AGENT SKILL

semi-reference

Use when correcting a semiconductor misconception, looking up a node, wafer, yield, defect-density, mask or cost figure, finding the sources, or needing a quick-reference picker — plus the current state of High-NA lithography adoption and advanced packaging as the binding constraint. Companion to the other semiconductor skills.

License 许可
MIT
最近更新
2026-11-15
Stars
★ 5
Forks
3

01 前言 Front Matter

name
semi-reference
description
Use when correcting a semiconductor misconception, looking up a node, wafer, yield, defect-density, mask or cost figure, finding the sources, or needing a quick-reference picker — plus the current state of High-NA lithography adoption and advanced packaging as the binding constraint. Companion to the other semiconductor skills.

03 SKILL.md 正文

Semiconductors and Chip Manufacturing: What's Live, Misconceptions, Numbers, and Sources

Part 6 of 6 of the Semiconductors and Chip Manufacturing reference (plugin semiconductors-and-chip-manufacturing), covering §27–§32. Sibling skills: semi-carriers-doping-junctions-mosfet-and-scaling (§0–§5), semi-transistor-architectures-interconnect-memory-and-wafers (§6–§9), semi-cleanroom-lithography-deposition-etch-and-cmp (§10–§15), semi-integration-yield-metrology-test-and-packaging (§16–§20), semi-pcb-assembly-reliability-design-flow-and-economics (§21–§26). Section numbers are shared across the set; a reference written as §N → skill points into that sibling skill.

Currency: The physics is settled. Two frontiers are moving. See §27 for High-NA lithography adoption, and advanced packaging as the binding constraint.

⚠️ The most complex manufacturing humans do, by a wide margin. ⚠️ A leading-edge chip involves on the order of a thousand process steps, features smaller than a virus, tolerances measured in atoms, and a supply chain with genuine single points of failure.

Builds directly on an electromagnetism reference (band theory, pn junctions, MOSFET physics, wide-bandgap materials). Complements a manufacturing reference (tolerancing and yield), an organic-chemistry reference (photoresists and packaging polymers), and a resource-extraction reference (where the materials come from).

⚠️ GOTCHA boxes mark where marketing and physics diverge — and this industry has more of that gap than most.

The three ideas that organize this document:

  1. ⚠️ "NODE NAMES ARE MARKETING" (§5 → semi-carriers-doping-junctions-mosfet-and-scaling). "3nm" does not describe any physical dimension on the chip. It has been a marketing label for roughly a decade, and comparing nodes across foundries by name is meaningless.
  2. ⚠️ YIELD IS THE WHOLE BUSINESS (§17 → semi-integration-yield-metrology-test-and-packaging). Everything — die size, chiplet architecture, defect control, cleanroom spend — is downstream of the fact that profitability is set by what fraction of die work.
  3. ⚠️ THE BOTTLENECK MOVED TO THE BACK END (§20 → semi-integration-yield-metrology-test-and-packaging, §27.2). For AI accelerators the binding constraint is no longer transistors — it is packaging and memory, which is a genuine reversal of thirty years of industry structure.

§27. What's Live — checked August 2026

27.1 ⚠️ High-NA EUV: in production, and the leaders disagree about it

⚠️ §11 → semi-cleanroom-lithography-deposition-etch-and-cmp's frontier, and it has just crossed from R&D into manufacturing — with a genuine split between foundries about whether it is worth the money.

  • ⚠️ THE TOOL. ⚠️ ASML's TWINSCAN EXE:5200B, with 0.55 NA anamorphic optics from Zeiss, at a reported cost of roughly $360–400 million per machine. ⚠️ Intel reported the EXE:5200B at 175 wafers per hour with 0.7 nm overlay. ⚠️ Standard 0.33-NA EUV tops out around 13 nm half-pitch in a single exposure; High-NA reportedly enables features up to 66% smaller.
  • ⚠️ IT IS NOW IN VOLUME PRODUCTION. ⚠️ Intel installed the industry's first commercial High-NA tool in December 2025, and on 15 July 2026 ASML confirmed High-NA EUV had reached high-volume manufacturing — used to pattern specific layers of Intel Core Ultra Series 3 (Panther Lake) processors built on Intel 18A.
  • ⚠️ Note the nuance that coverage sometimes loses: 18A was DESIGNED around Low-NA EUV and multi-patterning and does not depend on High-NA to ship. ⚠️ 18A is the commercial validation; Intel's 14A is the node where High-NA becomes foundational.
  • ⚠️ Samsung and SK hynix are also adopting — ⚠️ Samsung reportedly received its first EXE:5200B in late 2025 with a second in H1 2026 for advanced foundry lines, and SK hynix is reported as the first memory maker to install a commercial system.

⚠️ GOTCHA — TSMC, the largest foundry, is deliberately SITTING OUT, and its reasoning is economically serious rather than conservative. ⚠️ TSMC has said High-NA remains too expensive at this stage and plans to continue using current EUV systems for the next several chip generations — with A13 and A12, targeted for 2029, reportedly not requiring High-NA. ⚠️ The underlying argument: existing Low-NA tools can match High-NA's resolution using DOUBLE PATTERNING, and one analysis estimates that approach may still cost LESS than High-NA single patterning. ⚠️ Against that, each extra patterning step reportedly adds a mask set, alignment error budget, two more etch steps and roughly 30% to wafer cost — and by the 2nm node the most aggressive layers were already triple- and quadruple-patterned. ⚠️ So this is a genuine open question about where the crossover sits, not a case of one party being wrong. ⚠️ ASML's own CEO frames adoption as gradual, with high-volume manufacturing expected across 2027–28.

⚠️ Hyper-NA is reported as ASML's next step, some time in the next decade. ⚠️ Sourcing note: ASML and Intel are interested parties on one side and TSMC on the other; I've taken the production milestone from ASML's own press release and the cost-benefit dispute from trade reporting on both companies' statements.

27.2 ⚠️ The bottleneck moved to packaging and memory

⚠️ §20 → semi-integration-yield-metrology-test-and-packaging's subject becoming the industry's binding constraint — and this is a genuine reversal of decades of structure.

  • ⚠️ THE CLARIFYING NUMBER. ⚠️ Epoch AI estimates the four largest AI chip designers collectively consumed around 90% of global CoWoS capacity and HBM supply in 2025 — while consuming only about 12% of advanced LOGIC DIE production. ⚠️ That single comparison tells you where the constraint is: not transistors.
  • ⚠️ WHY. ⚠️ An AI accelerator cannot be a single monolithic die — reticle limits (§17 → semi-integration-yield-metrology-test-and-packaging) and yield force chiplets, and the compute die must sit adjacent to multiple HBM stacks on an interposer. ⚠️ So every accelerator needs a front-end wafer AND a CoWoS slot AND an HBM allocation, and no single intervention resolves it.
  • ⚠️ CAPACITY IS SCALING FAST AND STILL SHORT. ⚠️ Reported figures vary by source and by what they count, but the direction is consistent: TSMC CoWoS capacity has roughly tripled since 2023, with 2026 in-house targets reported variously around 120,000–140,000 wafers per month, plus OSAT spillover. ⚠️ TrendForce is cited estimating the supply-demand gap narrowing from around 20% to around 10% by end-2026. ⚠️ CoWoS is reported fully booked, with NVIDIA holding roughly 60% of allocation.
  • ⚠️ HBM IS THE CO-EQUAL CONSTRAINT. ⚠️ HBM3E reportedly effectively sold out for 2026; HBM4 ramping into late 2026. ⚠️ A structural problem underneath: HBM4 is reported to need roughly 3× the wafer area of standard DRAM for the same capacity, so reallocating fabs toward HBM tightens conventional DRAM — which is why memory prices for ordinary PCs rose. ⚠️ HBM is reported at around 25% of DRAM industry revenue on under 5% of bit volume.

⚠️ GOTCHA — capacity announcements are a LAGGING indicator, because capacity that cannot pass customer qualification does not ship. ⚠️ Reporting on Samsung's 12-layer HBM3E stacking yield difficulties makes the point: stacking more dies compresses bonding alignment tolerance and TSV integrity margins, so an announced capacity increase is only meaningful once yield is proven. ⚠️ This is §17 → semi-integration-yield-metrology-test-and-packaging's yield lesson reappearing at the package level — and it is why HYBRID BONDING (§20 → semi-integration-yield-metrology-test-and-packaging) is described as becoming essential rather than optional.

⚠️ Where this is heading: ⚠️ reporting points to CoWoS generations supporting eight HBM4 stacks with dual compute chiplets, 16-high stacks raising yield and thermal risk, and CO-PACKAGED OPTICS moving into high-performance systems as power savings in AI networking become compelling. ⚠️ One analysis notes memory and packaging together now represent 60–70% of AI accelerator cost of goods — logic silicon is no longer the dominant cost, which is the whole story in one line. ⚠️ Sourcing caution: capacity and share figures here come from market-intelligence firms and supply-chain consultancies and DISAGREE with each other on specifics — I've reported ranges and marked them. ⚠️ The Epoch AI 90%/12% comparison is the most useful and best-sourced single datum, and it is an estimate.


§28. Misconceptions

Misconception Correction
"3nm" is a physical dimension ⚠️ A marketing name since ~22nm. Compare density instead (§5 → semi-carriers-doping-junctions-mosfet-and-scaling)
Moore's Law is a law of physics ⚠️ An economic observation about cost per transistor (§5 → semi-carriers-doping-junctions-mosfet-and-scaling)
Moore's Law ended ⚠️ Density still rises; DENNARD scaling ended, and cost/transistor stalled (§5 → semi-carriers-doping-junctions-mosfet-and-scaling)
Multicore happened because parallel is better ⚠️ Frequency scaling stopped. It was forced (§5 → semi-carriers-doping-junctions-mosfet-and-scaling)
Voltage can keep scaling down ⚠️ 60 mV/decade subthreshold floor blocks it (§4 → semi-carriers-doping-junctions-mosfet-and-scaling, §5 → semi-carriers-doping-junctions-mosfet-and-scaling)
Transistors are the speed limit ⚠️ Interconnect RC dominates at the leading edge (§7 → semi-transistor-architectures-interconnect-memory-and-wafers)
SRAM shrinks with logic ⚠️ It has scaled poorly, which drives chiplet partitioning (§8 → semi-transistor-architectures-interconnect-memory-and-wafers)
EUV is just a shorter wavelength ⚠️ Everything absorbs it — vacuum, all-reflective optics, tin plasma (§11 → semi-cleanroom-lithography-deposition-etch-and-cmp)
Bigger chips are better ⚠️ Yield falls exponentially with area (§17 → semi-integration-yield-metrology-test-and-packaging)
Chiplets are about modularity ⚠️ Primarily yield and the reticle limit (§17 → semi-integration-yield-metrology-test-and-packaging, §20 → semi-integration-yield-metrology-test-and-packaging)
Chiplets are strictly cheaper ⚠️ Known-good-die testing adds 15–30% test cost (§19 → semi-integration-yield-metrology-test-and-packaging)
Packaging is an afterthought ⚠️ It's the binding constraint for AI silicon (§20 → semi-integration-yield-metrology-test-and-packaging, §27.2)
A fab's cost is the building ⚠️ Tools. One EUV scanner is hundreds of millions (§25 → semi-pcb-assembly-reliability-design-flow-and-economics, §27.1)
Chips are made where they're designed ⚠️ Fabless/foundry split; leading edge is concentrated (§25 → semi-pcb-assembly-reliability-design-flow-and-economics, §26 → semi-pcb-assembly-reliability-design-flow-and-economics)
The leading edge is most of the industry ⚠️ Most chips by unit come from mature nodes (§25 → semi-pcb-assembly-reliability-design-flow-and-economics)
Copper is etched like aluminium ⚠️ It isn't — hence damascene and CMP (§13 → semi-cleanroom-lithography-deposition-etch-and-cmp, §15 → semi-cleanroom-lithography-deposition-etch-and-cmp)
Annealing is straightforward heating ⚠️ Thermal budget: heat activates AND diffuses (§14 → semi-cleanroom-lithography-deposition-etch-and-cmp)
Dummy metal fill is wasted area ⚠️ CMP density rules require it (§15 → semi-cleanroom-lithography-deposition-etch-and-cmp)
A chip either works or doesn't ⚠️ Binning monetizes partial failures (§17 → semi-integration-yield-metrology-test-and-packaging)
Overclocking only risks crashes ⚠️ It consumes rated lifetime — TDDB, electromigration (§23 → semi-pcb-assembly-reliability-design-flow-and-economics)
Memory bit flips are defects ⚠️ Cosmic rays and alphas. Hence ECC (§23 → semi-pcb-assembly-reliability-design-flow-and-economics)
FR-4 is fine for any board ⚠️ Its loss tangent destroys multi-GHz signals (§21 → semi-pcb-assembly-reliability-design-flow-and-economics)
Lead-free solder was a pure improvement ⚠️ Higher melting, narrower window, tin whiskers (§22 → semi-pcb-assembly-reliability-design-flow-and-economics)
High-NA EUV is obviously the next step ⚠️ TSMC is sitting it out on cost grounds (§27.1)
AI chips are limited by logic wafers ⚠️ ~90% of CoWoS and HBM vs ~12% of logic dies (§27.2)
Announced HBM capacity means supply ⚠️ Capacity that fails qualification doesn't ship (§27.2)

§29. Numbers

⚠️ Subthreshold swing floor  ⚠️ ~60 mV/decade at room temperature
⚠️ Silicon bandgap  ~1.1 eV · ⚠️ EG silicon purity ~11 nines
⚠️ Wafer  300 mm standard · ⚠️ 450 mm abandoned
⚠️ Yield  ⚠️ Y ≈ e^(−AD) — falls EXPONENTIALLY with die area
⚠️ EUV wavelength  13.5 nm · ⚠️ Low-NA 0.33 · High-NA 0.55
⚠️ Low-NA single-exposure limit  ⚠️ ~13 nm half-pitch
⚠️ High-NA tool  ⚠️ ~$360–400m · EXE:5200B 175 wph, 0.7 nm overlay
⚠️ Extra patterning step  ⚠️ reportedly ~+30% wafer cost
⚠️ High-NA in HVM  ⚠️ 15 July 2026 (Intel 18A / Panther Lake)
⚠️ AI designers' share  ⚠️ ~90% of CoWoS and HBM · ~12% of logic dies
⚠️ TSMC CoWoS  ⚠️ ~3× since 2023; 2026 targets ~120–140k wpm (reported)
⚠️ CoWoS gap  ⚠️ ~20% → ~10% by end-2026 (TrendForce, reported)
⚠️ HBM4 wafer area  ⚠️ ~3× standard DRAM for same capacity (reported)
⚠️ HBM share of DRAM revenue  ⚠️ ~25% on <5% of bits (reported)
⚠️ Memory + packaging  ⚠️ ~60–70% of AI accelerator COGS (reported)
⚠️ Chiplet test premium  ⚠️ ~15–30% over monolithic (reported)

§30. Sources

Source Why
Sze & Ng, Physics of Semiconductor Devices ⚠️ The device physics standard
Streetman & Banerjee, Solid State Electronic Devices More accessible entry
Plummer, Deal & Griffin, Silicon VLSI Technology ⚠️ Process integration
May & Spanos, Fundamentals of Semiconductor Manufacturing ⚠️ §16–§18 → semi-integration-yield-metrology-test-and-packaging, yield and control
Weste & Harris, CMOS VLSI Design ⚠️ §24 → semi-pcb-assembly-reliability-design-flow-and-economics, the design side
Lau, Semiconductor Advanced Packaging ⚠️ §20 → semi-integration-yield-metrology-test-and-packaging
IPC standards (2221, 6012, A-610) ⚠️ §21–§22 → semi-pcb-assembly-reliability-design-flow-and-economics, the actual rules
imec and SEMI publications ⚠️ Roadmaps from non-vendors
ASML, TSMC and Intel technical disclosures ⚠️ Primary — and read as interested parties
SemiAnalysis, TechInsights, Epoch AI ⚠️ §27 — paywalled but the serious analysis
Miller, Chip War ⚠️ §26 → semi-pcb-assembly-reliability-design-flow-and-economics's geopolitics, readable

§31. Quick Reference

31.1 Picker

Question Where
Is "3nm" better than "4nm"? ⚠️ Meaningless across foundries. Compare density (§5 → semi-carriers-doping-junctions-mosfet-and-scaling)
Why did clock speeds stop rising? ⚠️ Dennard scaling ended; voltage couldn't follow (§5 → semi-carriers-doping-junctions-mosfet-and-scaling)
Why so many specialized accelerators? ⚠️ Dark silicon — you can't power it all (§5 → semi-carriers-doping-junctions-mosfet-and-scaling)
Why chiplets? ⚠️ Yield vs area, plus the reticle limit (§17 → semi-integration-yield-metrology-test-and-packaging, §20 → semi-integration-yield-metrology-test-and-packaging)
Why is my big die so expensive? ⚠️ Exponential yield loss (§17 → semi-integration-yield-metrology-test-and-packaging)
Why does EUV cost so much? ⚠️ Vacuum, reflective optics, tin plasma, one supplier (§11 → semi-cleanroom-lithography-deposition-etch-and-cmp, §26 → semi-pcb-assembly-reliability-design-flow-and-economics)
Where's the AI hardware bottleneck? ⚠️ Packaging and HBM, not logic (§27.2)
Should we design for the leading node? ⚠️ Mask cost sets minimum volume (§16 → semi-integration-yield-metrology-test-and-packaging, §25 → semi-pcb-assembly-reliability-design-flow-and-economics)
Why does the board material matter? ⚠️ Loss tangent and impedance at speed (§21 → semi-pcb-assembly-reliability-design-flow-and-economics)
Why did the solder joint crack? ⚠️ CTE mismatch under thermal cycling (§23 → semi-pcb-assembly-reliability-design-flow-and-economics)
Does running hot matter? ⚠️ Arrhenius. It consumes rated life (§23 → semi-pcb-assembly-reliability-design-flow-and-economics)
Why does ECC exist? ⚠️ Soft errors are physics, not defects (§23 → semi-pcb-assembly-reliability-design-flow-and-economics)

31.2 Design and sourcing checks

  • [ ] ⚠️ Node chosen on density/PPA and mask cost, not on the name (§5 → semi-carriers-doping-junctions-mosfet-and-scaling, §25 → semi-pcb-assembly-reliability-design-flow-and-economics)
  • [ ] ⚠️ Die size checked against yield model and reticle limit (§17 → semi-integration-yield-metrology-test-and-packaging)
  • [ ] Chiplet partition justified against known-good-die test cost (§19 → semi-integration-yield-metrology-test-and-packaging, §20 → semi-integration-yield-metrology-test-and-packaging)
  • [ ] ⚠️ Packaging technology and CAPACITY secured, not assumed (§20 → semi-integration-yield-metrology-test-and-packaging, §27.2)
  • [ ] HBM or memory allocation confirmed if relevant (§27.2)
  • [ ] ⚠️ Thermal path designed for the package, not just the die (§20 → semi-integration-yield-metrology-test-and-packaging, §23 → semi-pcb-assembly-reliability-design-flow-and-economics)
  • [ ] DFT coverage adequate and test time budgeted (§19 → semi-integration-yield-metrology-test-and-packaging)
  • [ ] ⚠️ DFM and density rules met — dummy fill, hot spots (§15 → semi-cleanroom-lithography-deposition-etch-and-cmp, §17 → semi-integration-yield-metrology-test-and-packaging) |
  • [ ] Board stack-up: impedance, loss tangent, return paths (§21 → semi-pcb-assembly-reliability-design-flow-and-economics)
  • [ ] ⚠️ Reliability targets stated with temperature and voltage (§23 → semi-pcb-assembly-reliability-design-flow-and-economics)
  • [ ] ⚠️ Single-source dependencies identified across the BOM (§26 → semi-pcb-assembly-reliability-design-flow-and-economics)

§32. Method

§1–§26 → semi-carriers-doping-junctions-mosfet-and-scaling, semi-transistor-architectures-interconnect-memory-and-wafers, semi-cleanroom-lithography-deposition-etch-and-cmp, semi-integration-yield-metrology-test-and-packaging, semi-pcb-assembly-reliability-design-flow-and-economics rests on settled device physics and mature manufacturing practice — MOSFET operation, the yield model, the lithography ladder, damascene copper, packaging types and the reliability mechanisms. ⚠️ None needed verification; the 60 mV/decade limit is Boltzmann statistics and Dennard's paper is from 1974.

Two searches were run in August 2026, on High-NA EUV and advanced packaging — ⚠️ the first because §11 → semi-cleanroom-lithography-deposition-etch-and-cmp's frontier just moved from R&D into production, the second because §20 → semi-integration-yield-metrology-test-and-packaging has become the industry's binding constraint and that is a structural reversal.

Confidence. High in §5 → semi-carriers-doping-junctions-mosfet-and-scaling and §17 → semi-integration-yield-metrology-test-and-packaging, which are the sections I'd most want read. ⚠️ The Dennard-versus-Moore distinction is the single most useful correction here: "Moore's Law is dead" is wrong in the way people usually mean it, and what actually ended was Dennard scaling — with the 60 mV/decade subthreshold floor as the specific physical reason, and multicore and dark silicon as the direct consequences. ⚠️ §17 → semi-integration-yield-metrology-test-and-packaging's exponential yield-versus-area relationship is the second, because it explains chiplets, binning, product stacks and the reticle limit all at once. §5 → semi-carriers-doping-junctions-mosfet-and-scaling's node-naming gotcha is the one that most often prevents a bad decision.

High on §27.1's production milestone, which comes from ASML's own press release confirming High-NA reached high-volume manufacturing on Intel 18A on 15 July 2026, and on the tool specifications reported by Intel. ⚠️ The genuinely interesting content is the DISAGREEMENT, and I've presented it as an open economic question rather than picking a winner — TSMC's position that Low-NA double patterning may still cost less than High-NA single patterning is a serious argument, and one analysis puts TSMC's likely adoption out around 2029–30. ⚠️ Cost figures ($360–400m), the 66% smaller features claim and the ~30% per-patterning-step cost adder are all from trade reporting and marked as reported.

Moderate-to-high on §27.2, and the confidence is uneven by claim. ⚠️ The Epoch AI estimate — roughly 90% of CoWoS and HBM against about 12% of advanced logic dies — is the best-sourced and most clarifying single datum, and it is explicitly an estimate. ⚠️ The capacity numbers are the weak part: sources give TSMC CoWoS 2026 figures ranging from about 45,000 to 140,000 wafers per month depending on date, scope and whether OSAT is included, and I have reported the range rather than picking one. ⚠️ Most of this material comes from market-intelligence firms, supply-chain consultancies and investment outlets with positions, which I've flagged in-section. ⚠️ The structural claim — that the constraint has moved from front end to back end — is consistent across every source and is the part worth carrying.

04 同仓库更多 Skills

the-vibey-project
the-vibey-project/vibey

white-paper-writing

Use when writing white papers, technical reports, policy documents, thought leadership pieces, or any long-form authoritative document. Triggers on requests to write, structure, outline, or review white papers, technical reports, position papers, policy briefs, or evidence-driven arguments. Also use for B2B content marketing strategy, technical documentation requiring authority, academic-style reports, or any document that must educate while persuading. Use when someone asks "how should I structure this" for a long-form document.

★ 5
the-vibey-project
the-vibey-project/vibey

prose-technical-mechanics

Use when editing or writing prose at a technical/mechanical level: choosing between Anglo-Saxon and Latinate diction, placing information in topic vs stress positions, writing periodic vs cumulative sentences, handling sentence rhythm, punctuation as logic, transitions, paragraph structure, or phonesthetics. Use when someone wants to understand WHY prose works or doesn't, not just surface-level style advice. Triggers on word choice, sentence structure, emphasis, rhythm, diction, or any deep writing mechanics question.

★ 5
the-vibey-project
the-vibey-project/vibey

prose-mechanics

Use when writing, editing, or analyzing prose style; when trying to avoid generic AI-sounding writing; when applying specific prose styles such as journalistic, academic, narrative, KJV biblical, Hemingway plain, Latinate/Jamesian, Orwellian, Augustan, Victorian, Early Modern (Bacon, Browne, Milton), or free indirect discourse; or when coaching someone on writing voice and mechanics. Triggers on any request to improve, analyze, or write in a specific prose style, to fix "AI-sounding" writing, to make prose more vivid or concrete, to vary sentence rhythm, or to understand how a particular writer achieves their effects.

★ 5
the-vibey-project
the-vibey-project/vibey

narrative-structure

Use when structuring stories, pitches, presentations, white papers, or any persuasive narrative; analyzing the hero's journey in fiction or non-fiction; applying StoryBrand for business communication; designing narrative arcs for thought leadership; or understanding Vogler, Snyder, Propp, or Campbell frameworks. Triggers on any narrative structure, storytelling, pitch structure, StoryBrand, hero's journey, three-act structure, Freytag, Save the Cat, narrative arc, or "how should I structure this story/pitch/presentation" request.

★ 5
the-vibey-project
the-vibey-project/vibey

legal-brief-writing

Use when writing legal briefs, motions, or any court filing; when analyzing judicial cognition and persuasion; when applying elite brief-writing techniques from Roberts, Clement, Kagan, Garner; or when structuring legal arguments for maximum persuasion. Also use for autistic/neurodivergent advocates who need to understand how their natural communication style maps to elite legal advocacy. Triggers on any legal writing, brief drafting, motion preparation, or legal argument structuring request.

★ 5
the-vibey-project
the-vibey-project/vibey

journal-publishability-criteria

Use whenever a research paper, article or preprint is being written, revised, reviewed or published, and specifically before every publication of docs/paper.md. Covers what legitimate journals actually gate on, in order of gating — the editor's desk screen (scope, novelty, package problems), what reviewers judge (methodological soundness, claims the evidence can carry, statistical and qualitative reporting), EQUATOR reporting guidelines, the ICMJE authorship criteria, COPE's view of text recycling, the near-universal generative-AI policy (no AI author, disclosure, author responsibility), TOP 2025 transparency standards, how to verify a journal is legitimate, submitting without an institution, and a pre-submission checklist. Triggers on requests to evaluate, review, prepare or submit a paper, to judge publishability, to write a declarations or data-availability section, to disclose AI use, or to check a journal.

★ 5