01 前言 Front Matter

name
sb-contract-review
description
Judge whether the milestone's changes leave every persistent seam in the project coherent, and accept the one contract review that Tasks authoring waits on.

03 SKILL.md 正文

Review the contract graph

Apply project language style

Before authoring any artifact or user-facing prose, read:

specbind rule read language-style --for consume

Apply returned policy only to natural-language prose. NO_CHANGE RULE_ABSENT means no additional project preference; any ERROR line stops the workflow.

One review per milestone, between design approval and any new or revised Tasks gate, or between reverse Design approval and adoption finalization. The question is not "do the Specs in this milestone agree with each other." It is:

Does this milestone leave every persistent seam in the project coherent — including seams owned by Specs it never touched?

A Spec outside the milestone is the consumer most likely to break, precisely because nobody is looking at it.

You accept one artifact. You author no Spec artifact and change no Spec's state.

1. Check that the review can run

specbind milestone review status
specbind milestone status
specbind milestone scope

Stop and report, rather than fixing, in these cases:

  • Status: not_applicable — a Direct-only milestone without shared agreement changes has no required review. Say that the review is not required and stop.
  • A participant is not ready — use the reported Milestone kind. Delivery acceptance needs every Spec-backed item to hold a fresh Design gate and be in tasks, implementation, or release_ready; reverse acceptance needs the same fresh gate and adoption_ready, with no Tasks. Route any other state to its phase. Never approve a gate to make this barrier passable.

A delivery participant may retain tasks.yaml, including execution progress, from work approved against the previous review. That file is not a review input: do not read, validate, edit, move, or delete it. Its presence does not weaken or block this judgment. Affected Tasks are reviewed and repaired by their owner only after this Contract Review is accepted. Unaffected later-state participants keep their current Tasks gate and progress.

milestone scope gives you the complete current scope. For every Spec-backed participant it names, also run:

specbind spec status <spec>

milestone status gives you the two revisions you need:

  Revision: <current HEAD>
  Baseline: <what this milestone is measured against>

2. Establish what changed

specbind schema read contract/v1
specbind protocol read contract-review
specbind contract diff --baseline <baseline> --json

Also read specbind contract shared read and specbind contract shared consumers; use specbind schema read contract/v2 and specbind schema read shared-contract/v1 for their structures. Compare the shared manifest at the baseline, including its creation/deletion, with scoped sharedContractChanges and the complete Roadmap body. A planned shared change requires review even with no Spec-backed participant. Shared resource use is not co-ownership; normal catalog values are implementation, not agreement edits. Shared rules are reviewed here, never executed as shell instructions. Route delivery shared agreement findings to sb-plan --shared, and affected Spec work to its Design owner. In reverse establishment, read the confirmed proposal in <specDir>/adoption/reverse-discovery.yaml for shared scope instead of delivery Direct fields; return findings to the owning sb-adopt continuation within that confirmed scope. Do not invent a shared Spec or accept unscoped changes.

Read every current Contract in the project, not only the participants':

specbind spec list
specbind artifact read <spec> contract --for consume

Use the diff's documents (complete normalized before/after manifests and exact paths), changed entries, baselineConsumers, and currentConsumers as the comparison input. The CLI compares the complete persistent Spec set and optional shared Contract, including baseline-only Specs and empty-manifest creation or removal. It distinguishes a genuinely new Spec from a missing required Contract. Do not reconstruct this comparison with git show or infer artifact identity.

The baseline must be the Milestone's reported baseline, not a convenient newer commit. currentRevision identifies HEAD; currentSource: worktree includes uncommitted proposals, and currentFingerprint identifies the compared inputs. An input error stops the review without a fallback comparison. Rerun and reassess if HEAD or Contract inputs change during review.

The diff reports reference errors as diagnostics so removed targets still name their consumers. Those errors are findings, not permission to accept. Also run:

specbind check contracts

Use its complete current-graph diagnostics with the diff to route findings below. An exit-zero diff is evidence that comparison succeeded, never a review verdict. Consumer lists contain declared direct managed references on each side only; external consumers and semantic impact still require your judgment.

The difference is the entry point. A run that never established what changed has not performed the review, however carefully it read the current graph.

The Roadmap scope is the second half of that comparison. Match each participant's scoped behavior to the current Contract even when its Contract diff is empty. A new owned boundary, exported behavior, consumed seam, invariant, or file-ownership claim that appears in scope but nowhere in the Contract is a finding, not proof that the seam stayed unchanged.

Read the project's seam policy through its project-owned rule surface:

specbind rule read contract-principles --for consume

It covers shared ownership, compatibility posture, generated boundaries, and dependency direction. NO_CHANGE RULE_ABSENT means no customization; the protocol still applies. Any ERROR line stops the review.

Do not read steering here. Whether a design followed project guidance belongs to the design phase and to sb-validate-design. Your question is whether the graph is coherent against itself and its consumers.

3. Judge

The protocol owns the judgment. For each changed, added, or removed entry, establish who depends on it and what the change does to them.

For an unchanged Contract, establish that the scoped behavior introduces no missing persistent seam or guarantee. If scope suggests one, go deeper into the relevant Requirements or Design and declare that artifact in deepInputs. Do not accept merely because there is no Contract diff; leave the omission for the owning Design phase to resolve.

Two things the CLI cannot do for you:

Ownership overlaps and dependency cycles are warnings, because they are sometimes deliberate. Say why the overlap is acceptable, or treat it as a finding. Reporting the warning back is not a judgment.

External consumers. A published interface, another repository, a stored data shape, an operational contract — none of these are Specs, and nothing will detect the impact. Name the affected consumer, state the impact, and bring it to the user when the change requires a decision they own.

Do not ask the user to repeat a decision already explicit in the delivery request. If the requested behavior itself changes an exported seam, repository evidence finds no managed consumer, and no external consumer is identified by the project, record the possible unmanaged impact and the user's requested disposition in the assessment. Likewise, a request that directly uses or changes an existing unconsumed export is evidence to keep that seam for this milestone. Ask only when the impact introduces a choice the request did not settle.

Silence here is the one finding with no downstream check that might catch it.

Go deeper only when the conclusion depends on it

When the Contract difference and the current graph settle the question, that is the complete review. Reading Requirements or Design is for when they do not.

Discover the Spec's artifact selectors before a deep read; never shorten design/<artifact-id> to a guessed design selector:

specbind artifact list <spec>
specbind artifact read <spec> requirements --for consume
specbind artifact read <spec> design/<artifact-id> --for consume

Run the listing before constructing any Design selector and use only the exact selectors it reports. Lifecycle states and action labels such as tasks and implementation are not artifact IDs; never turn them into design/tasks or design/implementation.

Read only the Requirements or listed Designs the conclusion needs.

For deepInputs, prefix the exact logical selector reported by artifact list with specs/<canonical-spec>#. Thus requirements becomes specs/<spec>#requirements, and design/main becomes specs/<spec>#design/main. Do not use the reported filesystem path, shorten a Design selector, or derive a selector from lifecycle state.

Declare in deepInputs only what the judgment actually relied on. Every declared input is fingerprinted into the accepted artifact, so it becomes a freshness input: editing it later makes the review stale and blocks tasks approval, implementation validation, and release preflight. A file declared because you opened it buys recurring invalidation for nothing.

Task plans are never inputs, and the CLI rejects them.

4. Remediate, at most twice

When dispatched with explicit Drive replan authority, report in-scope Design/Contract findings to the sb-plan recovery owner with the affected Specs and exact rewind cost. That owner handles retained Tasks after this barrier, Design validation, and return to this review without another user confirmation. Do not delete plans or invalidate gates in the review dispatch. Carry the finding history and remaining two-round budget back; recovery never resets it. Requirements or Milestone scope changes and unsettled external consequences remain user decisions. The explicit-confirmation instructions below apply outside that delegated recovery.

If the review does not pass, you may remediate and rerun at most two rounds. After that, the affected Specs stay in design, no artifact is written, and you report what is unresolved.

You do not author another phase's artifacts or mutate its state, except for the proven Design-rewind handoff below. Where a Spec needs owned work:

  • present the affected Spec and what is wrong with the seam;
  • before every gate invalidation, present the exact Requirements, Design, Tasks, completion, and accepted Contract Review state that the rewind removes, then obtain explicit user confirmation even when milestone scope is unchanged;
  • name the owning phase and transfer the complete finding and authority described below rather than editing an artifact or lifecycle file.

A Spec added to scope must be brought through design before acceptance. It cannot be left as follow-up behind a passing review: the accepted artifact has no field a caveat could live in.

Never edit another Spec's contract to make the graph resolve.

The Design phase owns both the Design set and contract.yaml; status has no separate Contract gate. If Requirements remain valid and the finding requires a Design or Contract change, present the complete rewind cost, obtain explicit confirmation, run specbind spec design invalidate <spec>, and hand the work to sb-plan in explicit Design-phase mode. Never leave the maintainer to infer the owning phase from the gate list.

For that Design invalidation handoff, record git status --short before the command and require the target spec.yaml and accepted-review path to be unchanged. Immediately after success, capture specbind spec status <spec>, the exact lifecycle changed-path set, and its Git diff. Pass those paths and diff to sb-plan as the Design-rewind delta. Do not edit, discard, stash, or commit it separately; the Design approval checkpoint closes it after independent validation. Any pre-existing or later-mismatched lifecycle delta is not phase-owned.

A response that stops on this finding is incomplete unless it names the Design phase as owner, enumerates the current state that invalidation removes, and gives the exact specbind spec design invalidate <spec> operation before asking for confirmation. Include those facts in the reported outcome even when no file or state changed during the review.

If Requirements must change, present the complete Requirements rewind cost and obtain explicit confirmation, but do not invoke specbind spec requirements invalidate <spec>. Dispatch sb-plan in explicit Requirements-phase mode with the exact finding, target Spec, exact command, and the user's operation-specific confirmation. That relayed confirmation authorizes the Requirements receiver to invoke that one command in the current state; it is not general delegation and expires if the finding, state, or rewind cost changes. The Requirements phase owns the invalidation, repair, approval, and one coherent checkpoint containing every path it produced. Carry this review's finding ledger and remaining remediation budget through the handoff, then resume review only after the normal Plan route returns all participants to current Design approval.

If the finding changes milestone scope, produce a complete scope-remediation proposal and route it to sb-discovery. Do not invoke specbind milestone update-scope from Contract Review. Discovery owns its normal scope confirmation, the complete replacement, any lifecycle invalidations, every new or changed Brief, and its checkpoint. Plan is a later, separately authorized route for affected Specs. Resume Contract Review only after the updated complete participant set reaches current Design approval. Never remove completed Direct items, retained Tasks, or another Spec's progress to make the proposal fit.

5. Write the assessment and accept

The assessment is the durable explanation. Write it so a reader who did not participate can tell what was examined and why the conclusion holds: what changed in the graph relative to the baseline, who depends on each change, and why the seams are coherent.

A short assessment is often the correct one. One participating Spec whose Contract is unchanged is a complete review only after the scoped behavior has been checked for a missing persistent seam or guarantee. When none is missing, the review answered the same question and the answer was brief. Padding it produces a record whose length implies scrutiny that did not happen.

Present the assessment and any findings before you accept.

specbind milestone review accept --candidate -

The candidate is strict JSON on stdin:

{
  "schemaVersion": 1,
  "assessment": "...Markdown...",
  "deepInputs": ["specs/checkout#design/main"]
}

deepInputs may be empty. Selectors are canonical requirements or design artifacts only. The CLI resolves every path, computes every fingerprint, and owns the timestamp — never supply your own.

On authority

Acceptance takes no approval mode, and that is deliberate rather than an oversight. The accepted artifact records type, milestone_id, passed_at, and input_revisions — there is no field for a user's approval, so this is your judgment being recorded, not their authorization.

That is not licence to accept quietly. Present your reasoning first, and stop for the user whenever a finding needs a decision they own — external consumer impact, or a scope change.

There is no partial, conditional, or provisional acceptance. An unresolved finding means the review has not passed. Accepting anyway records a judgment that was not made, and every later boundary will trust it.

6. Checkpoint

Only after acceptance succeeds is this work eligible to commit.

specbind adapter read git --for consume

NO_CHANGE ADAPTER_ABSENT or NO_CHANGE ADAPTER_SCAFFOLD means there is no adapter-directed commit. Stop there — that is an answer, not a missing file to work around.

When the adapter has guidance, follow it. The request to perform this mutating phase authorizes the adapter's narrow local checkpoint as its ordinary final step. It does not authorize anything broader:

  • An explicit user or root instruction that forbids commits wins, and tool permissions still apply.
  • Commit guidance is not push guidance. Push only where the adapter says to, and never force-push, rewrite history, or bypass a protected branch.
  • Stage only the paths this run produced. Unrelated work already in the worktree is left exactly as it is.
  • Stop before the Git operation if the guidance is ambiguous, unsafe, or conflicts with something else you were told.

A failed checkpoint does not undo the acceptance. Report the work as uncommitted and continue.

Boundaries

  • Author no Spec artifact. Requirements, design, and contracts belong to their phases; tasks.yaml belongs to the phase after this one.
  • Write no machine state. Never edit spec.yaml or the roadmap directly.
  • Never read, delete, or repair a delivery task plan, and never approve or invalidate a gate to make this barrier passable. Invalidation happens only as the explicitly user-confirmed outcome of a finding after its complete rewind cost was presented.
  • Report in the project's language: what changed in the graph, who is affected, what you concluded, anything you brought to the user, whether the review was accepted, and what runs next.

04 同仓库更多 Skills