sp-fast
Use when the requested change is truly trivial, local, low risk, and can be completed without entering the full specify-plan workflow.
- License 许可
- MIT
- 最近更新
- 2026-08-07
- Stars
- ★ 0
- Forks
- 0
01 前言 Front Matter
- name
- sp-fast
- metadata
- { "author": "github-spec-kit", "source": "templates/commands/fast.md" }
- description
- Use when the requested change is truly trivial, local, low risk, and can be completed without entering the full specify-plan workflow.
- compatibility
- Requires spec-kit project structure with .specify/ directory
02 资源文件 2
- 参考文档references/INDEX.md597 B
- 参考文档references/semantic-work-contract.md31.7 KB
03 SKILL.md 正文
Invocation Syntax
- In this integration, invoke workflow skills with
$sp-plan-style syntax. - References such as
/sp.plan,/sp.tasks, ornext_command: /sp.planare canonical workflow-state identifiers and handoff values. - Preserve those canonical state tokens exactly in artifacts and workflow state; do not rewrite them to this integration's invocation syntax.
Workflow Contract Summary
- When to use: The work is genuinely local and low-risk enough to stay on the fast path.
- Primary objective: Complete the smallest safe low-risk change directly and run the smallest meaningful verification without opening the full planning workflow.
- Primary outputs: A tightly scoped direct change plus a concise report of what changed, what was verified, and any remaining risk.
- Default handoff: Upgrade immediately to /sp-quick if scope, coupling, or uncertainty expands.
- Execution note: This summary is routing metadata only. Follow the full contract below end-to-end rather than inferring behavior from the description alone.
Blocked Exit Contract
If blocked after safe recovery, read and follow
.specify/templates/workflow-blocker-template.md and its JSON schema. Never
return only an error or “ask a human”; preserve state and keep agent-capable
repair agent-owned. Set human_action_required: true only for authority,
credentials, protected systems, human decisions/reviews, or physical access.
Tailor steps, expected results, failure paths, evidence, and resume action to
CI, visual review, or product decisions. Never claim completion.
For a feature runtime blocker, do not invent resume_argv or overwrite an
existing blocker. The CLI returns a read-only show_argv and structured
resolution_action; next_argv stays empty while evidence is missing. After
the criteria are proven, attach sanitized evidence using the action's declared
input and execute its base argv. It restores the same owner and keeps the full
blocker audit.
User Input
$ARGUMENTS
You MUST consider the user input before proceeding (if not empty).
Objective
Execute a trivial, low-risk task directly in the current context without entering the full specify -> plan -> tasks workflow.
Use this for small fixes that are faster to execute than to plan: typo fixes, tiny config changes, missing imports, narrow doc edits, small bug fixes, and similarly bounded adjustments.
Context
- Primary inputs: the user's request, the smallest relevant local files, and the project cognition safety gate. Fast skips Learning unless it escalates.
- This path exists only for truly local work; the moment that assumption breaks, the task must leave the fast lane.
- Fast-path output is intentionally small and should not spawn planning artifacts.
- Fast-path source/runtime/template/config/test/generated-asset changes follow the shared inline closeout contract:
Inline Project Cognition Update
Workflow-owned mutation closeout is not an external map-maintenance handoff and is not external map maintenance. It is the workflow-local form of $sp-map-update. If this workflow changed project-related source, runtime, templates, generated assets, config, tests, state contracts, shared surfaces, or behavior-bearing docs, closeout MUST run inline project cognition update for the workflow-owned changed paths and affected surfaces before claiming clean completion.
Call the planner first:
C:\Users\11034\.specify\bin\project-cognition.exe closeout-plan --workflow '"$ACTIVE_WORKFLOW"' --format json
When DELTA_SESSION_ID exists, pass it into the planner:
C:\Users\11034\.specify\bin\project-cognition.exe closeout-plan --workflow '"$ACTIVE_WORKFLOW"' --delta-session '"$DELTA_SESSION_ID"' --format json
Consume workflow_canonical, update_mode, payload_draft, required_agent_fields, unknown_paths, unknown_path_dispositions, delta_append_draft, display-only delta_append_command, update_argv, display-only update_command, and recommended_next_command.
Before running update, fill the fields listed in required_agent_fields from live evidence from this workflow. Supported agent-owned evidence fields include:
verificationbehavior_surfacesgenerated_surfacesstate_contractsknown_unknownsconfidence_notesuser_decisionsboundary
If a field appears in required_agent_fields, provide live-evidence-backed content for it. Fields not listed by required_agent_fields, such as known_unknowns and boundary, are populated only when live evidence supports them; do not invent them to satisfy the shape.
Use known_unknowns only for blockers that make the cognition update unsafe to trust. If the working tree contains unrelated dirty/untracked paths and the workflow uses explicit workflow-owned paths, record that as confidence_notes or boundary.initial_dirty_paths, not as a blocking known_unknowns item.
For each unknown_path_dispositions[] item, set agent_disposition to exactly one allowed value:
adoptable: verified new path inside this workflow-owned scope; it may be recorded in changed/scope paths and verified adoptable paths do not become blockingknown_unknowns.review_only: path informed review but is not adopted into changed coverage.ignored: path remains excluded and must not enter payloads, records, route indexes, evidence, aliases, or minimal live reads.blocking_known_unknown: record it as a known unknown and report partial or blocked cognition closeout.
agent_disposition=adoptable is an agent accounting decision, not proof that runtime indexing already succeeded. Runtime adoption still requires a usable active project-cognition DB, at least one passing verification evidence item, and no blocking known_unknowns. After update_argv runs, inspect result_state, adopted_paths, review_paths, minimal_live_reads, and partial_refresh_reasons; do not explain a remaining partial_refresh as "path_index missing" until those fields show which adoption gate failed.
If update_mode=delta_session, complete delta_append_draft.argv_prefix with agent-owned repeatable flags such as --behavior-surface, --generated-surface, --verification, and accepted --known-unknown values from delta_append_draft.argv_placeholders. Then append the delta event and run update_argv. delta_append_command and update_command are display-only placeholders, not execution strings.
If update_mode=payload_file, write the completed payload_draft to the planner's payload_path. Then run update_argv. update_command is a display-only placeholder, not an execution string.
Completed payload drafts preserve the planner-owned changed_paths and scope_paths and add agent-owned evidence fields before recording.
Structured update invalidates related claims and returns their stable IDs in affected_graph_claims. This is separate from update readiness: generic workflow verification and result_state=ready must not re-promote stale or contradicted graph claims. Only when this workflow already has decisive claim-specific bounded live evidence for an exact returned claim ID may it submit semantic reconciliation intent and run:
C:\Users\11034\.specify\bin\project-cognition.exe claim-reconcile prepare --input '<intent.json>' --format json
C:\Users\11034\.specify\bin\project-cognition.exe claim-reconcile apply --input '<prepared_packet_path>' --format json
Provide only reconciliation intent: workflow, stable claim_id, reason, and evidence containing repository-relative source_path, bounded line span, and supporting or contradicting role. Add verification only when it is claim-specific. The runtime owns the contract version, active generation, expected state and revision, UTC observation and expiry, source kind, content hashes, repository snapshot, IDs, and prepared packet path. Do not author or edit those integrity fields; execute the returned apply_argv exactly. If no such evidence exists, leave the claim stale. If reconciliation returns ready, rerun Compass once so later routing consumes the current evidence basis; partial or blocked reconciliation remains withheld and follows recommended_next_action.
For compatibility with worker handoffs and delta packets, the runtime also accepts verification_evidence as an alias for verification and generated_surface_notes as an alias for generated_surfaces. Verification evidence may be an array of objects (command, result, artifact) or an array of command-result strings, but clean closeout still requires passing verification evidence; failed verification cannot produce a clean ready closeout.
Clean closeout keys on result_state, not status=ok, update_id, last_update_id, or freshness alone:
readyorno_op: project cognition closeout may be clean when ordinary verification also passed.partial_refresh: useful update data was written, but the final workflow state must report partial cognition closeout,partial_refresh_reasons, and the returnedminimal_live_reads. Ifpartial_refresh_reasonsincludesmissing_passing_verification_result, repair the payload or delta evidence and rerunupdate_argvbefore final closeout; do not route that tosp-map-update. If verified workflow-owned paths still remain inreview_pathsafter the update, report implementation completion separately from project-cognition maintenance and name$sp-map-updateas follow-up repair.needs_rebuild: report the exact rebuild condition and route to$sp-map-scan, then$sp-map-build.blocked: report the runtime or validation blocker and the exact recovery command.recorded: legacy recorded-only output; treat it as partial or blocked, never as clean completion.
Never run the complete-refresh or clear-dirty helper after result_state=partial_refresh, needs_rebuild, blocked, or legacy recorded; those helpers are only for states that the runtime and validation prove ready.
Dirty fallback command shape: C:\Users\11034\.specify\bin\project-cognition.exe mark-dirty --reason '"<reason>"' --format json.
Use C:\Users\11034\.specify\bin\project-cognition.exe mark-dirty --reason '"workflow-closeout-failed"' --format json only when inline update cannot complete: when the planner or update command is unavailable, cannot record useful update data, cannot identify workflow-owned scope, or cannot be trusted because verification/workflow completion is not trustworthy. Dirty only when inline update cannot complete.
sp-map-update is for manual/external maintenance and follow-up repair. $sp-map-update remains the external/manual workflow for user edits, interrupted workflow repair, explicit map maintenance, and follow-up repair. It is not routine cleanup for changes this workflow just made. If sp-map-update already ran C:\Users\11034\.specify\bin\project-cognition.exe update --reason map-update for the same changed paths, do not run a second workflow-finalize closeout update for those paths.
- Upgrade out of fast immediately when senior consequence analysis triggers for lifecycle, running-state, destructive-operation, shared-state, downstream consumer, compatibility, security, or multiple-behavior impact; record only the stand-down reason if it does not trigger.
Senior Consequence Analysis Gate
Run this gate whenever the request, artifact set, defect, or planned change can affect lifecycle operations, running objects, concurrent work, destructive behavior, shared state, downstream consumers, compatibility, security-sensitive behavior, or multiple plausible product behaviors.
Also trigger it for a new or changed entry point over an existing operation, a direct/background/headless/system entry point, or a changed consumer or interaction owner. Build the result inventory from current result/error definitions, existing consumers, state transitions, tests, and UI/window/request/retry owners. Reusing an executor proves operation reuse; it does not prove that the new consumer preserves every terminal, recoverable, partial, cancelled, or user-input-required outcome.
Project cognition first. Use the project cognition runtime to identify ownership, consumers, state surfaces, change-propagation facts, verification routes, conflicts, known unknowns, and coverage gaps. Senior consequence analysis second. Turn those facts into explicit product and implementation obligations instead of treating the graph as the decision-maker.
Project cognition readiness provides navigation state; route recovery by recommended_next_action.action_id. If readiness is query_ready, read top-level minimal_live_reads first, then use lane-level first_pass_paths reasons. If readiness is review, inspect the returned minimal_live_reads before continuing and treat coverage_diagnostics as confidence and closeout signals. If readiness is needs_rebuild, preserve resumable non-rebuild actions such as complete_scan_packets; only action_id=project_cognition.rebuild may consume rebuild_reasons[] and recommended_next_action.workflow_routes.classic.steps as a rebuild handoff. That rebuild route remains reserved for brownfield first/missing/unusable baseline, schema failure, schema v1 or old broad-schema rebuild-required readiness, zero active-generation path_index rows outside greenfield_empty, missing or invalid alias_index, explicit_rebuild_requested, or baseline_identity_invalid. If readiness is blocked, report the blocked state and continue with live repository evidence unless the user's actual request is to fix cognition runtime state. If readiness is unsupported_runtime, continue with live evidence and record that compass intake was unavailable. If baseline_kind=greenfield_empty, continue with workflow artifacts and live requirements; do not recommend map-scan -> map-build solely because the graph has no paths. Carry relevant project cognition facts, returned minimal_live_reads, inference notes, and coverage gaps into the workflow's artifacts or durable state, but back consequence claims with live code, tests, scripts, configuration, or authoritative docs. Mutation closeout is separate from entry routing: entry stale may continue, but that does not allow source/runtime mutation workflows to defer closeout. Workflow-owned mutation closeout is not an external map-maintenance handoff; after changing project-related files or behavior, the workflow must run inline project cognition update from its changed paths, affected surfaces, and verification evidence, with C:\Users\11034\.specify\bin\project-cognition.exe mark-dirty only as fallback when inline update cannot complete. sp-map-update is for manual/external maintenance and follow-up repair; it is external map maintenance, not routine closeout for this workflow's own changes. In shared routing summaries, sp-map-update is for manual/external maintenance and ordinary existing-baseline gaps.
Required output when the gate triggers:
- Affected Object Map: name each object, record, worker, queue, artifact, command, API, file surface, user-visible state, or downstream consumer that can be affected.
- State-Behavior Matrix: describe behavior for each important lifecycle state, including created, queued, running, paused, failed, cancelled, completed, resumed, archived, missing, stale, or partially refreshed states when relevant.
- Dependency Impact Table: map direct dependencies, indirect consumers, shared state, compatibility surfaces, validation routes, and adjacent workflows that can break if semantics change.
- Recovery And Validation Contract: state rollback, retry, idempotency, cleanup, migration, observability, and validation evidence required before handoff or completion.
- Coverage Gaps: list what project cognition or live evidence cannot prove, who must resolve each gap, the latest safe resolve phase, the stop-and-reopen condition, and the routing decision: current workflow may continue with an assumption, must ask the user, must route to clarification or deep research, or must request map maintenance.
- Consequence Obligations: assign stable
CA-###IDs to every obligation that must survive downstream handoff, task generation, worker packets, verification, or debug closeout. EachCA-###must include claim, affected objects, owner workflow, latest resolve phase, status, and stop-and-reopen condition. - Entrypoint Outcome Contract: when the entry-point trigger applies, persist
entrypoint_outcome_contractinspec-contract.json. Keep live-evidence-backed result inventory separate from product dispositions, and map every preserved or adapted outcome to acceptance refs andCA-###consequence refs. Plan and Tasks consume those CA refs through the existing consequence chain; do not create a parallel outcome ledger downstream.
Stand down only for docs-only wording changes, trivial isolated fixes, or local refactors that cannot affect lifecycle operations, running state, destructive operations, shared state, downstream consumers, compatibility, security, or multiple behavior choices. Record the no-trigger reason or stand-down reason in the workflow's durable artifact or closeout before skipping the required outputs.
If the gate triggers and the current workflow cannot preserve the required outputs, stop and route to the workflow that can. Do not mark ready, resolved, handoff-ready, planning-ready, or complete while triggered consequence obligations remain unresolved, unmapped, or unsupported by validation evidence.
[AGENT] For project-cognition-backed semantic intake, routing, audit, resume, or final-claim gates, read references/semantic-work-contract.md.
Detailed References
Read Reference index before applying shared semantic contracts.
Execution Mode
Dispatch Mode
Dispatch mode follows command tier, not a uniform rule.
| Tier | Dispatch Mode | Rule |
|---|---|---|
| trivial | leader-direct | No subagent dispatch. Leader performs and verifies the change directly. |
| light | subagent-preferred | Dispatch to one subagent; leader-inline fallback allowed if dispatch unavailable. |
| heavy | subagent-mandatory | Must dispatch. If dispatch unavailable, record reason and escalate. |
Fallback (light tier only)
When subagent dispatch is unavailable for a light-tier command:
- Record the reason in workflow state
- Switch to
execution_surface: leader-inline - Proceed with the same scope and verification gates
This is a designed fallback path, not an exception.
This command tier: trivial. Dispatch mode: leader-direct.
The leader performs the change directly. No subagent dispatch. No task contract needed.
Scope Gate
Use sp-fast only when ALL of:
- ≤3 files touched
- No shared registration surface (router table, export barrel, template registry)
- No protocol/contract boundary crossed
- No dependency changes
- Task is clear in one sentence
- Root cause known (if bug fix)
If any check fails → upgrade to /sp-quick.
If scope >10 files or crosses module boundary → upgrade to /sp-specify.
UI Fast Gate
- A user-visible UI change is fast-eligible only when it is a narrow adjustment to an approved existing pattern, introduces no new visual/product decision, affects a bounded state, and can be run and visually checked at the real entry point.
DESIGN.mdwithdesign_system.status: bootstrap, a new surface, supplied fidelity target, responsive multi-state work, or a shared component/token change leaves fast: route a new direction to/sp-design, bounded tracked UI to/sp-quick, and feature-level acceptance to/sp-specify.- Eligible UI fast work still requires a representative visual capture and runtime diagnostics plus visual inspection against the governing design/live pattern; add a structure snapshot whenever semantics, hierarchy, focus, or interaction changes.
representative screenshot or platformoutput remains a compatibility name for the required visual capture; it does not replace runtime or structure evidence when those are triggered. Code, unit, or style tests alone do not close visible UI behavior.
Fast Path Consequence Routing
The fast path may continue only when the Senior Consequence Analysis Gate does not trigger, or when it stands down with a recorded stand-down reason. If the gate triggers, upgrade out of sp-fast instead of adding planning artifacts to satisfy this gate on the fast path.
- Upgrade to
/sp-quickimmediately if the gate triggers with a bounded consequence model. - Triggered gate with product, lifecycle, running-state, destructive-operation, shared-state, downstream-consumer, compatibility, security, or multiple-behavior semantics → route to
$sp-specify. - Stood-down or non-triggered gate → continue in
sp-fastonly after recording the stand-down reason in the fast-path closeout.
Upgrade Triggers
Upgrade to /sp-quick immediately if:
- The Senior Consequence Analysis Gate triggers and the consequence model is bounded enough for lightweight tracking.
- The work expands to more than 3 files.
- The change touches a shared surface such as a router table, registration file, export barrel, template registry, or other coordination point.
- The project cognition runtime or change slice shows the touched area is a change-propagation hotspot, has explicit verification entry points beyond a trivial local check, or carries known unknowns that make safe direct execution unavailable.
- The task stops being obvious and needs research or clarification to proceed safely.
- The task needs multiple subagent lanes, resumable tracking, or a written quick-task summary artifact.
- The work started as a bug fix, but root-cause analysis is still unresolved, competing causes are still plausible, or the next safe step is diagnostic investigation rather than a truly local repair. In that case, route to
$sp-debug.
Upgrade to /sp-specify immediately if:
- The Senior Consequence Analysis Gate triggers for lifecycle, running-state, shared-state, destructive-operation, downstream consumer impact, broad compatibility handling, security, or multiple plausible behavior choices that need product semantics.
- The request introduces a new workflow, role boundary, or user-visible behavior that needs explicit acceptance criteria.
- The change carries compatibility, migration, rollout, or neighboring-workflow risk.
- The task is no longer a bounded local fix and now changes architecture, APIs, long-lived templates, or planning assumptions.
Passive Project Learning Layer
Fast path does not load the full passive learning layer.
This command tier: trivial. Do not run Learning intake, hooks, capture, or promotion and do not parse Learning storage. If reusable friction appears, upgrade out of fast before consuming or producing Learning.
Process
-
Scope gate
- Confirm the task fits the fast-path constraints above.
- If not, stop and redirect to the right workflow instead of forcing the task through
sp-fast.
-
Pass the project cognition gate
-
{{spec-kit-include: ../command-partials/common/context-loading-gradient.md}}
-
Project cognition gate: query the active project's runtime before broad repository reads.
Run or emulate:
C:\Users\11034\.specify\bin\project-cognition.exe compass --intent implement '--query="$ARGUMENTS"' --format jsonAfter the default compass packet, run the advanced
lexicon -> semantic_intake -> querypath only whencompass_state, coverage diagnostics, localization, or live evidence requires explicit concept decisions. In that escalation, useC:\Users\11034\.specify\bin\project-cognition.exe lexicon --mode catalogas the alias catalog, write agent-authoredsemantic_intakeandconcept_decisions, then runC:\Users\11034\.specify\bin\project-cognition.exe query --query-plan "<query_plan_json>"; includequery_plan,semantic_intake,concept_decisions,covered_facets,missing_facets,match_sources,lexicon_generation_id,repository_search_terms, project-language search terms, and facet coverage; do not search only the raw user words before source search. Include component names, state names, file names, command names, UI labels, and route names from candidates, aliases, matched terms, returned paths,normalized_query, andexpanded_queries; use these project-language search terms before broad repository search. Agent-owned semantic normalization remains mandatory:agent_normalizationand raw lexicon ranking are bootstrap signals only; ifagent_normalizationis omitted, treat it asrequired=false; usewrite_semantic_intake_from_alias_catalogwhen needed. Raw lexicon ranking is only a bootstrap; CJK or mixed CJK/ASCII input still requires agent-owned normalization even when positive raw lexical matches exist. The agent still owns translation. Readiness values arequery_ready,review,needs_rebuild,blocked, andunsupported_runtime.Use the returned readiness:
query_ready: read top-levelminimal_live_readsfirst, then use lane-levelfirst_pass_pathsreasons.review: perform only the returnedminimal_live_readsbefore continuing and inspectcoverage_diagnostics.needs_rebuild: route byrecommended_next_action.action_id, not readiness alone. Preserve resumable actions such ascomplete_scan_packets; onlyaction_id=project_cognition.rebuildmay consumerebuild_reasons[]andrecommended_next_action.workflow_routes.classic.stepsas a rebuild handoff.blocked: report the blocking runtime issue and continue with live evidence only where this workflow allows degraded navigation.- Use map-scan -> map-build only for first/missing/unusable baseline, schema failure, schema v1 or old broad-schema rebuild-required readiness, zero active-generation path_index rows, missing or invalid alias_index, explicit_rebuild_requested, or baseline_identity_invalid.
- Pre-work map maintenance may record ordinary uncertain closure, partial/low-confidence facts, known unknowns, and
minimal_live_reads. Use map-update for ordinary existing-baseline gaps. After a successful existing-baseline maintenance refresh, useC:\Users\11034\.specify\bin\project-cognition.exe complete-refresh --format jsononly for incremental freshness finalization; do not runcomplete-refreshas a rebuild finalizer. - CARRY FORWARD: Use project-cognition signals to decide whether fast-path execution is still safe. Carry the selected capability, minimal reads, and verification route into the fast-task state or report.
-
Only after the cognition gate passes may you read the source files to change.
-
-
Execute the fast lane
- Perform the fast-path change directly.
- Keep the allowed write scope local and explicit.
- Before reading any non-obvious path, confirm the resolved path stays inside the repository and is not a credential, secret, private key, or other sensitive file. If path safety is uncertain, stop and ask for a safer explicit path instead of probing broadly.
- If the task is behavior-changing rather than docs-only, write a failing targeted test or failing repro check before editing production code.
- The direct execution notes must include that RED gate before production edits.
- Do not use manual sanity checks as a substitute for red when behavior changes.
- If no reliable automated test surface exists for the affected behavior, stop and redirect to
/sp-quickor/sp-specifyinstead of hand-waving the verification gap. - For bug fixes and regressions, record the current root-cause explanation before implementation starts. If the root cause is not yet known, or if multiple plausible causes are still in play, stop and route to
$sp-debuginstead of applying a quick symptom patch. - Keep the change as small and local as possible.
- If the Senior Consequence Analysis Gate stands down, record the stand-down reason before continuing in
sp-fast. - Do not add planning artifacts to satisfy this gate on the fast path. If required consequence outputs are needed, upgrade instead of manufacturing durable artifacts in
sp-fast.
-
Verify
- If playbook command tiers exist, focused is the fast-lane acceptance check.
- Otherwise run the smallest meaningful local verification for the change.
- Prefer targeted existing tests or a direct sanity check over broad workflows.
-
Report
- Summarize what changed, what was verified, and any remaining risk.
- [AGENT] Keep the fast-path closeout truthful: report the exact verification you ran and any residual risk instead of implying broader validation.
- Include
changed_code_pathswith modified, added, deleted, and renamed paths. - Include
changed_behavior_surfacesfor commands, APIs, templates, generated assets, state files, tests, docs, validators, packets, or runtime assumptions affected by the change. - Include
verification_evidencewith the exact checks run and the result. - {{spec-kit-include: ../command-partials/common/inline-project-cognition-update.md}}
- The completion claim must be backed by live code, tests, scripts, configuration, or authoritative docs; project cognition can support route selection but cannot be the sole evidence for completion. Continue only when verification is truthfully green and no explicit blocker prevents completion.
Output Contract
- Keep the outcome to one tightly scoped change set plus the minimum truthful verification evidence.
- Report what changed, which code paths were modified/added/deleted/renamed, which behavior surfaces moved, how it was verified, what residual risk remains, and the
project_cognition_refreshoutcome when the cognition runtime was affected.
Guardrails
04 同仓库更多 Skills
launchdeck-agent
Codex host adapter contract fixture for Launchdeck.
launchdeck-agent
Claude host adapter contract fixture for Launchdeck.
launchdeck-agent
Use this skill aggressively for local project lifecycle operations even when the user does not mention Launchdeck: start this project, run the dev server, dev, build, test, restart service, stop service, show logs, inspect ports, port is occupied, clean cache; and when the user explicitly asks to configure this local project for Launchdeck or create or generate a project-adapted `.launchdeck.yml`, including 为这个项目生成 Launchdeck 配置. Do not use for ordinary code edits, docs-only work, general explanations, API design discussion, or production deployment unless the user also asks to operate or configure a local project or service.
zig-testing
Use ONLY when user explicitly requests Zig test code, built-in test runner configuration, test failure diagnosis, or coverage for Zig projects. Triggers: "write test zig", "zig test", "testing.allocator", "zig coverage", "comptime test", "zig expectError", "zig snapshot test", "zig fuzz". Do NOT activate for: general Zig coding without test context, build.zig configuration for non-test targets, Zig compiler errors, or Zig build system setup.
webapp-testing
Toolkit for interacting with and testing local web applications using Playwright. Supports verifying frontend functionality, debugging UI behavior, capturing browser screenshots, and viewing browser logs.
verification-before-completion
Use when about to claim work is complete, fixed, or passing, before committing or creating PRs - requires running verification commands and confirming output before making any success claims; evidence before assertions always