[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M7AF1BCT3GCWP3KTWFGX6HBZ":3,"skill-same:01M7AF1BCT3GCWP3KTWFGX6HBZ":46},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":16,"categories":17,"keywords":18,"publishedAt":19,"linkOnly":20,"markdownContent":21,"markdownBody":22,"frontMatter":23,"refName":24,"commitSha":25,"skillDirectory":26,"forksCount":14,"repositoryHtmlUrl":27,"repositoryHomepageUrl":6,"ownerHtmlUrl":28,"ownerBlogUrl":29,"ownerDescription":30,"updatedAt":31,"install":32,"resources":45},"01M7AF1BCT3GCWP3KTWFGX6HBZ","process-optimization-skill",null,"Analyse processes for bottlenecks, waste, and improvement opportunities with throughput measurement and prioritised recommendations. Use when a process feels slow, investigating inefficiencies, or preparing a process improvement initiative. Trigger with \"optimise this process\", \"find bottlenecks in\", \"how can we improve\".","innFactory-AI\u002Fcompany-ai-stack-skills","innFactory-AI","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F165681221?v=4","01M7AEC27VD0D1QX2XBX441MDW","innFactory AI","01M7AEC28G25HQ9H9SN58MNV27",0,"MIT","https:\u002F\u002Fgithub.com\u002FinnFactory-AI\u002Fcompany-ai-stack-skills\u002Fblob\u002Fmain\u002Fen\u002Fskills\u002Foperations\u002Fprocess-optimization-skill\u002FSKILL.md",[],[],"2026-11-15 14:19:17",false,"---\nname: process-optimization-skill\ndescription: Analyse processes for bottlenecks, waste, and improvement opportunities with throughput measurement and prioritised recommendations. Use when a process feels slow, investigating inefficiencies, or preparing a process improvement initiative. Trigger with \"optimise this process\", \"find bottlenecks in\", \"how can we improve\".\n---\n\n# Process Optimization Skill\n\nAnalyse processes for bottlenecks and waste, then recommend measurable improvements with prioritised roadmaps. Process data comes from you, a connected MCP source, or companyRAG collections.\n\n## Where the Data Comes From\n\n| Source | What It Adds |\n| --- | --- |\n| **Project \u002F issue tracker via MCP** (e.g. Jira, Asana, Monday) | Processing and elapsed times, status dwell times, volumes, send-backs |\n| **Workflow \u002F CRM system via MCP** (e.g. HubSpot, Salesforce, ServiceNow) | Approval chains, handoffs, SLA data, error and rework rates |\n| **companyRAG collections \u002F file upload** | Process documentation, runbooks, audit logs, time and cost exports |\n\n> **No connected source?** Provide the data in chat or upload the relevant files — the skill works the same way.\n\n## Process Analysis Methodology\n\n### Current State Mapping\n\nBefore optimising, map the process as it actually operates — not as it is documented or intended to operate:\n\n1. Walk the process end-to-end: Document every step, decision point, handoff, wait state, and rework loop as they actually occur.\n2. Identify participants: Who touches the process at each stage — roles, not just departments.\n3. Capture timing: For each step, record processing time (active work) and elapsed time (calendar time including waits). The gap between the two reveals queue time and delays.\n4. Note volumes: How many items flow through the process per period — total and by variant.\n5. Mark pain points: Where do participants report frustration, errors, or workarounds? These are optimisation signals.\n\n### Throughput Measurement\n\nEstablish baseline metrics before recommending changes:\n\n```\nPROCESS BASELINE:\n  Process:            [name]\n  Measurement period: [date range]\n  Volume:             [items processed per period]\n  Cycle time:         [average end-to-end elapsed time]\n  Processing time:    [average active work time per item]\n  Process efficiency: [processing time ÷ cycle time × 100]%\n  Error\u002Frework rate:  [% of items requiring rework or correction]\n  First-pass yield:   [% of items completing correctly on first pass]\n  Cost per item:      [total process cost ÷ volume, if data available]\n```\n\nProcess efficiency ratio reveals how much time is spent on value-adding work versus waiting. A process with 2 hours of active work time and 5 days of cycle time has a process efficiency of approximately 5% — most time is waiting, not working.\n\n## Waste Identification\n\n### Eight Wastes Framework\n\nAdapted from lean methodology for knowledge work and business processes:\n\n| Waste Type | Definition | Process Indicators |\n| --- | --- | --- |\n| **Waiting** | Idle time between steps — queues, approvals, information requests | Items sitting in inboxes, approval backlogs, \"waiting for [person]\" status |\n| **Overprocessing** | Doing more than needed — unnecessary detail, redundant checks, gold-plating | Reports nobody reads, approvals that never reject, data collected but unused |\n| **Rework** | Correcting errors from previous steps | High rejection rates, frequent revision cycles, \"send back\" patterns |\n| **Handoff friction** | Information lost or degraded during transfers between people\u002Fteams | Repeated questions, context re-gathering, \"I didn't know that\" moments |\n| **Motion** | Unnecessary movement between tools, systems, or formats | Copy-pasting between systems, manual data entry, format conversions |\n| **Overproduction** | Producing more output or more frequently than the downstream consumer needs | Batch sizes larger than needed, reports generated more frequently than consumed |\n| **Inventory** | Work items accumulating between steps — work-in-progress buildup | Growing backlogs, aging items, items started but not finished |\n| **Unused talent** | People performing work below their capability, or expertise not leveraged | Senior staff on routine tasks, specialist knowledge not consulted |\n\n### Waste Assessment\n\nFor each identified waste:\n\n```\nWASTE ITEM:\n  Type:          [from eight wastes]\n  Location:      [which step or between which steps]\n  Description:   [what specifically is happening]\n  Frequency:     [how often — every item, occasionally, specific conditions]\n  Impact:        [time, cost, or quality effect per occurrence]\n  Root cause:    [why this waste exists — not just what, but why]\n  Evidence:      [data supporting the assessment — times, volumes, error rates]\n```\n\n## Bottleneck Detection\n\n### Identification Methods\n\nA bottleneck is the step that constrains the throughput of the entire process. The process can only move as fast as its slowest step.\n\n**Method 1 — Queue observation**: The step with the longest queue upstream is likely the bottleneck. Work accumulates before the constraint.\n\n**Method 2 — Utilisation analysis**: The step where resources are most heavily utilised (closest to 100%) is the constraint. Other steps have idle capacity.\n\n**Method 3 — Flow rate comparison**: Measure throughput at each step independently. The step with the lowest throughput rate limits the process.\n\n### Bottleneck Classification\n\n| Type | Cause | Example | Resolution Approach |\n| --- | --- | --- | --- |\n| **Resource bottleneck** | Not enough people, tools, or capacity at the step | Single approver for all requests | Add capacity, redistribute, or reduce demand |\n| **Policy bottleneck** | Rules or requirements that constrain flow unnecessarily | Approval required for items below a reasonable threshold | Challenge the policy — does it still serve its purpose? |\n| **Dependency bottleneck** | Step blocked by external input or upstream delivery | Waiting for third-party data before proceeding | Decouple, parallelize, or pre-fetch the dependency |\n| **Batching bottleneck** | Work held until a batch accumulates before processing | Monthly invoice processing when weekly would flow better | Reduce batch size or process continuously |\n| **Knowledge bottleneck** | Only specific people have the expertise to perform the step | Single subject-matter expert required for every review | Cross-train, document, or redesign to reduce specialisation requirement |\n\n## Improvement Identification\n\n### Improvement Categories\n\n| Category | Description | Typical Impact | Typical Effort |\n| --- | --- | --- | --- |\n| **Eliminate** | Remove the step entirely — it adds no value | High | Low (often just a decision) |\n| **Automate** | Replace manual work with system-driven execution | High | Medium–High |\n| **Simplify** | Reduce complexity — fewer fields, simpler rules, shorter forms | Medium | Low–Medium |\n| **Parallelize** | Run sequential steps simultaneously where no true dependency exists | Medium | Low–Medium |\n| **Reduce batch size** | Process smaller batches more frequently for faster flow | Medium | Low |\n| **Standardise** | Align variations into a single consistent approach | Medium | Medium |\n| **Relocate** | Move the step earlier or later in the process for better flow | Low–Medium | Low |\n\n### Five Whys Root Cause Analysis\n\nFor each significant waste or bottleneck, apply root cause analysis before recommending solutions:\n\n```\nPROBLEM: [symptom observed]\n  Why 1: [first-level cause]\n  Why 2: [cause of the first-level cause]\n  Why 3: [deeper cause]\n  Why 4: [even deeper cause]\n  Why 5: [root cause — the systemic issue to address]\n  Root cause: [summary — this is what needs to change]\n```\n\nStop when you reach a cause that is actionable and systemic. Not every chain goes to five levels; stop when you reach the actionable root.\n\n## Impact Estimation\n\n### Before\u002FAfter Projection\n\nFor each recommended improvement, project the impact:\n\n```\nIMPROVEMENT PROJECTION:\n  Improvement:         [specific change]\n  Addresses:           [which waste\u002Fbottleneck]\n  Current metric:      [baseline from throughput measurement]\n  Projected metric:    [expected value after improvement]\n  Improvement:         [delta and percentage change]\n  Confidence:          [High \u002F Medium \u002F Low — based on data quality]\n  Assumptions:         [what must be true for this projection to hold]\n  Measurement method:  [how you will verify the improvement after implementation]\n```\n\nMark all projections as [AI projection — verify with process data]. Never present projections as certainties.\n\n### Prioritisation Matrix\n\nRank improvements using impact vs. effort:\n\n|  | High Impact | Medium Impact | Low Impact |\n| --- | --- | --- | --- |\n| **Low Effort** | **Do first** — quick wins | **Do second** — easy value | **Consider** — marginal gains |\n| **Medium Effort** | **Plan** — significant projects | **Evaluate** — weigh cost\u002Fbenefit | **Defer** — limited return |\n| **High Effort** | **Strategise** — major investment | **Deprioritise** — poor ratio | **Avoid** — minimal return for high cost |\n\n## Output Template\n\n```\n# Process Optimisation Report — [Process Name]\n\n## Executive Summary\n- Current performance: [key baseline metrics]\n- Primary bottleneck: [the main constraint]\n- Top waste category: [biggest source of waste]\n- Recommended improvements: [count and projected total impact]\n- Quick wins: [improvements achievable within 2 weeks]\n\n## Current State Analysis\n- Process map: [step-by-step current state with timing]\n- Baseline metrics: [throughput measurement results]\n- Process efficiency: [ratio]\n\n## Waste Assessment\n[Waste items with type, location, frequency, impact, root cause]\n\n## Bottleneck Analysis\n[Identified bottlenecks with classification and evidence]\n\n## Improvement Recommendations\n[Prioritised list with impact projections]\n\n## Implementation Roadmap\n- Phase 1 (Quick wins): [low-effort improvements to implement immediately]\n- Phase 2 (Planned): [medium-effort improvements with timeline]\n- Phase 3 (Strategic): [high-effort improvements requiring investment decision]\n\n## Success Metrics\n[How to measure whether the optimisation achieved its goals — re-measure baseline metrics post-implementation]\n\n## Assumptions and Limitations\n[What data was available, what was estimated, what requires validation]\n```\n\n## Guardrails\n\n- Never generate cycle times, throughput rates, or cost figures from training data. All metrics come from the user's process data.\n- Never claim benchmarks. \"Industry benchmark\" and \"best-in-class\" are meaningless without the user's specific context.\n- Never present projections as guaranteed outcomes. All projections are estimates requiring post-implementation measurement.\n- Label generated content: `[From process data]`, `[Framework methodology]`, `[AI projection — verify with process data]`.\n\n> **Tip:** Ask for DOCX, XLSX, or Markdown output via companyFILES to get a formatted optimisation report ready to share.\n","# Process Optimization Skill\n\nAnalyse processes for bottlenecks and waste, then recommend measurable improvements with prioritised roadmaps. Process data comes from you, a connected MCP source, or companyRAG collections.\n\n## Where the Data Comes From\n\n| Source | What It Adds |\n| --- | --- |\n| **Project \u002F issue tracker via MCP** (e.g. Jira, Asana, Monday) | Processing and elapsed times, status dwell times, volumes, send-backs |\n| **Workflow \u002F CRM system via MCP** (e.g. HubSpot, Salesforce, ServiceNow) | Approval chains, handoffs, SLA data, error and rework rates |\n| **companyRAG collections \u002F file upload** | Process documentation, runbooks, audit logs, time and cost exports |\n\n> **No connected source?** Provide the data in chat or upload the relevant files — the skill works the same way.\n\n## Process Analysis Methodology\n\n### Current State Mapping\n\nBefore optimising, map the process as it actually operates — not as it is documented or intended to operate:\n\n1. Walk the process end-to-end: Document every step, decision point, handoff, wait state, and rework loop as they actually occur.\n2. Identify participants: Who touches the process at each stage — roles, not just departments.\n3. Capture timing: For each step, record processing time (active work) and elapsed time (calendar time including waits). The gap between the two reveals queue time and delays.\n4. Note volumes: How many items flow through the process per period — total and by variant.\n5. Mark pain points: Where do participants report frustration, errors, or workarounds? These are optimisation signals.\n\n### Throughput Measurement\n\nEstablish baseline metrics before recommending changes:\n\n```\nPROCESS BASELINE:\n  Process:            [name]\n  Measurement period: [date range]\n  Volume:             [items processed per period]\n  Cycle time:         [average end-to-end elapsed time]\n  Processing time:    [average active work time per item]\n  Process efficiency: [processing time ÷ cycle time × 100]%\n  Error\u002Frework rate:  [% of items requiring rework or correction]\n  First-pass yield:   [% of items completing correctly on first pass]\n  Cost per item:      [total process cost ÷ volume, if data available]\n```\n\nProcess efficiency ratio reveals how much time is spent on value-adding work versus waiting. A process with 2 hours of active work time and 5 days of cycle time has a process efficiency of approximately 5% — most time is waiting, not working.\n\n## Waste Identification\n\n### Eight Wastes Framework\n\nAdapted from lean methodology for knowledge work and business processes:\n\n| Waste Type | Definition | Process Indicators |\n| --- | --- | --- |\n| **Waiting** | Idle time between steps — queues, approvals, information requests | Items sitting in inboxes, approval backlogs, \"waiting for [person]\" status |\n| **Overprocessing** | Doing more than needed — unnecessary detail, redundant checks, gold-plating | Reports nobody reads, approvals that never reject, data collected but unused |\n| **Rework** | Correcting errors from previous steps | High rejection rates, frequent revision cycles, \"send back\" patterns |\n| **Handoff friction** | Information lost or degraded during transfers between people\u002Fteams | Repeated questions, context re-gathering, \"I didn't know that\" moments |\n| **Motion** | Unnecessary movement between tools, systems, or formats | Copy-pasting between systems, manual data entry, format conversions |\n| **Overproduction** | Producing more output or more frequently than the downstream consumer needs | Batch sizes larger than needed, reports generated more frequently than consumed |\n| **Inventory** | Work items accumulating between steps — work-in-progress buildup | Growing backlogs, aging items, items started but not finished |\n| **Unused talent** | People performing work below their capability, or expertise not leveraged | Senior staff on routine tasks, specialist knowledge not consulted |\n\n### Waste Assessment\n\nFor each identified waste:\n\n```\nWASTE ITEM:\n  Type:          [from eight wastes]\n  Location:      [which step or between which steps]\n  Description:   [what specifically is happening]\n  Frequency:     [how often — every item, occasionally, specific conditions]\n  Impact:        [time, cost, or quality effect per occurrence]\n  Root cause:    [why this waste exists — not just what, but why]\n  Evidence:      [data supporting the assessment — times, volumes, error rates]\n```\n\n## Bottleneck Detection\n\n### Identification Methods\n\nA bottleneck is the step that constrains the throughput of the entire process. The process can only move as fast as its slowest step.\n\n**Method 1 — Queue observation**: The step with the longest queue upstream is likely the bottleneck. Work accumulates before the constraint.\n\n**Method 2 — Utilisation analysis**: The step where resources are most heavily utilised (closest to 100%) is the constraint. Other steps have idle capacity.\n\n**Method 3 — Flow rate comparison**: Measure throughput at each step independently. The step with the lowest throughput rate limits the process.\n\n### Bottleneck Classification\n\n| Type | Cause | Example | Resolution Approach |\n| --- | --- | --- | --- |\n| **Resource bottleneck** | Not enough people, tools, or capacity at the step | Single approver for all requests | Add capacity, redistribute, or reduce demand |\n| **Policy bottleneck** | Rules or requirements that constrain flow unnecessarily | Approval required for items below a reasonable threshold | Challenge the policy — does it still serve its purpose? |\n| **Dependency bottleneck** | Step blocked by external input or upstream delivery | Waiting for third-party data before proceeding | Decouple, parallelize, or pre-fetch the dependency |\n| **Batching bottleneck** | Work held until a batch accumulates before processing | Monthly invoice processing when weekly would flow better | Reduce batch size or process continuously |\n| **Knowledge bottleneck** | Only specific people have the expertise to perform the step | Single subject-matter expert required for every review | Cross-train, document, or redesign to reduce specialisation requirement |\n\n## Improvement Identification\n\n### Improvement Categories\n\n| Category | Description | Typical Impact | Typical Effort |\n| --- | --- | --- | --- |\n| **Eliminate** | Remove the step entirely — it adds no value | High | Low (often just a decision) |\n| **Automate** | Replace manual work with system-driven execution | High | Medium–High |\n| **Simplify** | Reduce complexity — fewer fields, simpler rules, shorter forms | Medium | Low–Medium |\n| **Parallelize** | Run sequential steps simultaneously where no true dependency exists | Medium | Low–Medium |\n| **Reduce batch size** | Process smaller batches more frequently for faster flow | Medium | Low |\n| **Standardise** | Align variations into a single consistent approach | Medium | Medium |\n| **Relocate** | Move the step earlier or later in the process for better flow | Low–Medium | Low |\n\n### Five Whys Root Cause Analysis\n\nFor each significant waste or bottleneck, apply root cause analysis before recommending solutions:\n\n```\nPROBLEM: [symptom observed]\n  Why 1: [first-level cause]\n  Why 2: [cause of the first-level cause]\n  Why 3: [deeper cause]\n  Why 4: [even deeper cause]\n  Why 5: [root cause — the systemic issue to address]\n  Root cause: [summary — this is what needs to change]\n```\n\nStop when you reach a cause that is actionable and systemic. Not every chain goes to five levels; stop when you reach the actionable root.\n\n## Impact Estimation\n\n### Before\u002FAfter Projection\n\nFor each recommended improvement, project the impact:\n\n```\nIMPROVEMENT PROJECTION:\n  Improvement:         [specific change]\n  Addresses:           [which waste\u002Fbottleneck]\n  Current metric:      [baseline from throughput measurement]\n  Projected metric:    [expected value after improvement]\n  Improvement:         [delta and percentage change]\n  Confidence:          [High \u002F Medium \u002F Low — based on data quality]\n  Assumptions:         [what must be true for this projection to hold]\n  Measurement method:  [how you will verify the improvement after implementation]\n```\n\nMark all projections as [AI projection — verify with process data]. Never present projections as certainties.\n\n### Prioritisation Matrix\n\nRank improvements using impact vs. effort:\n\n|  | High Impact | Medium Impact | Low Impact |\n| --- | --- | --- | --- |\n| **Low Effort** | **Do first** — quick wins | **Do second** — easy value | **Consider** — marginal gains |\n| **Medium Effort** | **Plan** — significant projects | **Evaluate** — weigh cost\u002Fbenefit | **Defer** — limited return |\n| **High Effort** | **Strategise** — major investment | **Deprioritise** — poor ratio | **Avoid** — minimal return for high cost |\n\n## Output Template\n\n```\n# Process Optimisation Report — [Process Name]\n\n## Executive Summary\n- Current performance: [key baseline metrics]\n- Primary bottleneck: [the main constraint]\n- Top waste category: [biggest source of waste]\n- Recommended improvements: [count and projected total impact]\n- Quick wins: [improvements achievable within 2 weeks]\n\n## Current State Analysis\n- Process map: [step-by-step current state with timing]\n- Baseline metrics: [throughput measurement results]\n- Process efficiency: [ratio]\n\n## Waste Assessment\n[Waste items with type, location, frequency, impact, root cause]\n\n## Bottleneck Analysis\n[Identified bottlenecks with classification and evidence]\n\n## Improvement Recommendations\n[Prioritised list with impact projections]\n\n## Implementation Roadmap\n- Phase 1 (Quick wins): [low-effort improvements to implement immediately]\n- Phase 2 (Planned): [medium-effort improvements with timeline]\n- Phase 3 (Strategic): [high-effort improvements requiring investment decision]\n\n## Success Metrics\n[How to measure whether the optimisation achieved its goals — re-measure baseline metrics post-implementation]\n\n## Assumptions and Limitations\n[What data was available, what was estimated, what requires validation]\n```\n\n## Guardrails\n\n- Never generate cycle times, throughput rates, or cost figures from training data. All metrics come from the user's process data.\n- Never claim benchmarks. \"Industry benchmark\" and \"best-in-class\" are meaningless without the user's specific context.\n- Never present projections as guaranteed outcomes. All projections are estimates requiring post-implementation measurement.\n- Label generated content: `[From process data]`, `[Framework methodology]`, `[AI projection — verify with process data]`.\n\n> **Tip:** Ask for DOCX, XLSX, or Markdown output via companyFILES to get a formatted optimisation report ready to share.\n",{"name":5,"description":7},"main","39e0752000720de2d20917bd46c1c5149c4a0221","en\u002Fskills\u002Foperations\u002Fprocess-optimization-skill","https:\u002F\u002Fgithub.com\u002FinnFactory-AI\u002Fcompany-ai-stack-skills","https:\u002F\u002Fgithub.com\u002FinnFactory-AI","https:\u002F\u002Finnfactory.ai","Engineering AI. Enabling Tomorrow.","2026-11-13 19:54:47",{"source":8,"skillName":5,"commands":33,"prompt":43,"zipAvailable":44},[34,37,40],{"tool":35,"command":36},"npx","npx skills add innFactory-AI\u002Fcompany-ai-stack-skills --skill process-optimization-skill",{"tool":38,"command":39},"bunx","bunx skills add innFactory-AI\u002Fcompany-ai-stack-skills --skill process-optimization-skill",{"tool":41,"command":42},"pnpm","pnpm dlx skills add innFactory-AI\u002Fcompany-ai-stack-skills --skill process-optimization-skill","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002FinnFactory-AI\u002Fcompany-ai-stack-skills\u002Fblob\u002Fmain\u002Fen\u002Fskills\u002Foperations\u002Fprocess-optimization-skill\u002FSKILL.md",true,[],[47,54,61,68,75,82],{"skillNo":48,"name":49,"nameZh":6,"description":50,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":51,"categories":52,"keywords":53,"publishedAt":19},"01M7AF4HHK5B987T44HW7BZFVZ","sales-asset-skill","Produce tailored one-pagers, landing pages, case study drafts, and demo narratives personalised to a specific deal and buyer persona. Use when preparing collateral for a specific deal, building leave-behind materials, or customising standard assets for a prospect. Trigger with \"create a one-pager for\", \"sales deck for [deal]\", \"customise this asset for\".","https:\u002F\u002Fgithub.com\u002FinnFactory-AI\u002Fcompany-ai-stack-skills\u002Fblob\u002Fmain\u002Fen\u002Fskills\u002Fsales\u002Fsales-asset-skill\u002FSKILL.md",[],[],{"skillNo":55,"name":56,"nameZh":6,"description":57,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":58,"categories":59,"keywords":60,"publishedAt":19},"01M7AF4D32V0FJE0QGCBZSQ7BW","pipeline-review-skill","Analyse deal health, surface stale or at-risk opportunities, and produce a prioritised weekly action plan. Use when preparing for a pipeline review meeting, assessing forecast accuracy, or identifying stuck deals. Trigger with \"review my pipeline\", \"pipeline health check\", \"deal risk analysis\".","https:\u002F\u002Fgithub.com\u002FinnFactory-AI\u002Fcompany-ai-stack-skills\u002Fblob\u002Fmain\u002Fen\u002Fskills\u002Fsales\u002Fpipeline-review-skill\u002FSKILL.md",[],[],{"skillNo":62,"name":63,"nameZh":6,"description":64,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":65,"categories":66,"keywords":67,"publishedAt":19},"01M7AF48W7G8DMAHRAM125B192","outreach-skill","Research a prospect then draft personalised outreach with research-backed hooks, subject-line variants, and follow-up sequences. Use when cold-emailing a prospect, writing LinkedIn outreach, or building a multi-touch sequence. Trigger with \"draft outreach to [person\u002Fcompany]\", \"write cold email to\", \"outreach sequence for\".","https:\u002F\u002Fgithub.com\u002FinnFactory-AI\u002Fcompany-ai-stack-skills\u002Fblob\u002Fmain\u002Fen\u002Fskills\u002Fsales\u002Foutreach-skill\u002FSKILL.md",[],[],{"skillNo":69,"name":70,"nameZh":6,"description":71,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":72,"categories":73,"keywords":74,"publishedAt":19},"01M7AF43VKNPQ7G1NTQ4MRH40J","forecast-skill","Build a weighted revenue forecast with risk flags, commit recommendations, and gap-to-quota analysis. Use when preparing for a forecast call, evaluating end-of-quarter projections, or assessing pipeline coverage. Trigger with \"build forecast\", \"forecast for this quarter\", \"where do I stand against quota\".","https:\u002F\u002Fgithub.com\u002FinnFactory-AI\u002Fcompany-ai-stack-skills\u002Fblob\u002Fmain\u002Fen\u002Fskills\u002Fsales\u002Fforecast-skill\u002FSKILL.md",[],[],{"skillNo":76,"name":77,"nameZh":6,"description":78,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":79,"categories":80,"keywords":81,"publishedAt":19},"01M7AF3Z5N61VYSEJRYWXR4JP1","deal-strategy-skill","Map stakeholder power dynamics, surface deal risks, and recommend a step-by-step engagement strategy. Use when entering a complex deal, preparing for an executive sponsor meeting, or diagnosing a stuck opportunity. Trigger with \"plan deal strategy for\", \"stakeholder map\", \"how do I advance this deal\".","https:\u002F\u002Fgithub.com\u002FinnFactory-AI\u002Fcompany-ai-stack-skills\u002Fblob\u002Fmain\u002Fen\u002Fskills\u002Fsales\u002Fdeal-strategy-skill\u002FSKILL.md",[],[],{"skillNo":83,"name":84,"nameZh":6,"description":85,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":86,"categories":87,"keywords":88,"publishedAt":19},"01M7AF3VGG29AX0T2X9WQ5MWDN","call-summary-skill","Extract action items, key topics, and objections from call notes or transcripts and draft a customer-facing follow-up email. Use after a sales call, demo, or discovery session. Trigger with \"summarise this call\", \"call notes from\", \"write follow-up for this meeting\".","https:\u002F\u002Fgithub.com\u002FinnFactory-AI\u002Fcompany-ai-stack-skills\u002Fblob\u002Fmain\u002Fen\u002Fskills\u002Fsales\u002Fcall-summary-skill\u002FSKILL.md",[],[]]