spec-first
Requires an approved written specification before any test or implementation work starts.
- License 许可
- MIT
- 最近更新
- 2026-10-13
- Stars
- ★ 0
- Forks
- 1
01 前言 Front Matter
- name
- spec-first
- license
- MIT
- description
- Requires an approved written specification before any test or implementation work starts.
02 资源文件 1
- 参考文档leanrigor.yaml137 B
03 SKILL.md 正文
Write the spec first.
04 同仓库更多 Skills
verification
Use before claiming that work is complete, fixed, passing or done — including before committing, opening a pull request or reporting a result. Requires running the checks and quoting their real output instead of asserting success.
senior-system-design
Use when designing or reviewing a system, service, migration or cross-component feature — anything where load, failure, data shape, security boundaries or rollout matter. Produces a design with explicit non-functional requirements, capacity assumptions, failure modes, security boundaries, observability and a rollout plan.
product-brainstorming
Use before building a feature, product or component when the problem, users or scope are not yet settled — including requests phrased as "build X", "add X" or "we need X" that have not stated who it is for or what breaks without it. Produces a scoped brief, not an implementation.
verification
Collect evidence before claiming that work is complete. Use when a task is about to be reported as done, fixed or passing.
undeclared-network
A skill shipping a script that reaches the network without declaring the capability.
senior-system-design
Produce a system design with explicit non-functional requirements, capacity assumptions, failure modes, security boundaries, observability and rollout.