[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M7AMSTZN5VQ745SWGSK3QTKH":3,"skill-same:01M7AMSTZN5VQ745SWGSK3QTKH":48},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":16,"categories":17,"keywords":18,"publishedAt":19,"linkOnly":20,"markdownContent":21,"markdownBody":22,"frontMatter":23,"refName":24,"commitSha":25,"skillDirectory":26,"forksCount":27,"repositoryHtmlUrl":28,"repositoryHomepageUrl":29,"ownerHtmlUrl":30,"ownerBlogUrl":31,"ownerDescription":32,"updatedAt":33,"install":34,"resources":47},"01M7AMSTZN5VQ745SWGSK3QTKH","building-structure-foundations-envelope-services-and-fire",null,"Use for the technical core of a building: structural systems and how load paths and spans drive the whole design, foundations and their selection from ground conditions, envelope and building physics including thermal bridging, air tightness, vapour control and condensation risk, building services and their spatial coordination, and fire safety with compartmentation, means of escape and structural fire resistance.","the-vibey-project\u002Fvibey","the-vibey-project","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F329298758?v=4","01M7AJHGZ9722CTJ4JNQZVRH0Q","the vibey project","01M7AJHGZVMG2K7TGXQ6XFHVG3",5,"MIT","https:\u002F\u002Fgithub.com\u002Fthe-vibey-project\u002Fvibey\u002Fblob\u002Fdevelop\u002Fsrc\u002Fvibey_tools\u002Fskills\u002Fplugins\u002Fdesigning-and-building-buildings\u002Fskills\u002Fbuilding-structure-foundations-envelope-services-and-fire\u002FSKILL.md",[],[],"2026-11-15 14:19:17",false,"---\nname: building-structure-foundations-envelope-services-and-fire\ndescription: \"Use for the technical core of a building: structural systems and how load paths and spans drive the whole design, foundations and their selection from ground conditions, envelope and building physics including thermal bridging, air tightness, vapour control and condensation risk, building services and their spatial coordination, and fire safety with compartmentation, means of escape and structural fire resistance.\"\n---\n\n# Buildings and Civil Structures: Structural Systems, Foundations, Envelope and Building Physics, Building Services, and Fire Safety\n\n> **Part 2 of 6** of the *Designing and Building Buildings and Other Civil Structures* reference (plugin `designing-and-building-buildings`), covering §6–§10. Sibling skills: `building-disciplines-site-brief-planning-and-design` (§0–§5), `building-accessibility-energy-drawings-bim-and-codes` (§11–§14), `building-procurement-cost-sequencing-materials-and-quality` (§15–§19), `building-site-safety-commissioning-retrofit-and-why-projects-fail` (§20–§23), `building-reference` (§24–§29). Section numbers are shared across the set; a reference written as §N → `skill` points into that sibling skill.\n>\n> **Currency:** The engineering is settled. Two areas moved. See §24 → `building-reference` for tall mass timber code adoption, and embodied carbon regulation.\n\n> **⚠️ The practice companion to a civil\u002Findustrial engineering reference.** ⚠️ **That one\n> translates concepts for outsiders — factor of safety, codes as accumulated failure logs,\n> the megaproject estimation record.** **This one is how the work is actually done.**\n>\n> **⚠️ The organizing reality: a building is a MULTI-DISCIPLINARY SYSTEM delivered by\n> parties with different contracts, different liabilities and different incentives.**\n> ⚠️ **Most building failures are not engineering failures — they are COORDINATION\n> failures at the boundaries between disciplines and between design and construction**\n> (§23 → `building-site-safety-commissioning-retrofit-and-why-projects-fail`).\n>\n> **⚠️ GOTCHA** boxes mark the assumptions that cause litigation.\n>\n> **⚠️ Scope note**: ⚠️ **structural, fire and geotechnical design are licensed activities\n> in most jurisdictions for good reason. This is a map of the territory, not a\n> substitute for a qualified engineer or a local code review.**\n>\n> **The three ideas that organize this document:**\n> 1. **⚠️ Design decisions bind cost early and irreversibly** (§1 → `building-disciplines-site-brief-planning-and-design`, §16 → `building-procurement-cost-sequencing-materials-and-quality`). **Most of a\n>    building's cost and carbon are committed during concept design, when almost nothing\n>    has been spent.**\n> 2. **⚠️ WATER destroys more buildings than structural failure** (§8). **Envelope and\n>    moisture management cause the overwhelming majority of building defects, claims and\n>    premature failures — and they are the least glamorous part of the job.**\n> 3. **⚠️ Load paths and lateral systems are the two things a structure is** (§6).\n>    **Gravity is the obvious problem; wind and seismic are the ones that govern.**\n\n---\n\n## §6. ⚠️ Structural Systems\n\n> **⚠️ A structure does two jobs: carry gravity down, and resist lateral load without\n> falling over. The second is what usually governs.**\n```\n⚠️ GRAVITY SYSTEM  slab → beam → column → foundation.\n   ⚠️ TRACE THE LOAD PATH — every load needs a continuous route to\n   the ground, and an interrupted path (a removed wall, a transfer\n   nobody designed) is how buildings fail\n⚠️ LATERAL SYSTEM  wind and seismic\n   ⚠️ MOMENT FRAMES  rigid joints; ductile, flexible, expensive\n   ⚠️ BRACED FRAMES  stiff, efficient, ⚠️ the bracing has to go\n      somewhere and architects hate where\n   ⚠️ SHEAR WALLS \u002F CORES  stiff; usually the lift and stair core\n   ⚠️ DIAPHRAGMS  ⚠️ the floor plates that collect lateral load and\n      deliver it to the vertical system. Openings weaken them\n⚠️ STABILITY  ⚠️ overturning, sliding, P-delta, torsion (⚠️ from\n   plan asymmetry — an off-centre core twists the building)\n⚠️ ROBUSTNESS  ⚠️ resistance to DISPROPORTIONATE COLLAPSE: alternate\n   load paths, tying, key element design. ⚠️ This entered codes\n   because of Ronan Point, and it is why a local failure should\n   not take out a building\n```\n**⚠️ System selection by material**: ⚠️ **reinforced concrete (flat slab, post-tensioned,\none\u002Ftwo-way), structural steel (fast erection, long spans, needs fire protection), mass\ntimber (§24.1 → `building-reference`), masonry (compression only), and hybrids.**\n**⚠️ Serviceability often governs over strength**: ⚠️ **deflection, vibration (⚠️ floor\nvibration is a common and expensive complaint in long-span offices and gyms), crack\ncontrol, and drift limits.** **A structure can be strong enough and unusable.**\n**⚠️ Seismic design is a distinct discipline**: ⚠️ **capacity design deliberately chooses\nwhere yielding occurs; ductility is engineered so buildings deform rather than shatter;\nand ⚠️ code seismic design targets LIFE SAFETY, not building survival — a code-compliant\nbuilding may be a total loss after a design-level earthquake, which owners are frequently\nsurprised to learn.**\n\n---\n\n## §7. Foundations\n\n**⚠️ Shallow versus deep is decided by what's at depth, not by preference** (§2 → `building-disciplines-site-brief-planning-and-design`).\n```\n⚠️ SHALLOW  pad\u002Fspread footings · strip footings · ⚠️ RAFT\u002FMAT\n   (spreads load, bridges variable ground)\n⚠️ DEEP  ⚠️ driven piles (displacement, noisy, good verification\n   from driving records) · bored piles (quiet, large capacity,\n   ⚠️ harder to verify) · caissons · ground improvement\n⚠️ RETAINING and BASEMENTS  ⚠️ sheet piling, secant\u002Fcontiguous\n   piles, diaphragm walls, ⚠️ and the fact that basements are\n   disproportionately expensive and risky (water, adjacent\n   structures, temporary works — §17)\n⚠️ UNDERPINNING  supporting an existing structure while working\n   beneath it\n```\n**⚠️ Water is the recurring foundation problem**: ⚠️ **buoyancy\u002Fuplift on basements (a\nlightweight basement can FLOAT), dewatering and its effect on neighbours' settlement, and\nwaterproofing (§8).**\n**⚠️ Party wall and adjacent structure obligations** are legal as well as technical, and\n⚠️ **monitoring of neighbouring buildings is standard on deep excavation.**\n\n---\n\n## §8. ⚠️ Envelope and Building Physics\n\n> **⚠️ THE section. Water and vapour cause the overwhelming majority of building defects,\n> claims and premature failures — far more than structural inadequacy.**\n```\n⚠️ THE FOUR CONTROL LAYERS, in order of importance\n   ⚠️ 1. WATER control  ⚠️ the most important, and the most botched\n   ⚠️ 2. AIR control  ⚠️ air leakage carries far more moisture than\n        vapour diffusion does. ⚠️ This surprises people and it is\n        why airtightness matters for durability, not just energy\n   3. VAPOUR control\n   4. THERMAL control\n⚠️ RAINSCREEN PRINCIPLE  ⚠️ accept that the outer skin leaks;\n   provide a drained and ventilated cavity and a drainage plane\n   behind it. ⚠️ \"Perfect barrier\" designs fail at the first\n   sealant failure — and sealant is a maintenance item\n⚠️ FLASHING  ⚠️ at every penetration and transition, lapped\n   SHINGLE-FASHION so water is always directed OUT\n⚠️ THERMAL BRIDGING  ⚠️ a continuous conductive path through\n   insulation. Causes heat loss AND local cold surfaces where\n   condensation forms (balcony slabs are the classic)\n⚠️ VAPOUR CONTROL IS CLIMATE-DEPENDENT  ⚠️ the retarder goes on\n   the warm-in-winter side in heating climates and the logic\n   INVERTS in hot-humid climates. ⚠️ Copying a detail from the\n   wrong climate zone traps moisture inside the assembly and rots it\n⚠️ DRYING POTENTIAL  ⚠️ assemblies get wet; design so they can dry\n   in at least one direction. Two impermeable layers is a trap\n```\n**⚠️ Roofs**: ⚠️ **falls and drainage (⚠️ ponding is a design failure, and blocked outlets\nhave collapsed roofs under water load), overflow provision, upstands, and the fact that\nflat roofs are not flat.**\n**⚠️ Interstitial condensation, mould and durability** — ⚠️ **and note that mould is an\noccupant health issue and a legal one, not merely cosmetic.**\n\n---\n\n## §9. Building Services\n\n**⚠️ MEP is typically a large fraction of the cost and nearly all of the coordination\nproblem.**\n**⚠️ Mechanical**: **heating, cooling, ventilation; ⚠️ all-air vs hydronic vs VRF; heat\npumps; and ⚠️ ventilation as an indoor-air-quality requirement, not a comfort one**\n(see a refrigeration\u002FHVAC reference for the physics).\n**⚠️ Electrical**: **supply capacity, distribution, lighting, emergency systems,\n⚠️ and the reality that electrical demand is rising with electrification and EV charging.**\n**⚠️ Plumbing and drainage**: ⚠️ **gravity drainage means FALLS, which means the drainage\nlayout constrains the plan more than people expect, especially in basements and in\nconversions.**\n**⚠️ Fire protection**: **sprinklers, detection, alarm, smoke control** (§10).\n> **⚠️ GOTCHA — SPATIAL COORDINATION is where MEP goes wrong, and it goes wrong in the\n> ceiling void.** ⚠️ **Ducts, pipes, cable trays, sprinklers, lighting and structure all\n> want the same 400 mm.** **⚠️ Clash detection in BIM (§13 → `building-accessibility-energy-drawings-bim-and-codes`) catches geometric clashes;\n> it does NOT catch access for maintenance, installation sequence, or the fact that a\n> valve is now above a fixed ceiling in a locked room.**\n\n**⚠️ Riser and plant space** must be planned from the start — ⚠️ **services space is\nnotoriously under-allocated at concept and then fought over forever.**\n\n---\n\n## §10. Fire Safety\n\n**⚠️ Fire strategy is a design discipline, not a checklist, and it drives plan layout.**\n```\n⚠️ THE OBJECTIVES  life safety first · then property · then\n   business continuity · ⚠️ and firefighter safety\n⚠️ THE STRATEGIES\n   ⚠️ COMPARTMENTATION  contain fire for a rated period.\n      ⚠️ Penetrations must be firestopped — and unsealed service\n      penetrations are one of the most common serious defects found\n      in existing buildings\n   ⚠️ MEANS OF ESCAPE  travel distances, exit capacity, protected\n      stairs, ⚠️ and the fundamental question of whether the strategy\n      is simultaneous evacuation, phased, or stay-put\n   ⚠️ STRUCTURAL FIRE RESISTANCE  ratings by element and construction\n      type. ⚠️ Steel loses strength rapidly when heated and must be\n      protected; concrete spalls; ⚠️ timber CHARS at a predictable\n      rate, which is how mass timber is engineered (§24.1)\n   SUPPRESSION  sprinklers (⚠️ the single most effective measure)\n   SMOKE CONTROL · fire service access and firefighting shafts\n⚠️ EXTERNAL FIRE SPREAD  ⚠️ façade and cladding combustibility —\n   the subject of major regulatory change in multiple jurisdictions\n   following high-casualty fires\n```\n**⚠️ Prescriptive versus performance-based design**: ⚠️ **prescriptive follows the code\ntables; performance-based demonstrates equivalent safety by analysis and requires far more\njustification and review.**\n","# Buildings and Civil Structures: Structural Systems, Foundations, Envelope and Building Physics, Building Services, and Fire Safety\n\n> **Part 2 of 6** of the *Designing and Building Buildings and Other Civil Structures* reference (plugin `designing-and-building-buildings`), covering §6–§10. Sibling skills: `building-disciplines-site-brief-planning-and-design` (§0–§5), `building-accessibility-energy-drawings-bim-and-codes` (§11–§14), `building-procurement-cost-sequencing-materials-and-quality` (§15–§19), `building-site-safety-commissioning-retrofit-and-why-projects-fail` (§20–§23), `building-reference` (§24–§29). Section numbers are shared across the set; a reference written as §N → `skill` points into that sibling skill.\n>\n> **Currency:** The engineering is settled. Two areas moved. See §24 → `building-reference` for tall mass timber code adoption, and embodied carbon regulation.\n\n> **⚠️ The practice companion to a civil\u002Findustrial engineering reference.** ⚠️ **That one\n> translates concepts for outsiders — factor of safety, codes as accumulated failure logs,\n> the megaproject estimation record.** **This one is how the work is actually done.**\n>\n> **⚠️ The organizing reality: a building is a MULTI-DISCIPLINARY SYSTEM delivered by\n> parties with different contracts, different liabilities and different incentives.**\n> ⚠️ **Most building failures are not engineering failures — they are COORDINATION\n> failures at the boundaries between disciplines and between design and construction**\n> (§23 → `building-site-safety-commissioning-retrofit-and-why-projects-fail`).\n>\n> **⚠️ GOTCHA** boxes mark the assumptions that cause litigation.\n>\n> **⚠️ Scope note**: ⚠️ **structural, fire and geotechnical design are licensed activities\n> in most jurisdictions for good reason. This is a map of the territory, not a\n> substitute for a qualified engineer or a local code review.**\n>\n> **The three ideas that organize this document:**\n> 1. **⚠️ Design decisions bind cost early and irreversibly** (§1 → `building-disciplines-site-brief-planning-and-design`, §16 → `building-procurement-cost-sequencing-materials-and-quality`). **Most of a\n>    building's cost and carbon are committed during concept design, when almost nothing\n>    has been spent.**\n> 2. **⚠️ WATER destroys more buildings than structural failure** (§8). **Envelope and\n>    moisture management cause the overwhelming majority of building defects, claims and\n>    premature failures — and they are the least glamorous part of the job.**\n> 3. **⚠️ Load paths and lateral systems are the two things a structure is** (§6).\n>    **Gravity is the obvious problem; wind and seismic are the ones that govern.**\n\n---\n\n## §6. ⚠️ Structural Systems\n\n> **⚠️ A structure does two jobs: carry gravity down, and resist lateral load without\n> falling over. The second is what usually governs.**\n```\n⚠️ GRAVITY SYSTEM  slab → beam → column → foundation.\n   ⚠️ TRACE THE LOAD PATH — every load needs a continuous route to\n   the ground, and an interrupted path (a removed wall, a transfer\n   nobody designed) is how buildings fail\n⚠️ LATERAL SYSTEM  wind and seismic\n   ⚠️ MOMENT FRAMES  rigid joints; ductile, flexible, expensive\n   ⚠️ BRACED FRAMES  stiff, efficient, ⚠️ the bracing has to go\n      somewhere and architects hate where\n   ⚠️ SHEAR WALLS \u002F CORES  stiff; usually the lift and stair core\n   ⚠️ DIAPHRAGMS  ⚠️ the floor plates that collect lateral load and\n      deliver it to the vertical system. Openings weaken them\n⚠️ STABILITY  ⚠️ overturning, sliding, P-delta, torsion (⚠️ from\n   plan asymmetry — an off-centre core twists the building)\n⚠️ ROBUSTNESS  ⚠️ resistance to DISPROPORTIONATE COLLAPSE: alternate\n   load paths, tying, key element design. ⚠️ This entered codes\n   because of Ronan Point, and it is why a local failure should\n   not take out a building\n```\n**⚠️ System selection by material**: ⚠️ **reinforced concrete (flat slab, post-tensioned,\none\u002Ftwo-way), structural steel (fast erection, long spans, needs fire protection), mass\ntimber (§24.1 → `building-reference`), masonry (compression only), and hybrids.**\n**⚠️ Serviceability often governs over strength**: ⚠️ **deflection, vibration (⚠️ floor\nvibration is a common and expensive complaint in long-span offices and gyms), crack\ncontrol, and drift limits.** **A structure can be strong enough and unusable.**\n**⚠️ Seismic design is a distinct discipline**: ⚠️ **capacity design deliberately chooses\nwhere yielding occurs; ductility is engineered so buildings deform rather than shatter;\nand ⚠️ code seismic design targets LIFE SAFETY, not building survival — a code-compliant\nbuilding may be a total loss after a design-level earthquake, which owners are frequently\nsurprised to learn.**\n\n---\n\n## §7. Foundations\n\n**⚠️ Shallow versus deep is decided by what's at depth, not by preference** (§2 → `building-disciplines-site-brief-planning-and-design`).\n```\n⚠️ SHALLOW  pad\u002Fspread footings · strip footings · ⚠️ RAFT\u002FMAT\n   (spreads load, bridges variable ground)\n⚠️ DEEP  ⚠️ driven piles (displacement, noisy, good verification\n   from driving records) · bored piles (quiet, large capacity,\n   ⚠️ harder to verify) · caissons · ground improvement\n⚠️ RETAINING and BASEMENTS  ⚠️ sheet piling, secant\u002Fcontiguous\n   piles, diaphragm walls, ⚠️ and the fact that basements are\n   disproportionately expensive and risky (water, adjacent\n   structures, temporary works — §17)\n⚠️ UNDERPINNING  supporting an existing structure while working\n   beneath it\n```\n**⚠️ Water is the recurring foundation problem**: ⚠️ **buoyancy\u002Fuplift on basements (a\nlightweight basement can FLOAT), dewatering and its effect on neighbours' settlement, and\nwaterproofing (§8).**\n**⚠️ Party wall and adjacent structure obligations** are legal as well as technical, and\n⚠️ **monitoring of neighbouring buildings is standard on deep excavation.**\n\n---\n\n## §8. ⚠️ Envelope and Building Physics\n\n> **⚠️ THE section. Water and vapour cause the overwhelming majority of building defects,\n> claims and premature failures — far more than structural inadequacy.**\n```\n⚠️ THE FOUR CONTROL LAYERS, in order of importance\n   ⚠️ 1. WATER control  ⚠️ the most important, and the most botched\n   ⚠️ 2. AIR control  ⚠️ air leakage carries far more moisture than\n        vapour diffusion does. ⚠️ This surprises people and it is\n        why airtightness matters for durability, not just energy\n   3. VAPOUR control\n   4. THERMAL control\n⚠️ RAINSCREEN PRINCIPLE  ⚠️ accept that the outer skin leaks;\n   provide a drained and ventilated cavity and a drainage plane\n   behind it. ⚠️ \"Perfect barrier\" designs fail at the first\n   sealant failure — and sealant is a maintenance item\n⚠️ FLASHING  ⚠️ at every penetration and transition, lapped\n   SHINGLE-FASHION so water is always directed OUT\n⚠️ THERMAL BRIDGING  ⚠️ a continuous conductive path through\n   insulation. Causes heat loss AND local cold surfaces where\n   condensation forms (balcony slabs are the classic)\n⚠️ VAPOUR CONTROL IS CLIMATE-DEPENDENT  ⚠️ the retarder goes on\n   the warm-in-winter side in heating climates and the logic\n   INVERTS in hot-humid climates. ⚠️ Copying a detail from the\n   wrong climate zone traps moisture inside the assembly and rots it\n⚠️ DRYING POTENTIAL  ⚠️ assemblies get wet; design so they can dry\n   in at least one direction. Two impermeable layers is a trap\n```\n**⚠️ Roofs**: ⚠️ **falls and drainage (⚠️ ponding is a design failure, and blocked outlets\nhave collapsed roofs under water load), overflow provision, upstands, and the fact that\nflat roofs are not flat.**\n**⚠️ Interstitial condensation, mould and durability** — ⚠️ **and note that mould is an\noccupant health issue and a legal one, not merely cosmetic.**\n\n---\n\n## §9. Building Services\n\n**⚠️ MEP is typically a large fraction of the cost and nearly all of the coordination\nproblem.**\n**⚠️ Mechanical**: **heating, cooling, ventilation; ⚠️ all-air vs hydronic vs VRF; heat\npumps; and ⚠️ ventilation as an indoor-air-quality requirement, not a comfort one**\n(see a refrigeration\u002FHVAC reference for the physics).\n**⚠️ Electrical**: **supply capacity, distribution, lighting, emergency systems,\n⚠️ and the reality that electrical demand is rising with electrification and EV charging.**\n**⚠️ Plumbing and drainage**: ⚠️ **gravity drainage means FALLS, which means the drainage\nlayout constrains the plan more than people expect, especially in basements and in\nconversions.**\n**⚠️ Fire protection**: **sprinklers, detection, alarm, smoke control** (§10).\n> **⚠️ GOTCHA — SPATIAL COORDINATION is where MEP goes wrong, and it goes wrong in the\n> ceiling void.** ⚠️ **Ducts, pipes, cable trays, sprinklers, lighting and structure all\n> want the same 400 mm.** **⚠️ Clash detection in BIM (§13 → `building-accessibility-energy-drawings-bim-and-codes`) catches geometric clashes;\n> it does NOT catch access for maintenance, installation sequence, or the fact that a\n> valve is now above a fixed ceiling in a locked room.**\n\n**⚠️ Riser and plant space** must be planned from the start — ⚠️ **services space is\nnotoriously under-allocated at concept and then fought over forever.**\n\n---\n\n## §10. Fire Safety\n\n**⚠️ Fire strategy is a design discipline, not a checklist, and it drives plan layout.**\n```\n⚠️ THE OBJECTIVES  life safety first · then property · then\n   business continuity · ⚠️ and firefighter safety\n⚠️ THE STRATEGIES\n   ⚠️ COMPARTMENTATION  contain fire for a rated period.\n      ⚠️ Penetrations must be firestopped — and unsealed service\n      penetrations are one of the most common serious defects found\n      in existing buildings\n   ⚠️ MEANS OF ESCAPE  travel distances, exit capacity, protected\n      stairs, ⚠️ and the fundamental question of whether the strategy\n      is simultaneous evacuation, phased, or stay-put\n   ⚠️ STRUCTURAL FIRE RESISTANCE  ratings by element and construction\n      type. ⚠️ Steel loses strength rapidly when heated and must be\n      protected; concrete spalls; ⚠️ timber CHARS at a predictable\n      rate, which is how mass timber is engineered (§24.1)\n   SUPPRESSION  sprinklers (⚠️ the single most effective measure)\n   SMOKE CONTROL · fire service access and firefighting shafts\n⚠️ EXTERNAL FIRE SPREAD  ⚠️ façade and cladding combustibility —\n   the subject of major regulatory change in multiple jurisdictions\n   following high-casualty fires\n```\n**⚠️ Prescriptive versus performance-based design**: ⚠️ **prescriptive follows the code\ntables; performance-based demonstrates equivalent safety by analysis and requires far more\njustification and review.**\n",{"name":5,"description":7},"develop","ae32736a1aabddabca5d2c96d665aa0ebc7d8700","src\u002Fvibey_tools\u002Fskills\u002Fplugins\u002Fdesigning-and-building-buildings\u002Fskills\u002Fbuilding-structure-foundations-envelope-services-and-fire",3,"https:\u002F\u002Fgithub.com\u002Fthe-vibey-project\u002Fvibey","https:\u002F\u002Fthe-vibey-project.github.io\u002Fvibey\u002F","https:\u002F\u002Fgithub.com\u002Fthe-vibey-project","https:\u002F\u002Fvibewithadam.matthewsteinberger.com","freedom for software engineers","2026-11-15 05:47:42",{"source":8,"skillName":5,"commands":35,"prompt":45,"zipAvailable":46},[36,39,42],{"tool":37,"command":38},"npx","npx skills add the-vibey-project\u002Fvibey --skill building-structure-foundations-envelope-services-and-fire",{"tool":40,"command":41},"bunx","bunx skills add the-vibey-project\u002Fvibey --skill building-structure-foundations-envelope-services-and-fire",{"tool":43,"command":44},"pnpm","pnpm dlx skills add the-vibey-project\u002Fvibey --skill building-structure-foundations-envelope-services-and-fire","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002Fthe-vibey-project\u002Fvibey\u002Fblob\u002Fdevelop\u002Fsrc\u002Fvibey_tools\u002Fskills\u002Fplugins\u002Fdesigning-and-building-buildings\u002Fskills\u002Fbuilding-structure-foundations-envelope-services-and-fire\u002FSKILL.md",true,[],[49,56,63,70,77,84],{"skillNo":50,"name":51,"nameZh":6,"description":52,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":53,"categories":54,"keywords":55,"publishedAt":19},"01M7AT1FQJAE1FQYAMDTF490Y4","white-paper-writing","Use when writing white papers, technical reports, policy documents, thought leadership pieces, or any long-form authoritative document. Triggers on requests to write, structure, outline, or review white papers, technical reports, position papers, policy briefs, or evidence-driven arguments. Also use for B2B content marketing strategy, technical documentation requiring authority, academic-style reports, or any document that must educate while persuading. Use when someone asks \"how should I structure this\" for a long-form document.","https:\u002F\u002Fgithub.com\u002Fthe-vibey-project\u002Fvibey\u002Fblob\u002Fdevelop\u002Fsrc\u002Fvibey_tools\u002Fskills\u002Fplugins\u002Fwriting-craft\u002Fskills\u002Fwhite-paper-writing\u002FSKILL.md",[],[],{"skillNo":57,"name":58,"nameZh":6,"description":59,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":60,"categories":61,"keywords":62,"publishedAt":19},"01M7AT16BJRJJKK2MASXRZS76G","prose-technical-mechanics","Use when editing or writing prose at a technical\u002Fmechanical level: choosing between Anglo-Saxon and Latinate diction, placing information in topic vs stress positions, writing periodic vs cumulative sentences, handling sentence rhythm, punctuation as logic, transitions, paragraph structure, or phonesthetics. Use when someone wants to understand WHY prose works or doesn't, not just surface-level style advice. Triggers on word choice, sentence structure, emphasis, rhythm, diction, or any deep writing mechanics question.","https:\u002F\u002Fgithub.com\u002Fthe-vibey-project\u002Fvibey\u002Fblob\u002Fdevelop\u002Fsrc\u002Fvibey_tools\u002Fskills\u002Fplugins\u002Fwriting-craft\u002Fskills\u002Fprose-technical-mechanics\u002FSKILL.md",[],[],{"skillNo":64,"name":65,"nameZh":6,"description":66,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":67,"categories":68,"keywords":69,"publishedAt":19},"01M7AT0W9HT0ZZ9Y287NW99MR3","prose-mechanics","Use when writing, editing, or analyzing prose style; when trying to avoid generic AI-sounding writing; when applying specific prose styles such as journalistic, academic, narrative, KJV biblical, Hemingway plain, Latinate\u002FJamesian, Orwellian, Augustan, Victorian, Early Modern (Bacon, Browne, Milton), or free indirect discourse; or when coaching someone on writing voice and mechanics. Triggers on any request to improve, analyze, or write in a specific prose style, to fix \"AI-sounding\" writing, to make prose more vivid or concrete, to vary sentence rhythm, or to understand how a particular writer achieves their effects.","https:\u002F\u002Fgithub.com\u002Fthe-vibey-project\u002Fvibey\u002Fblob\u002Fdevelop\u002Fsrc\u002Fvibey_tools\u002Fskills\u002Fplugins\u002Fwriting-craft\u002Fskills\u002Fprose-mechanics\u002FSKILL.md",[],[],{"skillNo":71,"name":72,"nameZh":6,"description":73,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":74,"categories":75,"keywords":76,"publishedAt":19},"01M7AT0KR635JX66X2X6F3E2CP","narrative-structure","Use when structuring stories, pitches, presentations, white papers, or any persuasive narrative; analyzing the hero's journey in fiction or non-fiction; applying StoryBrand for business communication; designing narrative arcs for thought leadership; or understanding Vogler, Snyder, Propp, or Campbell frameworks. Triggers on any narrative structure, storytelling, pitch structure, StoryBrand, hero's journey, three-act structure, Freytag, Save the Cat, narrative arc, or \"how should I structure this story\u002Fpitch\u002Fpresentation\" request.","https:\u002F\u002Fgithub.com\u002Fthe-vibey-project\u002Fvibey\u002Fblob\u002Fdevelop\u002Fsrc\u002Fvibey_tools\u002Fskills\u002Fplugins\u002Fwriting-craft\u002Fskills\u002Fnarrative-structure\u002FSKILL.md",[],[],{"skillNo":78,"name":79,"nameZh":6,"description":80,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":81,"categories":82,"keywords":83,"publishedAt":19},"01M7AT0AKGW09NKKZDYBT8VRDE","legal-brief-writing","Use when writing legal briefs, motions, or any court filing; when analyzing judicial cognition and persuasion; when applying elite brief-writing techniques from Roberts, Clement, Kagan, Garner; or when structuring legal arguments for maximum persuasion. Also use for autistic\u002Fneurodivergent advocates who need to understand how their natural communication style maps to elite legal advocacy. Triggers on any legal writing, brief drafting, motion preparation, or legal argument structuring request.","https:\u002F\u002Fgithub.com\u002Fthe-vibey-project\u002Fvibey\u002Fblob\u002Fdevelop\u002Fsrc\u002Fvibey_tools\u002Fskills\u002Fplugins\u002Fwriting-craft\u002Fskills\u002Flegal-brief-writing\u002FSKILL.md",[],[],{"skillNo":85,"name":86,"nameZh":6,"description":87,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":88,"categories":89,"keywords":90,"publishedAt":19},"01M7AT00VWPS4Q8B5VEMXX9NQT","journal-publishability-criteria","Use whenever a research paper, article or preprint is being written, revised, reviewed or published, and specifically before every publication of docs\u002Fpaper.md. Covers what legitimate journals actually gate on, in order of gating — the editor's desk screen (scope, novelty, package problems), what reviewers judge (methodological soundness, claims the evidence can carry, statistical and qualitative reporting), EQUATOR reporting guidelines, the ICMJE authorship criteria, COPE's view of text recycling, the near-universal generative-AI policy (no AI author, disclosure, author responsibility), TOP 2025 transparency standards, how to verify a journal is legitimate, submitting without an institution, and a pre-submission checklist. Triggers on requests to evaluate, review, prepare or submit a paper, to judge publishability, to write a declarations or data-availability section, to disclose AI use, or to check a journal.","https:\u002F\u002Fgithub.com\u002Fthe-vibey-project\u002Fvibey\u002Fblob\u002Fdevelop\u002Fsrc\u002Fvibey_tools\u002Fskills\u002Fplugins\u002Fwriting-craft\u002Fskills\u002Fjournal-publishability-criteria\u002FSKILL.md",[],[]]