planning
Cut a dev-ready version into an ordered set of implementation phases and write the version plan (docs/handoff/<version>/<version>-plan.md) that each phase's Spec Loop runs over. Use when starting a new version, breaking a version's FRs into phases, or writing/updating a <version>-plan.md - e.g. "plan v0.4", "break v0.4 into phases", "start the v0.4 plan".
- License 许可
- MIT
- 最近更新
- 2026-11-10
- Stars
- ★ 2
- Forks
- 0
01 前言 Front Matter
- name
- planning
- description
- Cut a dev-ready version into an ordered set of implementation phases and write the version plan (docs/handoff/<version>/<version>-plan.md) that each phase's Spec Loop runs over. Use when starting a new version, breaking a version's FRs into phases, or writing/updating a <version>-plan.md - e.g. "plan v0.4", "break v0.4 into phases", "start the v0.4 plan".
03 SKILL.md 正文
dev-ready Version Planner
Produce docs/handoff/<version>/<version>-plan.md: the authoritative breakdown
of a version into ordered phases, written wearing the Tech Lead hat. Each phase's
Spec Loop starts by reading it, so it must name concrete FRs, ADRs,
src/dev_ready/... paths, and acceptance criteria — not intentions.
docs/handoff/ is gitignored (ADR-011) — the plan is a working artifact, not a
committed repo doc. The committed roadmap it draws from is docs/version-plan.md.
Since ADR-021 (internal process v3), each phase is executed through the Spec
Loop and nothing else: grill-with-docs → to-spec (a committed spec in
docs/specs/<version>/) → to-tickets → implement (review included). No gate
documents are generated. The version plan cut here is the map those loops run
over; its phase sections should name the FR each spec will cover.
Inputs to read first
docs/version-plan.md— the roadmap: which FRs belong to this version, the end goal, integration modes, curation principles.docs/requirements.md— the exact FR text for every FR this version claims; copy the FR numbers, do not paraphrase scope.docs/architecture.md+docs/decisions/— the ADRs this version implements or is bound by; Module Boundary and Dependency Rules the phases must respect.docs/cli-spec.md— current vs planned flags/exit codes this version changes.pyproject.toml— the current baseline version (the plan states it explicitly).- The previous version's plan under
docs/handoff/<prev>/— for format and for what was deferred into this version.
How to cut phases
- One phase = one coherent, independently reviewable slice that leaves
mainreleasable-in-principle (tests green), sized to a focused evening. Moofon has limited time; prefer fewer, cohesive phases over many thin ones. - Order by dependency: foundational infrastructure (models, catalog, flags) before the features that consume it. Later phases may depend on earlier ones; never the reverse.
- Exactly one phase per version ships the release, and it is the LAST phase. Its
section must say so and name the version bump (e.g. "bump 0.2.2 → 0.3.0") —
that is what tells the
releaseskill which phases the release covers. - State cross-phase couplings explicitly as "do NOT do X here — phase N owns it", so each phase's spec can carry the exclusion.
What each phase section must contain
Per phase (see the v0.3 plan for the reference shape):
- A title line
## Phase <N> — <summary> (FR-…)and, if done, a— COMPLETED <date>marker naming the commits that closed it. - The concrete change surface: catalog/manifest entries,
src/dev_ready/...files touched, overlay/verify behavior, with VERIFY-AT-IMPLEMENTATION markers for anything that must be checked against a real registry/API at implementation time (name the intent, not an unverified string). - Tests expected (tiers, tmp_path/no-network constraint).
- Acceptance criteria: concrete, checkable generation outcomes.
Standing constraints block
End the plan with a "Standing constraints (binding for every phase)" section:
the hard rules from AGENTS.md restated for this version (pins only in
manifest.json, network only in fetch/, all-or-nothing generation, no-network
unit tests, Conventional Commits, no state-changing git without Moofon's explicit
per-action permission), any "no new runtime dependencies" rule, module-boundary
discipline, explicit out-of-scope items deferred to later versions, and the
four-command phase-end verification (uv sync --dev → uv run pytest →
uv run ruff check . → uv run pytest -m network).
Finish
- Header:
Status: Accepted (<date>). Written wearing the Tech Lead hat (ADR-021). Source of truth for the version's phase cut.plus the scope line (FR range + ADRs) and the ship-as/baseline line. - Tell Moofon the next step: for each phase in order, run the Spec Loop —
grill-with-docs→to-spec(spec accepted before moving on) →to-tickets→implement— starting with Phase 1.
04 同仓库更多 Skills
writing-plans
Use when you have a spec or requirements for a multi-step task, before touching code
webapp-testing
Toolkit for interacting with and testing local web applications using Playwright. Supports verifying frontend functionality, debugging UI behavior, capturing browser screenshots, and viewing browser logs.
verification-before-completion
Use when about to claim work is complete, fixed, or passing, before committing or creating PRs - requires running verification commands and confirming output before making any success claims; evidence before assertions always
using-git-worktrees
Use when starting feature work that needs isolation from current workspace or before executing implementation plans - ensures an isolated workspace exists via native tools or git worktree fallback
to-tickets
Break a plan, spec, or the current conversation into a set of tracer-bullet tickets, each declaring its blocking edges, published to the configured tracker — edges as text in one file per ticket locally, or native blocking links on a real tracker.
to-spec
Turn the current conversation into a spec and publish it to the project issue tracker — no interview, just synthesis of what you've already discussed.