Runs one pass of the andon hardening loop over this project's value stream (its ordered chain of stages, connected by wires/data-contracts). Use when the user asks to harden the pipeline, run a self-optimization loop, close gaps in a multi-stage codebase, or advance the value stream while keeping every handoff between stages proven. Also use for "andon loop", "wire proof", "andon rule", or "run a pass".

License 许可
MIT
所属仓库
Anselmoo/werkstoff
最近更新
2026-11-02
Stars
★ 1
Forks
0

01 前言 Front Matter

description
Runs one pass of the andon hardening loop over this project's value stream (its ordered chain of stages, connected by wires/data-contracts). Use when the user asks to harden the pipeline, run a self-optimization loop, close gaps in a multi-stage codebase, or advance the value stream while keeping every handoff between stages proven. Also use for "andon loop", "wire proof", "andon rule", or "run a pass".

03 SKILL.md 正文

Andon Loop

A value stream is the ordered chain of stages a project's work passes through (for example: ingest -> transform -> validate -> publish). A wire is the data contract at the boundary between two adjacent stages: what one stage promises to hand the next.

The andon rule: never advance past a wire that has not been proven to hold. If the current stage's outgoing wire is broken or unverified, stop there and report it instead of moving on.

A pass is one traversal of the value stream from its first stage to wherever the andon rule stops it (or to the end, if nothing stops it). A cycle is a converged run of one or more passes: it ends when a full pass finds no more gaps to fix.

Running one pass

  1. Find the value stream. Identify the project's stages and the wire between each adjacent pair. Look for existing documentation of this (architecture docs, a pipeline config, a stage list) before inferring it from the code's own module/package boundaries.

  2. Scan the current stage for gaps. A gap is anything about the current stage or its outgoing wire that falls short of what the next stage requires: a missing field, an unhandled case, absent error handling, a contract violation. List every gap you find in this stage before picking one.

  3. Fix exactly one gap. Pick the highest-priority gap in the current stage and fix it. Do not fix multiple gaps in the same stage before the wire is re-checked — one fix, then verify.

  4. Verify the wire. Before advancing past the stage you just touched, use the andon-wire-verifier agent to check whether the outgoing wire now holds. Give it the wire's contract (what the next stage expects) and the evidence that the fix satisfies it (the changed code, a test result, a reproduction).

  5. Apply the andon rule.

    • If the wire is proven: advance to the next stage and repeat from step 2.
    • If the wire is not proven: stop. Report which wire failed, why, and what would need to change to prove it. Do not advance past it.
  6. Close the pass into a cycle. When a full pass from the first stage reaches the last stage with no gaps found anywhere along the way, the loop has converged: report the cycle as complete. Otherwise, the next invocation of this skill starts a new pass picking up where the last one stopped.

Reporting

After each pass, report:

  • which stage(s) you scanned and what gaps you found in each
  • the one gap you fixed and how
  • the wire-verifier's verdict on the wire you just crossed
  • whether you advanced, and if not, exactly which wire is still broken

04 同仓库更多 Skills