[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M7AMSMDXD25HFBT5DGDBMDP1":3,"skill-same:01M7AMSMDXD25HFBT5DGDBMDP1":48},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":16,"categories":17,"keywords":18,"publishedAt":19,"linkOnly":20,"markdownContent":21,"markdownBody":22,"frontMatter":23,"refName":24,"commitSha":25,"skillDirectory":26,"forksCount":27,"repositoryHtmlUrl":28,"repositoryHomepageUrl":29,"ownerHtmlUrl":30,"ownerBlogUrl":31,"ownerDescription":32,"updatedAt":33,"install":34,"resources":47},"01M7AMSMDXD25HFBT5DGDBMDP1","building-site-safety-commissioning-retrofit-and-why-projects-fail",null,"Use for the end of the project and the lessons from projects that went wrong: site safety and the hazards that actually cause injuries and fatalities, commissioning and handover and why buildings so often do not perform as designed, existing buildings and retrofit including survey, structural intervention and hazardous materials, and a direct account of why projects fail.","the-vibey-project\u002Fvibey","the-vibey-project","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F329298758?v=4","01M7AJHGZ9722CTJ4JNQZVRH0Q","the vibey project","01M7AJHGZVMG2K7TGXQ6XFHVG3",5,"MIT","https:\u002F\u002Fgithub.com\u002Fthe-vibey-project\u002Fvibey\u002Fblob\u002Fdevelop\u002Fsrc\u002Fvibey_tools\u002Fskills\u002Fplugins\u002Fdesigning-and-building-buildings\u002Fskills\u002Fbuilding-site-safety-commissioning-retrofit-and-why-projects-fail\u002FSKILL.md",[],[],"2026-11-15 14:19:17",false,"---\nname: building-site-safety-commissioning-retrofit-and-why-projects-fail\ndescription: \"Use for the end of the project and the lessons from projects that went wrong: site safety and the hazards that actually cause injuries and fatalities, commissioning and handover and why buildings so often do not perform as designed, existing buildings and retrofit including survey, structural intervention and hazardous materials, and a direct account of why projects fail.\"\n---\n\n# Buildings and Civil Structures: Site Safety, Commissioning and Handover, Existing Buildings and Retrofit, and Why Projects Fail\n\n> **Part 5 of 6** of the *Designing and Building Buildings and Other Civil Structures* reference (plugin `designing-and-building-buildings`), covering §20–§23. Sibling skills: `building-disciplines-site-brief-planning-and-design` (§0–§5), `building-structure-foundations-envelope-services-and-fire` (§6–§10), `building-accessibility-energy-drawings-bim-and-codes` (§11–§14), `building-procurement-cost-sequencing-materials-and-quality` (§15–§19), `building-reference` (§24–§29). Section numbers are shared across the set; a reference written as §N → `skill` points into that sibling skill.\n>\n> **Currency:** The engineering is settled. Two areas moved. See §24 → `building-reference` for tall mass timber code adoption, and embodied carbon regulation.\n\n> **⚠️ The practice companion to a civil\u002Findustrial engineering reference.** ⚠️ **That one\n> translates concepts for outsiders — factor of safety, codes as accumulated failure logs,\n> the megaproject estimation record.** **This one is how the work is actually done.**\n>\n> **⚠️ The organizing reality: a building is a MULTI-DISCIPLINARY SYSTEM delivered by\n> parties with different contracts, different liabilities and different incentives.**\n> ⚠️ **Most building failures are not engineering failures — they are COORDINATION\n> failures at the boundaries between disciplines and between design and construction**\n> (§23).\n>\n> **⚠️ GOTCHA** boxes mark the assumptions that cause litigation.\n>\n> **⚠️ Scope note**: ⚠️ **structural, fire and geotechnical design are licensed activities\n> in most jurisdictions for good reason. This is a map of the territory, not a\n> substitute for a qualified engineer or a local code review.**\n>\n> **The three ideas that organize this document:**\n> 1. **⚠️ Design decisions bind cost early and irreversibly** (§1 → `building-disciplines-site-brief-planning-and-design`, §16 → `building-procurement-cost-sequencing-materials-and-quality`). **Most of a\n>    building's cost and carbon are committed during concept design, when almost nothing\n>    has been spent.**\n> 2. **⚠️ WATER destroys more buildings than structural failure** (§8 → `building-structure-foundations-envelope-services-and-fire`). **Envelope and\n>    moisture management cause the overwhelming majority of building defects, claims and\n>    premature failures — and they are the least glamorous part of the job.**\n> 3. **⚠️ Load paths and lateral systems are the two things a structure is** (§6 → `building-structure-foundations-envelope-services-and-fire`).\n>    **Gravity is the obvious problem; wind and seismic are the ones that govern.**\n\n---\n\n## §20. Site Safety\n\n**⚠️ Construction has a disproportionate share of workplace fatalities, and the causes are\nconcentrated and well known.**\n```\n⚠️ THE RECURRING FATAL FOUR  ⚠️ FALLS FROM HEIGHT (the largest by far) ·\n   struck-by · caught-in\u002Fbetween · electrocution\n⚠️ ALSO  ⚠️ excavation collapse (⚠️ a cubic metre of soil weighs\n   well over a tonne, and unshored trenches kill quickly) ·\n   confined spaces · lifting operations · ⚠️ silica dust and\n   asbestos (⚠️ long-latency, and the biggest killer by total\n   deaths in some jurisdictions)\n⚠️ THE CONTROLS  design out the hazard first (⚠️ prevention through\n   design \u002F CDM Regulations make this a DESIGNER duty in some\n   jurisdictions) → engineering controls → then PPE\n```\n**⚠️ The designer's role is real**: ⚠️ **specifying a detail that can only be installed by\nsomeone working at height on a ladder is a design decision with a safety consequence.**\n\n---\n\n## §21. Commissioning and Handover\n\n**⚠️ The step that determines whether the building actually works as designed, and the\nstep that gets compressed when the programme slips.**\n**⚠️ Commissioning**: **testing and balancing, controls verification, ⚠️ integrated systems\ntesting, and ⚠️ seasonal commissioning (a system tuned in October has not been proven in\nJuly).**\n**⚠️ Handover**: **O&M manuals, as-built information, training the facilities team,\nwarranties, spares.** ⚠️ **Handover documentation quality is chronically poor, and the\noperator inherits the consequences.**\n**⚠️ Soft landings** — ⚠️ **the designer and contractor remain involved after occupation to\ntune the building and close the performance gap** (§12 → `building-accessibility-energy-drawings-bim-and-codes`). **⚠️ It works and it is\nfrequently cut.**\n**⚠️ Post-occupancy evaluation** is ⚠️ **the industry's most obvious missing feedback loop:\nbuildings are rarely measured against their design intent, so the same mistakes recur.**\n\n---\n\n## §22. Existing Buildings and Retrofit\n\n**⚠️ Most of the buildings that will exist in 2050 already exist, which makes this the\nlarger part of the work.**\n**⚠️ Survey and assessment**: ⚠️ **measured survey, structural appraisal, material testing,\n⚠️ and hazardous materials (asbestos, lead paint) surveys BEFORE any work.**\n**⚠️ The recurring retrofit hazards**: ⚠️ **unknown structure behind finishes; original\ndrawings that don't match reality; load path changes from previous alterations nobody\nrecorded; and ⚠️ CHANGING THE MOISTURE BEHAVIOUR of a historic assembly by insulating it,\nwhich can cause rot in a wall that survived a century** (§8 → `building-structure-foundations-envelope-services-and-fire`).\n**⚠️ Heritage constraints** limit intervention and demand reversibility.\n**⚠️ Adaptive reuse and the carbon argument** — ⚠️ **retaining structure avoids the embodied\ncarbon of replacement, which is now a regulated consideration in some jurisdictions**\n(§24.2 → `building-reference`).\n\n---\n\n## §23. ⚠️ Why Projects Fail\n\n```\n⚠️ COORDINATION FAILURES AT BOUNDARIES  ⚠️ between disciplines,\n   between design and construction, between contractor and\n   specialist designer. ⚠️ The largest single category\n⚠️ INADEQUATE SITE INVESTIGATION (§2)\n⚠️ SCOPE CREEP and late changes (§1's cost-influence curve)\n⚠️ OPTIMISM BIAS in cost and programme (see a civil\u002Findustrial\n   reference for the base rates)\n⚠️ INCOMPLETE DOCUMENTATION → RFIs, delays, claims (§13)\n⚠️ RISK ALLOCATED TO PARTIES WHO CANNOT CARRY IT (§15)\n⚠️ COMPRESSED COMMISSIONING (§21)\n⚠️ THE HYATT REGENCY PATTERN  ⚠️ a change that looks like a detail\n   silently invalidates the original analysis, and nobody re-derives it\n```\n**⚠️ What correlates with projects going well**: ⚠️ **early contractor and specialist\ninvolvement, a stable brief, adequate design fees and time (⚠️ under-resourced design is\nfalse economy that shows up as construction cost), realistic programmes, and genuine\nearly-warning culture rather than retrospective claims.**\n","# Buildings and Civil Structures: Site Safety, Commissioning and Handover, Existing Buildings and Retrofit, and Why Projects Fail\n\n> **Part 5 of 6** of the *Designing and Building Buildings and Other Civil Structures* reference (plugin `designing-and-building-buildings`), covering §20–§23. Sibling skills: `building-disciplines-site-brief-planning-and-design` (§0–§5), `building-structure-foundations-envelope-services-and-fire` (§6–§10), `building-accessibility-energy-drawings-bim-and-codes` (§11–§14), `building-procurement-cost-sequencing-materials-and-quality` (§15–§19), `building-reference` (§24–§29). Section numbers are shared across the set; a reference written as §N → `skill` points into that sibling skill.\n>\n> **Currency:** The engineering is settled. Two areas moved. See §24 → `building-reference` for tall mass timber code adoption, and embodied carbon regulation.\n\n> **⚠️ The practice companion to a civil\u002Findustrial engineering reference.** ⚠️ **That one\n> translates concepts for outsiders — factor of safety, codes as accumulated failure logs,\n> the megaproject estimation record.** **This one is how the work is actually done.**\n>\n> **⚠️ The organizing reality: a building is a MULTI-DISCIPLINARY SYSTEM delivered by\n> parties with different contracts, different liabilities and different incentives.**\n> ⚠️ **Most building failures are not engineering failures — they are COORDINATION\n> failures at the boundaries between disciplines and between design and construction**\n> (§23).\n>\n> **⚠️ GOTCHA** boxes mark the assumptions that cause litigation.\n>\n> **⚠️ Scope note**: ⚠️ **structural, fire and geotechnical design are licensed activities\n> in most jurisdictions for good reason. This is a map of the territory, not a\n> substitute for a qualified engineer or a local code review.**\n>\n> **The three ideas that organize this document:**\n> 1. **⚠️ Design decisions bind cost early and irreversibly** (§1 → `building-disciplines-site-brief-planning-and-design`, §16 → `building-procurement-cost-sequencing-materials-and-quality`). **Most of a\n>    building's cost and carbon are committed during concept design, when almost nothing\n>    has been spent.**\n> 2. **⚠️ WATER destroys more buildings than structural failure** (§8 → `building-structure-foundations-envelope-services-and-fire`). **Envelope and\n>    moisture management cause the overwhelming majority of building defects, claims and\n>    premature failures — and they are the least glamorous part of the job.**\n> 3. **⚠️ Load paths and lateral systems are the two things a structure is** (§6 → `building-structure-foundations-envelope-services-and-fire`).\n>    **Gravity is the obvious problem; wind and seismic are the ones that govern.**\n\n---\n\n## §20. Site Safety\n\n**⚠️ Construction has a disproportionate share of workplace fatalities, and the causes are\nconcentrated and well known.**\n```\n⚠️ THE RECURRING FATAL FOUR  ⚠️ FALLS FROM HEIGHT (the largest by far) ·\n   struck-by · caught-in\u002Fbetween · electrocution\n⚠️ ALSO  ⚠️ excavation collapse (⚠️ a cubic metre of soil weighs\n   well over a tonne, and unshored trenches kill quickly) ·\n   confined spaces · lifting operations · ⚠️ silica dust and\n   asbestos (⚠️ long-latency, and the biggest killer by total\n   deaths in some jurisdictions)\n⚠️ THE CONTROLS  design out the hazard first (⚠️ prevention through\n   design \u002F CDM Regulations make this a DESIGNER duty in some\n   jurisdictions) → engineering controls → then PPE\n```\n**⚠️ The designer's role is real**: ⚠️ **specifying a detail that can only be installed by\nsomeone working at height on a ladder is a design decision with a safety consequence.**\n\n---\n\n## §21. Commissioning and Handover\n\n**⚠️ The step that determines whether the building actually works as designed, and the\nstep that gets compressed when the programme slips.**\n**⚠️ Commissioning**: **testing and balancing, controls verification, ⚠️ integrated systems\ntesting, and ⚠️ seasonal commissioning (a system tuned in October has not been proven in\nJuly).**\n**⚠️ Handover**: **O&M manuals, as-built information, training the facilities team,\nwarranties, spares.** ⚠️ **Handover documentation quality is chronically poor, and the\noperator inherits the consequences.**\n**⚠️ Soft landings** — ⚠️ **the designer and contractor remain involved after occupation to\ntune the building and close the performance gap** (§12 → `building-accessibility-energy-drawings-bim-and-codes`). **⚠️ It works and it is\nfrequently cut.**\n**⚠️ Post-occupancy evaluation** is ⚠️ **the industry's most obvious missing feedback loop:\nbuildings are rarely measured against their design intent, so the same mistakes recur.**\n\n---\n\n## §22. Existing Buildings and Retrofit\n\n**⚠️ Most of the buildings that will exist in 2050 already exist, which makes this the\nlarger part of the work.**\n**⚠️ Survey and assessment**: ⚠️ **measured survey, structural appraisal, material testing,\n⚠️ and hazardous materials (asbestos, lead paint) surveys BEFORE any work.**\n**⚠️ The recurring retrofit hazards**: ⚠️ **unknown structure behind finishes; original\ndrawings that don't match reality; load path changes from previous alterations nobody\nrecorded; and ⚠️ CHANGING THE MOISTURE BEHAVIOUR of a historic assembly by insulating it,\nwhich can cause rot in a wall that survived a century** (§8 → `building-structure-foundations-envelope-services-and-fire`).\n**⚠️ Heritage constraints** limit intervention and demand reversibility.\n**⚠️ Adaptive reuse and the carbon argument** — ⚠️ **retaining structure avoids the embodied\ncarbon of replacement, which is now a regulated consideration in some jurisdictions**\n(§24.2 → `building-reference`).\n\n---\n\n## §23. ⚠️ Why Projects Fail\n\n```\n⚠️ COORDINATION FAILURES AT BOUNDARIES  ⚠️ between disciplines,\n   between design and construction, between contractor and\n   specialist designer. ⚠️ The largest single category\n⚠️ INADEQUATE SITE INVESTIGATION (§2)\n⚠️ SCOPE CREEP and late changes (§1's cost-influence curve)\n⚠️ OPTIMISM BIAS in cost and programme (see a civil\u002Findustrial\n   reference for the base rates)\n⚠️ INCOMPLETE DOCUMENTATION → RFIs, delays, claims (§13)\n⚠️ RISK ALLOCATED TO PARTIES WHO CANNOT CARRY IT (§15)\n⚠️ COMPRESSED COMMISSIONING (§21)\n⚠️ THE HYATT REGENCY PATTERN  ⚠️ a change that looks like a detail\n   silently invalidates the original analysis, and nobody re-derives it\n```\n**⚠️ What correlates with projects going well**: ⚠️ **early contractor and specialist\ninvolvement, a stable brief, adequate design fees and time (⚠️ under-resourced design is\nfalse economy that shows up as construction cost), realistic programmes, and genuine\nearly-warning culture rather than retrospective claims.**\n",{"name":5,"description":7},"develop","ae32736a1aabddabca5d2c96d665aa0ebc7d8700","src\u002Fvibey_tools\u002Fskills\u002Fplugins\u002Fdesigning-and-building-buildings\u002Fskills\u002Fbuilding-site-safety-commissioning-retrofit-and-why-projects-fail",3,"https:\u002F\u002Fgithub.com\u002Fthe-vibey-project\u002Fvibey","https:\u002F\u002Fthe-vibey-project.github.io\u002Fvibey\u002F","https:\u002F\u002Fgithub.com\u002Fthe-vibey-project","https:\u002F\u002Fvibewithadam.matthewsteinberger.com","freedom for software engineers","2026-11-15 05:47:42",{"source":8,"skillName":5,"commands":35,"prompt":45,"zipAvailable":46},[36,39,42],{"tool":37,"command":38},"npx","npx skills add the-vibey-project\u002Fvibey --skill building-site-safety-commissioning-retrofit-and-why-projects-fail",{"tool":40,"command":41},"bunx","bunx skills add the-vibey-project\u002Fvibey --skill building-site-safety-commissioning-retrofit-and-why-projects-fail",{"tool":43,"command":44},"pnpm","pnpm dlx skills add the-vibey-project\u002Fvibey --skill building-site-safety-commissioning-retrofit-and-why-projects-fail","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002Fthe-vibey-project\u002Fvibey\u002Fblob\u002Fdevelop\u002Fsrc\u002Fvibey_tools\u002Fskills\u002Fplugins\u002Fdesigning-and-building-buildings\u002Fskills\u002Fbuilding-site-safety-commissioning-retrofit-and-why-projects-fail\u002FSKILL.md",true,[],[49,56,63,70,77,84],{"skillNo":50,"name":51,"nameZh":6,"description":52,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":53,"categories":54,"keywords":55,"publishedAt":19},"01M7AT1FQJAE1FQYAMDTF490Y4","white-paper-writing","Use when writing white papers, technical reports, policy documents, thought leadership pieces, or any long-form authoritative document. Triggers on requests to write, structure, outline, or review white papers, technical reports, position papers, policy briefs, or evidence-driven arguments. Also use for B2B content marketing strategy, technical documentation requiring authority, academic-style reports, or any document that must educate while persuading. Use when someone asks \"how should I structure this\" for a long-form document.","https:\u002F\u002Fgithub.com\u002Fthe-vibey-project\u002Fvibey\u002Fblob\u002Fdevelop\u002Fsrc\u002Fvibey_tools\u002Fskills\u002Fplugins\u002Fwriting-craft\u002Fskills\u002Fwhite-paper-writing\u002FSKILL.md",[],[],{"skillNo":57,"name":58,"nameZh":6,"description":59,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":60,"categories":61,"keywords":62,"publishedAt":19},"01M7AT16BJRJJKK2MASXRZS76G","prose-technical-mechanics","Use when editing or writing prose at a technical\u002Fmechanical level: choosing between Anglo-Saxon and Latinate diction, placing information in topic vs stress positions, writing periodic vs cumulative sentences, handling sentence rhythm, punctuation as logic, transitions, paragraph structure, or phonesthetics. Use when someone wants to understand WHY prose works or doesn't, not just surface-level style advice. Triggers on word choice, sentence structure, emphasis, rhythm, diction, or any deep writing mechanics question.","https:\u002F\u002Fgithub.com\u002Fthe-vibey-project\u002Fvibey\u002Fblob\u002Fdevelop\u002Fsrc\u002Fvibey_tools\u002Fskills\u002Fplugins\u002Fwriting-craft\u002Fskills\u002Fprose-technical-mechanics\u002FSKILL.md",[],[],{"skillNo":64,"name":65,"nameZh":6,"description":66,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":67,"categories":68,"keywords":69,"publishedAt":19},"01M7AT0W9HT0ZZ9Y287NW99MR3","prose-mechanics","Use when writing, editing, or analyzing prose style; when trying to avoid generic AI-sounding writing; when applying specific prose styles such as journalistic, academic, narrative, KJV biblical, Hemingway plain, Latinate\u002FJamesian, Orwellian, Augustan, Victorian, Early Modern (Bacon, Browne, Milton), or free indirect discourse; or when coaching someone on writing voice and mechanics. Triggers on any request to improve, analyze, or write in a specific prose style, to fix \"AI-sounding\" writing, to make prose more vivid or concrete, to vary sentence rhythm, or to understand how a particular writer achieves their effects.","https:\u002F\u002Fgithub.com\u002Fthe-vibey-project\u002Fvibey\u002Fblob\u002Fdevelop\u002Fsrc\u002Fvibey_tools\u002Fskills\u002Fplugins\u002Fwriting-craft\u002Fskills\u002Fprose-mechanics\u002FSKILL.md",[],[],{"skillNo":71,"name":72,"nameZh":6,"description":73,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":74,"categories":75,"keywords":76,"publishedAt":19},"01M7AT0KR635JX66X2X6F3E2CP","narrative-structure","Use when structuring stories, pitches, presentations, white papers, or any persuasive narrative; analyzing the hero's journey in fiction or non-fiction; applying StoryBrand for business communication; designing narrative arcs for thought leadership; or understanding Vogler, Snyder, Propp, or Campbell frameworks. Triggers on any narrative structure, storytelling, pitch structure, StoryBrand, hero's journey, three-act structure, Freytag, Save the Cat, narrative arc, or \"how should I structure this story\u002Fpitch\u002Fpresentation\" request.","https:\u002F\u002Fgithub.com\u002Fthe-vibey-project\u002Fvibey\u002Fblob\u002Fdevelop\u002Fsrc\u002Fvibey_tools\u002Fskills\u002Fplugins\u002Fwriting-craft\u002Fskills\u002Fnarrative-structure\u002FSKILL.md",[],[],{"skillNo":78,"name":79,"nameZh":6,"description":80,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":81,"categories":82,"keywords":83,"publishedAt":19},"01M7AT0AKGW09NKKZDYBT8VRDE","legal-brief-writing","Use when writing legal briefs, motions, or any court filing; when analyzing judicial cognition and persuasion; when applying elite brief-writing techniques from Roberts, Clement, Kagan, Garner; or when structuring legal arguments for maximum persuasion. Also use for autistic\u002Fneurodivergent advocates who need to understand how their natural communication style maps to elite legal advocacy. Triggers on any legal writing, brief drafting, motion preparation, or legal argument structuring request.","https:\u002F\u002Fgithub.com\u002Fthe-vibey-project\u002Fvibey\u002Fblob\u002Fdevelop\u002Fsrc\u002Fvibey_tools\u002Fskills\u002Fplugins\u002Fwriting-craft\u002Fskills\u002Flegal-brief-writing\u002FSKILL.md",[],[],{"skillNo":85,"name":86,"nameZh":6,"description":87,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":88,"categories":89,"keywords":90,"publishedAt":19},"01M7AT00VWPS4Q8B5VEMXX9NQT","journal-publishability-criteria","Use whenever a research paper, article or preprint is being written, revised, reviewed or published, and specifically before every publication of docs\u002Fpaper.md. Covers what legitimate journals actually gate on, in order of gating — the editor's desk screen (scope, novelty, package problems), what reviewers judge (methodological soundness, claims the evidence can carry, statistical and qualitative reporting), EQUATOR reporting guidelines, the ICMJE authorship criteria, COPE's view of text recycling, the near-universal generative-AI policy (no AI author, disclosure, author responsibility), TOP 2025 transparency standards, how to verify a journal is legitimate, submitting without an institution, and a pre-submission checklist. Triggers on requests to evaluate, review, prepare or submit a paper, to judge publishability, to write a declarations or data-availability section, to disclose AI use, or to check a journal.","https:\u002F\u002Fgithub.com\u002Fthe-vibey-project\u002Fvibey\u002Fblob\u002Fdevelop\u002Fsrc\u002Fvibey_tools\u002Fskills\u002Fplugins\u002Fwriting-craft\u002Fskills\u002Fjournal-publishability-criteria\u002FSKILL.md",[],[]]