Analyse processes for bottlenecks, waste, and improvement opportunities with throughput measurement and prioritised recommendations. Use when a process feels slow, investigating inefficiencies, or preparing a process improvement initiative. Trigger with "optimise this process", "find bottlenecks in", "how can we improve".
- License 许可
- MIT
- 最近更新
- 2026-11-13
- Stars
- ★ 0
- Forks
- 0
01 前言 Front Matter
- name
- process-optimization-skill
- description
- Analyse processes for bottlenecks, waste, and improvement opportunities with throughput measurement and prioritised recommendations. Use when a process feels slow, investigating inefficiencies, or preparing a process improvement initiative. Trigger with "optimise this process", "find bottlenecks in", "how can we improve".
03 SKILL.md 正文
Process Optimization Skill
Analyse processes for bottlenecks and waste, then recommend measurable improvements with prioritised roadmaps. Process data comes from you, a connected MCP source, or companyRAG collections.
Where the Data Comes From
| Source | What It Adds |
|---|---|
| Project / issue tracker via MCP (e.g. Jira, Asana, Monday) | Processing and elapsed times, status dwell times, volumes, send-backs |
| Workflow / CRM system via MCP (e.g. HubSpot, Salesforce, ServiceNow) | Approval chains, handoffs, SLA data, error and rework rates |
| companyRAG collections / file upload | Process documentation, runbooks, audit logs, time and cost exports |
No connected source? Provide the data in chat or upload the relevant files — the skill works the same way.
Process Analysis Methodology
Current State Mapping
Before optimising, map the process as it actually operates — not as it is documented or intended to operate:
- Walk the process end-to-end: Document every step, decision point, handoff, wait state, and rework loop as they actually occur.
- Identify participants: Who touches the process at each stage — roles, not just departments.
- Capture timing: For each step, record processing time (active work) and elapsed time (calendar time including waits). The gap between the two reveals queue time and delays.
- Note volumes: How many items flow through the process per period — total and by variant.
- Mark pain points: Where do participants report frustration, errors, or workarounds? These are optimisation signals.
Throughput Measurement
Establish baseline metrics before recommending changes:
PROCESS BASELINE:
Process: [name]
Measurement period: [date range]
Volume: [items processed per period]
Cycle time: [average end-to-end elapsed time]
Processing time: [average active work time per item]
Process efficiency: [processing time ÷ cycle time × 100]%
Error/rework rate: [% of items requiring rework or correction]
First-pass yield: [% of items completing correctly on first pass]
Cost per item: [total process cost ÷ volume, if data available]
Process efficiency ratio reveals how much time is spent on value-adding work versus waiting. A process with 2 hours of active work time and 5 days of cycle time has a process efficiency of approximately 5% — most time is waiting, not working.
Waste Identification
Eight Wastes Framework
Adapted from lean methodology for knowledge work and business processes:
| Waste Type | Definition | Process Indicators |
|---|---|---|
| Waiting | Idle time between steps — queues, approvals, information requests | Items sitting in inboxes, approval backlogs, "waiting for [person]" status |
| Overprocessing | Doing more than needed — unnecessary detail, redundant checks, gold-plating | Reports nobody reads, approvals that never reject, data collected but unused |
| Rework | Correcting errors from previous steps | High rejection rates, frequent revision cycles, "send back" patterns |
| Handoff friction | Information lost or degraded during transfers between people/teams | Repeated questions, context re-gathering, "I didn't know that" moments |
| Motion | Unnecessary movement between tools, systems, or formats | Copy-pasting between systems, manual data entry, format conversions |
| Overproduction | Producing more output or more frequently than the downstream consumer needs | Batch sizes larger than needed, reports generated more frequently than consumed |
| Inventory | Work items accumulating between steps — work-in-progress buildup | Growing backlogs, aging items, items started but not finished |
| Unused talent | People performing work below their capability, or expertise not leveraged | Senior staff on routine tasks, specialist knowledge not consulted |
Waste Assessment
For each identified waste:
WASTE ITEM:
Type: [from eight wastes]
Location: [which step or between which steps]
Description: [what specifically is happening]
Frequency: [how often — every item, occasionally, specific conditions]
Impact: [time, cost, or quality effect per occurrence]
Root cause: [why this waste exists — not just what, but why]
Evidence: [data supporting the assessment — times, volumes, error rates]
Bottleneck Detection
Identification Methods
A bottleneck is the step that constrains the throughput of the entire process. The process can only move as fast as its slowest step.
Method 1 — Queue observation: The step with the longest queue upstream is likely the bottleneck. Work accumulates before the constraint.
Method 2 — Utilisation analysis: The step where resources are most heavily utilised (closest to 100%) is the constraint. Other steps have idle capacity.
Method 3 — Flow rate comparison: Measure throughput at each step independently. The step with the lowest throughput rate limits the process.
Bottleneck Classification
| Type | Cause | Example | Resolution Approach |
|---|---|---|---|
| Resource bottleneck | Not enough people, tools, or capacity at the step | Single approver for all requests | Add capacity, redistribute, or reduce demand |
| Policy bottleneck | Rules or requirements that constrain flow unnecessarily | Approval required for items below a reasonable threshold | Challenge the policy — does it still serve its purpose? |
| Dependency bottleneck | Step blocked by external input or upstream delivery | Waiting for third-party data before proceeding | Decouple, parallelize, or pre-fetch the dependency |
| Batching bottleneck | Work held until a batch accumulates before processing | Monthly invoice processing when weekly would flow better | Reduce batch size or process continuously |
| Knowledge bottleneck | Only specific people have the expertise to perform the step | Single subject-matter expert required for every review | Cross-train, document, or redesign to reduce specialisation requirement |
Improvement Identification
Improvement Categories
| Category | Description | Typical Impact | Typical Effort |
|---|---|---|---|
| Eliminate | Remove the step entirely — it adds no value | High | Low (often just a decision) |
| Automate | Replace manual work with system-driven execution | High | Medium–High |
| Simplify | Reduce complexity — fewer fields, simpler rules, shorter forms | Medium | Low–Medium |
| Parallelize | Run sequential steps simultaneously where no true dependency exists | Medium | Low–Medium |
| Reduce batch size | Process smaller batches more frequently for faster flow | Medium | Low |
| Standardise | Align variations into a single consistent approach | Medium | Medium |
| Relocate | Move the step earlier or later in the process for better flow | Low–Medium | Low |
Five Whys Root Cause Analysis
For each significant waste or bottleneck, apply root cause analysis before recommending solutions:
PROBLEM: [symptom observed]
Why 1: [first-level cause]
Why 2: [cause of the first-level cause]
Why 3: [deeper cause]
Why 4: [even deeper cause]
Why 5: [root cause — the systemic issue to address]
Root cause: [summary — this is what needs to change]
Stop when you reach a cause that is actionable and systemic. Not every chain goes to five levels; stop when you reach the actionable root.
Impact Estimation
Before/After Projection
For each recommended improvement, project the impact:
IMPROVEMENT PROJECTION:
Improvement: [specific change]
Addresses: [which waste/bottleneck]
Current metric: [baseline from throughput measurement]
Projected metric: [expected value after improvement]
Improvement: [delta and percentage change]
Confidence: [High / Medium / Low — based on data quality]
Assumptions: [what must be true for this projection to hold]
Measurement method: [how you will verify the improvement after implementation]
Mark all projections as [AI projection — verify with process data]. Never present projections as certainties.
Prioritisation Matrix
Rank improvements using impact vs. effort:
| High Impact | Medium Impact | Low Impact | |
|---|---|---|---|
| Low Effort | Do first — quick wins | Do second — easy value | Consider — marginal gains |
| Medium Effort | Plan — significant projects | Evaluate — weigh cost/benefit | Defer — limited return |
| High Effort | Strategise — major investment | Deprioritise — poor ratio | Avoid — minimal return for high cost |
Output Template
# Process Optimisation Report — [Process Name]
## Executive Summary
- Current performance: [key baseline metrics]
- Primary bottleneck: [the main constraint]
- Top waste category: [biggest source of waste]
- Recommended improvements: [count and projected total impact]
- Quick wins: [improvements achievable within 2 weeks]
## Current State Analysis
- Process map: [step-by-step current state with timing]
- Baseline metrics: [throughput measurement results]
- Process efficiency: [ratio]
## Waste Assessment
[Waste items with type, location, frequency, impact, root cause]
## Bottleneck Analysis
[Identified bottlenecks with classification and evidence]
## Improvement Recommendations
[Prioritised list with impact projections]
## Implementation Roadmap
- Phase 1 (Quick wins): [low-effort improvements to implement immediately]
- Phase 2 (Planned): [medium-effort improvements with timeline]
- Phase 3 (Strategic): [high-effort improvements requiring investment decision]
## Success Metrics
[How to measure whether the optimisation achieved its goals — re-measure baseline metrics post-implementation]
## Assumptions and Limitations
[What data was available, what was estimated, what requires validation]
Guardrails
- Never generate cycle times, throughput rates, or cost figures from training data. All metrics come from the user's process data.
- Never claim benchmarks. "Industry benchmark" and "best-in-class" are meaningless without the user's specific context.
- Never present projections as guaranteed outcomes. All projections are estimates requiring post-implementation measurement.
- Label generated content:
[From process data],[Framework methodology],[AI projection — verify with process data].
Tip: Ask for DOCX, XLSX, or Markdown output via companyFILES to get a formatted optimisation report ready to share.
04 同仓库更多 Skills
sales-asset-skill
Produce tailored one-pagers, landing pages, case study drafts, and demo narratives personalised to a specific deal and buyer persona. Use when preparing collateral for a specific deal, building leave-behind materials, or customising standard assets for a prospect. Trigger with "create a one-pager for", "sales deck for [deal]", "customise this asset for".
pipeline-review-skill
Analyse deal health, surface stale or at-risk opportunities, and produce a prioritised weekly action plan. Use when preparing for a pipeline review meeting, assessing forecast accuracy, or identifying stuck deals. Trigger with "review my pipeline", "pipeline health check", "deal risk analysis".
outreach-skill
Research a prospect then draft personalised outreach with research-backed hooks, subject-line variants, and follow-up sequences. Use when cold-emailing a prospect, writing LinkedIn outreach, or building a multi-touch sequence. Trigger with "draft outreach to [person/company]", "write cold email to", "outreach sequence for".
forecast-skill
Build a weighted revenue forecast with risk flags, commit recommendations, and gap-to-quota analysis. Use when preparing for a forecast call, evaluating end-of-quarter projections, or assessing pipeline coverage. Trigger with "build forecast", "forecast for this quarter", "where do I stand against quota".
deal-strategy-skill
Map stakeholder power dynamics, surface deal risks, and recommend a step-by-step engagement strategy. Use when entering a complex deal, preparing for an executive sponsor meeting, or diagnosing a stuck opportunity. Trigger with "plan deal strategy for", "stakeholder map", "how do I advance this deal".
call-summary-skill
Extract action items, key topics, and objections from call notes or transcripts and draft a customer-facing follow-up email. Use after a sales call, demo, or discovery session. Trigger with "summarise this call", "call notes from", "write follow-up for this meeting".