AGENT SKILL

hiring-scorecard

Builds structured interview scorecards tied to role-specific signals to reduce bias and improve calibration. Use when opening a new role or auditing an existing interview loop for consistency.

License 许可
MIT
最近更新
2026-10-05
Stars
★ 0
Forks
0

01 前言 Front Matter

name
hiring-scorecard
metadata
{ "title": "Hiring Scorecard Builder" }
description
Builds structured interview scorecards tied to role-specific signals to reduce bias and improve calibration. Use when opening a new role or auditing an existing interview loop for consistency.

03 SKILL.md 正文

Hiring Scorecard Builder

Unstructured interviews have poor predictive validity and amplify the biases of whoever talks most. A scorecard forces interviewers to decide what matters before meeting the candidate and to gather evidence, not impressions.

Step 1 - Define the Role's Top 4-6 Signals

Start from the first 90-day outcomes, not a list of desired traits. Ask: what does success look like concretely at 30, 60, and 90 days? Then work backward to the signals a candidate would have to demonstrate to make those outcomes likely. Good signals are observable in a conversation. Bad signals are adjectives ('smart', 'passionate', 'culture fit').

Step 2 - Map Signals to Interview Slots

Each interviewer owns 1-2 signals. Never have two interviewers independently assess the same signal with no calibration plan - duplication wastes time and creates conflicting data. Assign technical depth signals to engineers, cross-functional signals to PMs or peers, and leadership/judgment signals to the hiring manager.

Step 3 - Write the Scoring Rubric

For each signal, write what a 1 (does not meet bar), 3 (meets bar), and 5 (exceeds bar) looks like in observable terms. Example for 'navigates ambiguity': a 1 asks for requirements to be fully specified before acting; a 3 defines scope, makes assumptions explicit, and validates them; a 5 proactively creates structure where none exists and coaches others through it. The rubric must be written before interviews start.

Step 4 - Require Evidence, Not Ratings

The scorecard submission form has two fields per signal: a numeric score AND a required evidence quote from the candidate. No evidence, no score. This prevents post-hoc rationalization and makes debrief discussions concrete.

Step 5 - Run a Calibrated Debrief

Collect scores independently before the debrief meeting. Start by reading scores aloud before anyone speaks. Then discuss only the signals where scores diverge by 2 or more points - those are the interesting ones. The hiring manager does not share their view first; they synthesize last.

Escape Hatches

For a high-volume pipeline, reduce to 3 signals and a 3-point scale. For a senior or staff role, add a written exercise component and score the artifact, not the person's delivery style.

Deliverable

Produce a complete scorecard package: the 4-6 named signals each traced to a 30/60/90-day outcome, the signal-to-interviewer slot map, a written 1/3/5 rubric per signal in observable terms, the two-field submission form (score plus required evidence quote), and the debrief protocol (independent submission, scores read aloud first, hiring manager synthesizes last).

Do NOT

  • Do not write the rubric after interviews begin - a bar defined mid-loop bends toward the candidates already seen, which is exactly the post-hoc rationalization scorecards exist to prevent.
  • Do not use adjective signals ('strong communicator', 'culture fit') - anything not observable in a conversation becomes a proxy for likability and similarity bias.
  • Do not let interviewers share impressions before scores are submitted; early opinions anchor the group and erase the independent-signal value of a panel.
  • Do not average divergent scores into a middle number - a 1 and a 5 on the same signal means the interviewers saw different things or hold different bars, and that disagreement is the data.
  • Do not assign more than 2 signals to one interviewer; coverage gets shallow and the interview becomes a checklist sprint instead of an evidence-gathering conversation.
  • Do not carry a scorecard between materially different roles; signals derived from one role's 90-day outcomes do not transfer to another's.

Quality bar

  • Every signal traces to a concrete 30/60/90-day outcome and is observable in an interview.
  • The 1/3/5 rubric exists in writing before the first interview is scheduled.
  • Every submitted score has a verbatim evidence quote attached; scores without evidence are returned, not accepted.
  • The debrief discusses only divergences of 2+ points, and the hiring manager speaks last.

04 同仓库更多 Skills

SkillMedev
SkillMedev/engineering-manager-toolkit

tech-debt-prioritizer

Inventories tech debt and ranks it economically - scoring each item 1-3 on cost of delay (the interest rate) and leverage (the principal unblocked), multiplying into a priority index, and packaging the winners into a leadership proposal framed on business impact. Use when someone asks "which tech debt should we tackle first", "help me build a case for refactoring to leadership", "our backlog of debt is huge, where do we start", or is preparing quarterly planning. Do NOT use for finding and removing unused code - use dead-code-eliminator instead - for auditing third-party dependency risk - use dependency-risk-audit - or for planning the sprint the work lands in - use sprint-planning instead.

★ 0
SkillMedev
SkillMedev/engineering-manager-toolkit

team-health-check

Assesses a team's health across three independent dimensions - delivery, morale, and clarity - using observable signals from the last 8 weeks, then maps each red or yellow signal to one manager action with a 2-week horizon. Use when a manager asks "is my team okay", "how do I tell if morale is slipping", "we keep missing sprints and I don't know why", or wants a quarterly team health review. Do NOT use for facilitating a single sprint retrospective - use sprint-retro-facilitator instead - for structuring individual 1:1s - use 1on1-agenda - or for defining how a new team works together - use team-charter instead.

★ 0
SkillMedev
SkillMedev/engineering-manager-toolkit

sprint-retro-facilitator

Structures and facilitates sprint retrospectives with a timeboxed agenda, format selection, anti-blame ground rules, and owned action items that actually close. Use when someone asks "help me run our retro", "our retros produce the same actions every sprint", "what format should this retrospective use", or "how do I get the team to say what they're really thinking". Do NOT use for incident postmortems with a timeline and root-cause analysis - use postmortem-writer instead. For diagnosing chronic team dysfunction beyond one sprint, use team-health-check; for planning the next sprint's scope, use sprint-planning.

★ 0
SkillMedev
SkillMedev/engineering-manager-toolkit

performance-review-writer

Writes fair, specific, evidence-based performance reviews and ratings. Use when drafting or preparing for calibration to reduce recency bias and vague praise or criticism.

★ 0
SkillMedev
SkillMedev/engineering-manager-toolkit

feedback-writer

Drafts specific, observable, kind workplace feedback using the SBI model - Situation, Behavior, Impact - for both praise and correction. Use when someone asks "help me give feedback to a teammate", "how do I tell my report they keep missing deadlines", "make this feedback less vague", or wants to reinforce a good behavior specifically. Do NOT use for formal performance review documents - use performance-review-writer instead; for feedback on student work, use student-feedback-writer; for mediating an active interpersonal dispute, use conflict-resolution.

★ 0
SkillMedev
SkillMedev/engineering-manager-toolkit

eng-status-rollup

Rolls up engineering team status into an exec-ready written update with exactly three sections - progress in outcomes, risks with likelihood and mitigation, and asks with owners and deadlines - scannable in under 90 seconds. Use when someone asks "write my weekly eng update", "summarize team status for leadership", "turn these standup notes into an exec update", or is prepping for a leadership sync. Do NOT use for updates to external or cross-functional stakeholders on a project - use stakeholder-update instead - for public incident communication - use status-page-update - or for monthly investor letters - use investor-update-writer instead.

★ 0