edgy-target-state
Internal target-state architecture workflow on EDGY 23: strategy → purpose map, capability map and cards, guardrails, building-block hypothesis with transition overlay, work packages, decision records (via an external ADR skill), role model and a stakeholder summary. Orchestrates edgy-framework (target-state mode) and edgy-diagram (generator, lint, preview). Complements edgy-assessment, which is the outside-in assessment of a company from public sources.
- License 许可
- Apache-2.0
- 最近更新
- 2026-10-19
- Stars
- ★ 2
- Forks
- 0
01 前言 Front Matter
- name
- edgy-target-state
- tags
- [ "edgy", "enterprise-design", "architecture", "target-state", "capability-map", "roadmap", "fi", "en" ]
- agents
- [ "claude-code", "cursor", "vibe", "generic" ]
- inputs
- [ { "name": "programme", "type": "text", "description": "Name and scope of the target-state work (organisation or unit, horizon year)" }, { "name": "sources", "type": "text", "description": "Internal material: strategy documents (PDF/xlsx), meeting notes or minutes, an existing current-state model (.archimate or draw.io), interviews, existing wiki pages. Read before writing; never write to external systems unasked.\n" }, { "name": "phases", "type": "text", "required": false, "description": "Subset of phases 1–9 to run (9 = report and delivery); default is all phases\n" }, { "name": "language", "type": "enum", "values": [ "fi", "en" ], "default": "fi" } ]
- outputs
- [ { "type": "directory", "description": "<programme>-target-state/: purpose-map, capability-map, reference-architecture, organisation-roles and summary diagrams (.drawio + preview .svg/.png), capability cards, guardrails, building-block mirror table, work-package cards, decision list, and the target-state report (templates/target-state-report.md).\n" } ]
- version
- 1.3.0
- category
- architecture
- examples
- [ { "input": "examples/acme-transit-brief.md", "output": "examples/expected-acme-transit-target-state.md" } ]
- languages
- [ "fi", "en" ]
- description
- Internal target-state architecture workflow on EDGY 23: strategy → purpose map, capability map and cards, guardrails, building-block hypothesis with transition overlay, work packages, decision records (via an external ADR skill), role model and a stakeholder summary. Orchestrates edgy-framework (target-state mode) and edgy-diagram (generator, lint, preview). Complements edgy-assessment, which is the outside-in assessment of a company from public sources.
02 资源文件 7
- 参考文档examples/acme-transit-brief.md1.0 KB
- 参考文档examples/expected-acme-transit-target-state.md4.7 KB
- 参考文档templates/building-block-mirror.md589 B
- 参考文档templates/capability-card.md658 B
- 参考文档templates/guardrails.md268 B
- 参考文档templates/target-state-report.md838 B
- 参考文档templates/work-package.md508 B
03 SKILL.md 正文
EDGY Target-State Architecture
Purpose
This skill runs internal target-state architecture work on the EDGY 23 language: from strategy to a purpose map, a stable capability map with cards, guardrails, a building-block hypothesis shown as a layered reference architecture with a current → target overlay, work packages that each move one block and are measured by one Outcome, a role model, and a one-picture summary for stakeholders.
Use this skill when:
- The subject is your own organisation (or a client's) and the inputs are internal: strategy, minutes, an existing current-state model, interviews
- The question is what must we be able to do, how do we propose to do it, and in which order do we get there — not an outside-in assessment
- Deliverables go to decision makers and procurement, so they must be short, cross-referenced by id, and visually consistent
Do not use it for an outside-in assessment of a company from public
sources — that is edgy-assessment. The Experience facet is optional here;
do not force Task/Channel/Journey if they are not in scope.
This skill uses internally:
edgy-framework—mode: target-state(artefact definitions, strategy → EDGY mapping, capability formulation, role-model check)edgy-diagram—edgy_generator.py,edgy_lint.py,edgy_render.py(purpose, capability, reference, organisation and summary layouts, transition overlay)- an ADR skill for decision records when one is available in the agent's skill set; otherwise the 40-line template in edgy-framework
IMPORTANT: Produce all output in the language given by language. Keep
every artefact within the length table in edgy-framework (Output length by
mode). Never pad.
Agent Instructions
CRITICAL: read the inputs first, write nothing external
- Read every provided source before producing anything. Existing wiki pages and models are read-only until the user asks you to write.
- Extract three lists before Phase 1: candidate Purposes/KPIs (from strategy), candidate capabilities and current systems (from the current-state model and interviews), and open decisions (from minutes).
- Assign ids as you go:
PUR-,OUT-,CAP-,G-,BB-,WP-,ADR-. Ids appear in diagram subtexts ({id: …}) and in every document.
Phase 1 — Strategy → purpose map
- Map the strategy document with the table Mapping strategy documents to EDGY (edgy-framework): mission and vision → top Purposes, focus areas → sub-Purposes (never Story), KPIs → Outcomes, initiatives → Activities.
- Write
<programme>-purpose-map.txt(map_type: purpose,{id: PUR-xx}/{id: OUT-xx},containsfor the hierarchy,measuresfor KPIs, Organisation and Brand present). - Generate, lint, preview:
G=${EDGY_DIAGRAM_SCRIPTS:-skills/documentation/edgy-diagram/scripts} # installed skills: ~/.claude/skills/edgy-diagram/scripts python3 $G/edgy_generator.py <programme>-purpose-map.txt --output <programme>-purpose-map.drawio --preview python3 $G/edgy_lint.py <programme>-purpose-map.drawio - One paragraph: what the map says and what was ambiguous in the strategy.
Phase 2 — Capability map and cards
- Formulate capabilities with the helper questions in edgy-framework (Formulating capabilities): nouns stating a result, system-independent, 6–12 areas, 40–80 leaves. Never name a capability after a product.
- Write
<programme>-capability-map.txt(map_type: capability, onegroup:per area,{id: CAP-xx},{highlight: yes}for first-round decision units). Generate, lint, preview. - Write cards (
templates/capability-card.md) for the first-round decision units only — area or building-block level, ≤ 1 page each. A card names requirements, quality requirements, owned data and its master, current implementer, change pressure, measuring Outcome and constraining guardrails. - Coverage test: every capability has an implementer in the current state or an explicit gap; every data set has exactly one master. Gaps and double masters are findings.
Phase 3 — Guardrails
Write templates/guardrails.md: 5–12 principles, each one sentence, each
justified by a PUR- or OUT- id. A guardrail without a justification is
removed. Guardrails are tested in Phase 4, not negotiated there.
Phase 4 — Building-block hypothesis (H1)
- Propose about ten building blocks without product names. Each block covers one or more capabilities.
- Fill the mirror table (
templates/building-block-mirror.md): block × capabilities × guardrails (✓ / ✗ / ?) × Outcomes × change × open decision. - Write
<programme>-reference-architecture.txt(map_type: reference): lanes for layers (channels → channel backend → core → shared services / integration), actors as Organisation/People outside lanes (left), external systems with[external](right),{change: keep|new|change|replace| remove|decide}on every block and edge, one integration bus instead of a mesh. Generate, lint, preview. State in the delivery that the overlay is an EDGY extension. When the current and the target state are both modelled (edgy-model.json), derive the tags withedgy-assessment/scripts/edgy_model_diff.py current.json target.json --out transition.txt --report changes.md(keep / change / new / remove), then setreplaceanddecideby hand — they are decisions, not differences. A wave plan is a matrix:columns:= waves,rows:= areas,change:on every block (see transition-roadmap-map.txt among the edgy-diagram example inputs). - Open decisions (
decide) become ADR candidates. - Application landscape (optional). When the model records applications
(format 1.9, assets with
kind: application), draw the current landscape next to the hypothesis from the same model:edgy_model_to_txt.py model.json --views application,capability-matrix(edgy-assessment) and generate it with edgy-diagram. Setownership: requiredon the application page — in target-state work an application without an owner (W124) is a gap to close, not a note. The TIME badges ({time: …}) are the current lifecycle judgement; the transition overlay stays the place for the target. The diff (edgy_model_diff.py) compares asset kind, owner, TIME andrelationships[]too. - C4 for decided blocks only (optional, edgy-c4). When a building block
is decided (no open
decideon it, its ADR accepted) and the team that builds or buys it needs the next level, draw C4 for its applications with the edgy-c4 skill: an L1 page per application (notation: c4,level: context, derived from the model) and an L2 page only when the containers are known. Never for a block whose future is still open: C4 describes how a system is built, and drawing it for an undecided block presents a choice as made. Requires the claude-code or generic install.
Phase 5 — Work packages
One card per block that changes (templates/work-package.md): scope (one
block, current → target), exactly one Outcome, options A–D with the incumbent
continues always as one option, dependencies on other work packages and
ADRs, deadline and decision date. Optionally render the roadmap as
map_type: summary or a multi-page file.
Phase 6 — Decisions
If an ADR skill is available, call it for each open decision with the mirror-table row and the guardrails as context, and record the resulting ids. Otherwise use the ≤ 40-line template in edgy-framework. Rejected options and the reason are mandatory.
Phase 7 — Role model
Apply the role-model check (edgy-framework, Organisation intersection): for
each block, who steers, procures, defines, produces, operates and approves.
Write <programme>-organisation-roles.txt (map_type: organisation, roles
as Process, performs links). Generate, lint, preview. Add a load view
(team × phase, number of simultaneous responsibilities) when one team
appears under several roles; report the load, do not judge it.
Phase 8 — Stakeholder summary
Write <programme>-summary.txt (map_type: summary): who (Organisation) /
does what (Process) / what results (Outcome), 3–4 boxes per row, one
"used for" line. Generate, lint, preview. Write ≤ 200 words that a project
manager can read aloud in a minute. If they could not explain the picture
in 60 seconds, reduce it.
Phase 9 — Report and delivery
- Assemble
templates/target-state-report.md(report sections 1–8, one per phase 1–8, each with its diagram reference and its short text). - Lint every
.drawio; look at every preview; run the checklist from the edgy-diagram Preview loop. - Delivery (generic — this skill writes files only): one
.drawioper diagram (all pages inside) plus one preview image per page, named<programme>_<diagram>_v<N>.<ext>; remove superseded versions when a new one is accepted; write into wikis, trackers or other external systems only when the user asks, and then place each diagram next to the section it belongs to (purpose map → strategy; capability map → capabilities; reference → building blocks; roles → governance; summary → front page).
Output Template
See edgy-framework Target-state Output (en / fi) and
templates/target-state-report.md. The worked example
examples/expected-acme-transit-target-state.md shows the expected length
and tone for a fictional organisation.
Quality Gate
- [ ] Every focus area is a sub-Purpose, no focus area is a Story
- [ ] Every KPI is an Outcome with
measuresto its Purpose - [ ] Capabilities are system-independent nouns; 6–12 areas, 40–80 leaves
- [ ] Cards exist only for first-round decision units, each ≤ 1 page
- [ ] Every guardrail cites a
PUR-orOUT-id - [ ] About ten building blocks, no product names, every row of the mirror table filled
- [ ] Every work package has exactly one Outcome and the incumbent as an option
- [ ] Every open
decidehas an ADR id - [ ] Every role has an actor and every actor a role, or the gap is a finding
- [ ] Summary ≤ 200 words, ≤ 4 boxes per row
- [ ] All diagrams:
edgy_lint.py0 errors, preview looked at, overlay declared as an extension - [ ] C4 pages (if any) only for applications in decided building blocks
- [ ] Nothing written to external systems without an explicit request
Anti-patterns
- DO NOT run the assessment template (12 elements, 150 lines) on internal work — use these artefacts
- DO NOT put product names into building blocks or capabilities
- DO NOT write a card per level-2 capability
- DO NOT give a work package two Outcomes, or none
- DO NOT write to a wiki or tracker before being asked
- DO NOT pad any artefact to a length
- DO NOT draw C4 for an application in an undecided building block
Dependencies
edgy-framework≥ 1.4 (target-state mode)edgy-diagram≥ 2.3 (reference,summary,group:,lane:, transition overlay)- Optional: an ADR skill for decision records; headless Chromium for PNG previews