicating them. Finish by checking that in-scope requirements are covered, every ticket has an independently verifiable outcome, dependencies are justified, and no unrelated work has slipped in.
Writing files or updating a tracker requires authorization for that destination; reuse authorization already given. Ticket decomposition alone does not authorize setup, external ticket creation, publication, implementation, or delegated execution. When saving is authorized, update the existing task record rather than creating a second ledger. Report what was actually saved or created and any remaining gaps.
Source
Adapted from selected ideas in Matt Pocock's to-tickets skill: vertical slices, explicit blockers, and expand–migrate–contract. The upstream MIT notice is retained in LICENSE.
04 同仓库更多 Skills
writing-for-agents
Author or revise agent instruction artifacts such as AGENTS.md, skill instructions, and agent prompts. Use for their triggers, structure, constraints, and completion criteria, not ordinary coding answers or general prose editing.
why
Investigate why a design or architectural choice was made, using code history and decision records. Use for rationale questions like why X was built this way or chosen over Y, not how code works today (use teach), debugging failures, or Five Whys process analysis.
unslop
Edit prose to remove AI writing patterns such as stock vocabulary, filler, hedging, and mannered phrasing. Use when asked to unslop or de-AI text, or to polish a substantial prose draft; not for code, short routine replies, or deciding the content and structure of documentation or agent instructions.
technical-writing
Write or revise technical documentation, tutorials, how-to guides, reference material, and explanations so readers can understand and complete their task.
teach
Explain what a concept means or how code works today, from the current code and docs. Use for how-it-works questions, including why code behaves as it does, not why a design was chosen or introduced (use why) or diagnosing failures.
takeover
Finish someone else's pull request, branch, or agent thread while preserving the original contributors' credit. Use when the user asks to take over existing work or requests a takeover.