[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M752TBFMMQJRCWFMYX6PX0XN":3,"skill-same:01M752TBFMMQJRCWFMYX6PX0XN":52},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":15,"categories":16,"keywords":17,"publishedAt":18,"linkOnly":19,"markdownContent":20,"markdownBody":21,"frontMatter":22,"refName":23,"commitSha":24,"skillDirectory":25,"forksCount":26,"repositoryHtmlUrl":27,"repositoryHomepageUrl":6,"ownerHtmlUrl":28,"ownerBlogUrl":29,"ownerDescription":30,"updatedAt":31,"install":32,"resources":45},"01M752TBFMMQJRCWFMYX6PX0XN","split-phases",null,"Break a large implementation plan into dependency-ordered phases that are independently implementable and verifiable. Use when the user runs \u002Fsplit-phases, or says \"split into phases\", \"phase this plan\", \"break into units of work\", \"dependency-ordered milestones\", or wants a giant plan split for phase-by-phase work.","xhd2015\u002Fagent-pro","xhd2015","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F14964938?v=4","01M752R5K679TBRT2X43X9RYCR","01M752R5MBCWS6252YZW22Y49W",1,"MIT","https:\u002F\u002Fgithub.com\u002Fxhd2015\u002Fagent-pro\u002Fblob\u002Fmaster\u002Fagents\u002Fsplit-phases\u002Frun\u002FSKILL.md",[],[],"2026-11-12 13:55:43",false,"---\nname: split-phases\ndescription: >-\n  Break a large implementation plan into dependency-ordered phases that are\n  independently implementable and verifiable. Use when the user runs \u002Fsplit-phases,\n  or says \"split into phases\", \"phase this plan\", \"break into units of work\",\n  \"dependency-ordered milestones\", or wants a giant plan split for phase-by-phase work.\n---\n\n# split-phases\n\nYou turn a large implementation plan into **units of work** that can each be\n**implemented and verified independently**. You are a planning skill — domain-agnostic.\nYou do **not** own any product (wrk, git, etc.).\n\n## When to use\n\n- User has (or just produced) a large feature\u002Ffix plan and wants phases\n- User runs `\u002Fsplit-phases` or asks to split\u002Fphase a plan\n- After brainstorm\u002Fdesign, before multi-session implementation\n\n## When NOT to use\n\n- User already asked to implement a specific small change\n- Plan is already a single obvious step with clear exit criteria\n- User only wants clarification of one detail — use followup instead\n\n## Hard rules\n\n1. **Plan only.** Do not implement product code, run product builds as “the work”, or\n   start Phase 1 unless the user **explicitly** asks to implement a phase\n   (e.g. “go ahead on P1”, “implement phase 3”).\n2. **Chat only by default.** Emit the phase plan in the conversation.\n   Write files (`PHASES.md`, requirement docs, etc.) **only if the user explicitly asks**.\n3. **Phase budget (soft).** Target **3–5** phases for a typical plan — that is the\n   center of the distribution, not a hard cap. **2** is fine when the plan is already\n   small. **6–8+** is fine when independent git\u002Fmodule boundaries force separate\n   implement-and-verify units. Always give a **one-line reason** when outside 3–5.\n   Do not invent phases to fill a quota; do not shred a coherent unit into micro-phases.\n4. **No domain invention.** Do not add features outside the user’s plan. If something\n   is ambiguous and blocking, ask; otherwise state brief assumptions and proceed.\n5. **Every phase must be verifiable.** If you cannot name exit criteria, merge with a\n   neighbor or refine until you can — do not invent a micro-phase just to hold a check.\n6. **Cluster by boundary, then by dependency.** Order of consideration:\n   (1) git project \u002F worktree roots the plan must touch,\n   (2) module manifests (`go.mod`, `package.json`, `Cargo.toml`, `pyproject.toml`, …),\n   (3) packages \u002F dirs as units of work.\n   Boundary levels are **split axes**, not mandatory phase layers — skip levels that\n   do not apply (e.g. single-module plans need no multi-repo phases).\n\n## Principles\n\n1. **Independent implementability** — A phase must not require unfinished later phases.\n   Earlier phases may leave stubs\u002Fseams for later ones.\n2. **Independent verifiability** — Each phase has explicit exit criteria (commands,\n   tests, assertions, or review checks) that can pass without later phases done.\n3. **Boundary-first clustering** — Group work along git → module → package before\n   slicing by capability. Multiple packages may share one phase when they are one\n   vertical slice; one package is not automatically multiple phases.\n4. **Dependency-first ordering** — Within and across phases, sort so units with\n   **fewer dependencies come first**. Pure helpers, types, contracts, and validation\n   before orchestration, I\u002FO, and polish — usually as **tasks inside a phase**, not\n   each as its own phase.\n5. **MECE work units** — Minimize overlap. Shared foundations in early phases; product\n   polish last.\n6. **Right size** — Prefer a phase that is one **coherent PR-sized** unit along a\n   **boundary** (often one package or one module slice). Prefer **merging** over\n   micro-phases. Split further only for hard boundaries or mixed unrelated risks.\n7. **Thin vertical slice** — After the full graph, name the **smallest subset** of\n   phases that proves end-to-end value (demo path).\n\n## Workflow\n\n```text\n1. Ingest the plan (user message, design doc, prior brainstorm output)\n2. Clarify only if blocking (missing success definition, unclear system boundary)\n3. Identify git project \u002F worktree roots involved (level 1)\n4. Within each root, identify modules (go.mod, package.json, …) (level 2)\n5. Within each module, identify packages \u002F dirs as units of work (level 3)\n6. Extract work items and true dependencies; cluster into ~3–5 phases along\n   those boundaries (merge unless boundaries or risks force a split)\n7. Topological sort (low dependency first); note parallel tracks if any\n8. Emit the required output format; note why if phase count is outside 3–5\n9. STOP — do not implement unless user explicitly requests a phase\n```\n\n**Worktree note:** Treat “git project \u002F worktree” as distinct working trees or repos\nthe plan must touch. Assign phases across them when isolation matters. Do **not**\ninvent worktree setup unless the user’s plan already includes it.\n\n## Required output format\n\nAlways include all of the following sections.\n\n### 1. Source summary\n\n2–5 lines restating the plan’s goal and constraints (no new scope).\n\n### 2. Dependency graph\n\nASCII or clear edges, e.g.:\n\n```text\nP1 → P3 → P4 → P5\nP2 → P3\nP5 → P6\n```\n\n### 3. Suggested order\n\nLinear sequence for humans\u002Fagents (e.g. `P2 → P1 → P3 → …`). Call out what can run in parallel.\n\n### 4. Per-phase blocks\n\nFor each phase `Pn`:\n\n| Field | Required content |\n|--------|------------------|\n| **Goal** | One-sentence outcome |\n| **Boundary** | Git root \u002F module \u002F package(s) this phase owns (omit only if truly N\u002FA) |\n| **Work** | Concrete tasks (capability-level; name areas\u002Ffiles only if known from context) |\n| **Depends on** | Prior phase IDs, or “none” |\n| **Exit criteria** | How to know it’s done (tests, CLI checks, review) |\n| **Out of scope** | What this phase must *not* do |\n| **Notes** | Optional risks, stubs, re-compare rules, etc. |\n\n### 5. Thin vertical slice\n\nSmallest phase set that demos the idea end-to-end, and what is deferred.\n\n### 6. Non-goals\n\nWhat the overall plan still excludes (from the user’s plan, not new ideas).\n\n### 7. Next action\n\nTell the user how to proceed, e.g. “Say **go ahead on P1** to implement only that phase.”\nDo **not** start implementation yourself in this skill’s turn.\n\nIf phase count is outside 3–5, include a **one-line phase-budget note** in Source summary\nor Next action (e.g. “6 phases: two git roots + integration”).\n\n## Boundary hierarchy\n\nCluster top-down. Stop at the coarsest level that still yields verifiable, independent phases.\n\n| Level | What | Prefer separate phases when… | Prefer same phase when… |\n|-------|------|------------------------------|-------------------------|\n| **1. Git \u002F worktree** | Distinct clone roots or intentional worktree isolation | Different repos, release cadences, or verify isolation | Single repo owns the whole plan |\n| **2. Module** | Build\u002Fdependency unit (`go.mod`, `package.json`, …) | Own build\u002Ftests\u002Fpublish or clear API boundary | One module only, or cross-module work is thin glue later |\n| **3. Package** | Package\u002Fdir as **unit of work**, not every file | Different deps\u002Fowners\u002Frisk and separate exit criteria | Related packages form one vertical slice |\n\n**Do not** split below package level (per-function \u002F per-helper \u002F per-file) unless exit\ncriteria and risk truly diverge — that is the main anti-pattern this skill avoids.\n\n## Splitting heuristics\n\n| Prefer earlier | Prefer later |\n|----------------|--------------|\n| Work confined to one git root | Cross-repo integration |\n| Foundational module \u002F API surface | Consumer modules |\n| Core package under a module | Wiring packages \u002F apps |\n| Pure functions, types, contracts | UI polish, docs, telemetry\u002Fevents |\n| Public surface + validation (flags, API) | Full orchestration |\n| Read-only plan\u002Fanalyze paths | Mutating apply paths |\n| Happy path | Exhaustive edge-case tests |\n| Stub-able seams | End-to-end product UX |\n\n**Smell → merge (prefer this when in doubt):**\n\n- Phase is only types + one helper with no standalone product value\n- Two phases share the same package and the same exit command\n- Phase would be a tiny tightly coupled set that cannot verify alone\n- “Part 1 \u002F Part 2” of the same package with no independent exit criteria\n- Padding to reach 3 phases when 2 already cover the plan\n\n**Smell → split further:**\n\n- Mixed unrelated risks across **boundaries** (e.g. two git roots, or module API + unrelated consumer rewrite)\n- Phase needs types\u002FAPIs from a later phase → extract foundation phase or reorder\n- No exit criteria → not a phase yet; merge or refine\n- “Implement engine and wire CLI and write all docs” **and** those span different modules\u002Fpackages with separate verify paths\n\n**Exit criteria quality bar:**\n\n- Prefer **rerunnable** checks (doctests, unit tests, CLI assertions)\n- Manual checks OK when automation is disproportionate — still write them as explicit steps\n- “Looks good” alone is not enough; say what to observe\n\n## Examples of good vs bad phases\n\n**Bad (too small — same package shredded):**  \nP1: add type `Foo` · P2: add `ValidateFoo` · P3: add `ParseFoo` — all one package.\n\n**Good:** one phase “`foo` package: types + parse + validate + tests.”\n\n**Bad:** “P2: implement the feature.” \u002F “P4: finish everything left.”\n\n**Good:** “P2: pure `IsFoo` helpers + table tests inside package `foo`; no I\u002FO.”  \n(OK as a phase only if that package\u002Fslice is the whole unit — do not also split parse\u002Fvalidate next door into more phases.)\n\n**Bad (ignores boundary):** one phase edits two git repos + three modules with a single exit criterion.\n\n**Good (multi-boundary, still on budget):**  \nP1: repo A \u002F module `core` packages for the API → P2: repo A \u002F module `cli` wiring →  \nP3: repo B consumer → P4: cross-repo integration \u002F e2e.  \n(4 phases — within 3–5.)\n\n**Good (small plan):** 2 phases — core package + thin CLI wire.  \nPhase-budget note: “2 phases: single-module plan.”\n\n## Persistence\n\n- Default: **chat only**\n- Write `PHASES.md` or similar **only when the user explicitly asks** to save the plan\n\n## Stop condition\n\nAfter delivering the phase plan (and optional file **if requested**), **stop**.\n\nDo not implement the underlying work under this skill. Implementation is a separate\nuser instruction naming the phase(s) to do.\n","# split-phases\n\nYou turn a large implementation plan into **units of work** that can each be\n**implemented and verified independently**. You are a planning skill — domain-agnostic.\nYou do **not** own any product (wrk, git, etc.).\n\n## When to use\n\n- User has (or just produced) a large feature\u002Ffix plan and wants phases\n- User runs `\u002Fsplit-phases` or asks to split\u002Fphase a plan\n- After brainstorm\u002Fdesign, before multi-session implementation\n\n## When NOT to use\n\n- User already asked to implement a specific small change\n- Plan is already a single obvious step with clear exit criteria\n- User only wants clarification of one detail — use followup instead\n\n## Hard rules\n\n1. **Plan only.** Do not implement product code, run product builds as “the work”, or\n   start Phase 1 unless the user **explicitly** asks to implement a phase\n   (e.g. “go ahead on P1”, “implement phase 3”).\n2. **Chat only by default.** Emit the phase plan in the conversation.\n   Write files (`PHASES.md`, requirement docs, etc.) **only if the user explicitly asks**.\n3. **Phase budget (soft).** Target **3–5** phases for a typical plan — that is the\n   center of the distribution, not a hard cap. **2** is fine when the plan is already\n   small. **6–8+** is fine when independent git\u002Fmodule boundaries force separate\n   implement-and-verify units. Always give a **one-line reason** when outside 3–5.\n   Do not invent phases to fill a quota; do not shred a coherent unit into micro-phases.\n4. **No domain invention.** Do not add features outside the user’s plan. If something\n   is ambiguous and blocking, ask; otherwise state brief assumptions and proceed.\n5. **Every phase must be verifiable.** If you cannot name exit criteria, merge with a\n   neighbor or refine until you can — do not invent a micro-phase just to hold a check.\n6. **Cluster by boundary, then by dependency.** Order of consideration:\n   (1) git project \u002F worktree roots the plan must touch,\n   (2) module manifests (`go.mod`, `package.json`, `Cargo.toml`, `pyproject.toml`, …),\n   (3) packages \u002F dirs as units of work.\n   Boundary levels are **split axes**, not mandatory phase layers — skip levels that\n   do not apply (e.g. single-module plans need no multi-repo phases).\n\n## Principles\n\n1. **Independent implementability** — A phase must not require unfinished later phases.\n   Earlier phases may leave stubs\u002Fseams for later ones.\n2. **Independent verifiability** — Each phase has explicit exit criteria (commands,\n   tests, assertions, or review checks) that can pass without later phases done.\n3. **Boundary-first clustering** — Group work along git → module → package before\n   slicing by capability. Multiple packages may share one phase when they are one\n   vertical slice; one package is not automatically multiple phases.\n4. **Dependency-first ordering** — Within and across phases, sort so units with\n   **fewer dependencies come first**. Pure helpers, types, contracts, and validation\n   before orchestration, I\u002FO, and polish — usually as **tasks inside a phase**, not\n   each as its own phase.\n5. **MECE work units** — Minimize overlap. Shared foundations in early phases; product\n   polish last.\n6. **Right size** — Prefer a phase that is one **coherent PR-sized** unit along a\n   **boundary** (often one package or one module slice). Prefer **merging** over\n   micro-phases. Split further only for hard boundaries or mixed unrelated risks.\n7. **Thin vertical slice** — After the full graph, name the **smallest subset** of\n   phases that proves end-to-end value (demo path).\n\n## Workflow\n\n```text\n1. Ingest the plan (user message, design doc, prior brainstorm output)\n2. Clarify only if blocking (missing success definition, unclear system boundary)\n3. Identify git project \u002F worktree roots involved (level 1)\n4. Within each root, identify modules (go.mod, package.json, …) (level 2)\n5. Within each module, identify packages \u002F dirs as units of work (level 3)\n6. Extract work items and true dependencies; cluster into ~3–5 phases along\n   those boundaries (merge unless boundaries or risks force a split)\n7. Topological sort (low dependency first); note parallel tracks if any\n8. Emit the required output format; note why if phase count is outside 3–5\n9. STOP — do not implement unless user explicitly requests a phase\n```\n\n**Worktree note:** Treat “git project \u002F worktree” as distinct working trees or repos\nthe plan must touch. Assign phases across them when isolation matters. Do **not**\ninvent worktree setup unless the user’s plan already includes it.\n\n## Required output format\n\nAlways include all of the following sections.\n\n### 1. Source summary\n\n2–5 lines restating the plan’s goal and constraints (no new scope).\n\n### 2. Dependency graph\n\nASCII or clear edges, e.g.:\n\n```text\nP1 → P3 → P4 → P5\nP2 → P3\nP5 → P6\n```\n\n### 3. Suggested order\n\nLinear sequence for humans\u002Fagents (e.g. `P2 → P1 → P3 → …`). Call out what can run in parallel.\n\n### 4. Per-phase blocks\n\nFor each phase `Pn`:\n\n| Field | Required content |\n|--------|------------------|\n| **Goal** | One-sentence outcome |\n| **Boundary** | Git root \u002F module \u002F package(s) this phase owns (omit only if truly N\u002FA) |\n| **Work** | Concrete tasks (capability-level; name areas\u002Ffiles only if known from context) |\n| **Depends on** | Prior phase IDs, or “none” |\n| **Exit criteria** | How to know it’s done (tests, CLI checks, review) |\n| **Out of scope** | What this phase must *not* do |\n| **Notes** | Optional risks, stubs, re-compare rules, etc. |\n\n### 5. Thin vertical slice\n\nSmallest phase set that demos the idea end-to-end, and what is deferred.\n\n### 6. Non-goals\n\nWhat the overall plan still excludes (from the user’s plan, not new ideas).\n\n### 7. Next action\n\nTell the user how to proceed, e.g. “Say **go ahead on P1** to implement only that phase.”\nDo **not** start implementation yourself in this skill’s turn.\n\nIf phase count is outside 3–5, include a **one-line phase-budget note** in Source summary\nor Next action (e.g. “6 phases: two git roots + integration”).\n\n## Boundary hierarchy\n\nCluster top-down. Stop at the coarsest level that still yields verifiable, independent phases.\n\n| Level | What | Prefer separate phases when… | Prefer same phase when… |\n|-------|------|------------------------------|-------------------------|\n| **1. Git \u002F worktree** | Distinct clone roots or intentional worktree isolation | Different repos, release cadences, or verify isolation | Single repo owns the whole plan |\n| **2. Module** | Build\u002Fdependency unit (`go.mod`, `package.json`, …) | Own build\u002Ftests\u002Fpublish or clear API boundary | One module only, or cross-module work is thin glue later |\n| **3. Package** | Package\u002Fdir as **unit of work**, not every file | Different deps\u002Fowners\u002Frisk and separate exit criteria | Related packages form one vertical slice |\n\n**Do not** split below package level (per-function \u002F per-helper \u002F per-file) unless exit\ncriteria and risk truly diverge — that is the main anti-pattern this skill avoids.\n\n## Splitting heuristics\n\n| Prefer earlier | Prefer later |\n|----------------|--------------|\n| Work confined to one git root | Cross-repo integration |\n| Foundational module \u002F API surface | Consumer modules |\n| Core package under a module | Wiring packages \u002F apps |\n| Pure functions, types, contracts | UI polish, docs, telemetry\u002Fevents |\n| Public surface + validation (flags, API) | Full orchestration |\n| Read-only plan\u002Fanalyze paths | Mutating apply paths |\n| Happy path | Exhaustive edge-case tests |\n| Stub-able seams | End-to-end product UX |\n\n**Smell → merge (prefer this when in doubt):**\n\n- Phase is only types + one helper with no standalone product value\n- Two phases share the same package and the same exit command\n- Phase would be a tiny tightly coupled set that cannot verify alone\n- “Part 1 \u002F Part 2” of the same package with no independent exit criteria\n- Padding to reach 3 phases when 2 already cover the plan\n\n**Smell → split further:**\n\n- Mixed unrelated risks across **boundaries** (e.g. two git roots, or module API + unrelated consumer rewrite)\n- Phase needs types\u002FAPIs from a later phase → extract foundation phase or reorder\n- No exit criteria → not a phase yet; merge or refine\n- “Implement engine and wire CLI and write all docs” **and** those span different modules\u002Fpackages with separate verify paths\n\n**Exit criteria quality bar:**\n\n- Prefer **rerunnable** checks (doctests, unit tests, CLI assertions)\n- Manual checks OK when automation is disproportionate — still write them as explicit steps\n- “Looks good” alone is not enough; say what to observe\n\n## Examples of good vs bad phases\n\n**Bad (too small — same package shredded):**  \nP1: add type `Foo` · P2: add `ValidateFoo` · P3: add `ParseFoo` — all one package.\n\n**Good:** one phase “`foo` package: types + parse + validate + tests.”\n\n**Bad:** “P2: implement the feature.” \u002F “P4: finish everything left.”\n\n**Good:** “P2: pure `IsFoo` helpers + table tests inside package `foo`; no I\u002FO.”  \n(OK as a phase only if that package\u002Fslice is the whole unit — do not also split parse\u002Fvalidate next door into more phases.)\n\n**Bad (ignores boundary):** one phase edits two git repos + three modules with a single exit criterion.\n\n**Good (multi-boundary, still on budget):**  \nP1: repo A \u002F module `core` packages for the API → P2: repo A \u002F module `cli` wiring →  \nP3: repo B consumer → P4: cross-repo integration \u002F e2e.  \n(4 phases — within 3–5.)\n\n**Good (small plan):** 2 phases — core package + thin CLI wire.  \nPhase-budget note: “2 phases: single-module plan.”\n\n## Persistence\n\n- Default: **chat only**\n- Write `PHASES.md` or similar **only when the user explicitly asks** to save the plan\n\n## Stop condition\n\nAfter delivering the phase plan (and optional file **if requested**), **stop**.\n\nDo not implement the underlying work under this skill. Implementation is a separate\nuser instruction naming the phase(s) to do.\n",{"name":5,"description":7},"master","d5d5361083d4adf0dd8a15272123af778b38117a","agents\u002Fsplit-phases\u002Frun",0,"https:\u002F\u002Fgithub.com\u002Fxhd2015\u002Fagent-pro","https:\u002F\u002Fgithub.com\u002Fxhd2015","https:\u002F\u002Fblog.xhd2015.xyz","@Harbin Institute of Technology","2026-11-12 07:05:51",{"source":8,"skillName":5,"commands":33,"prompt":43,"zipAvailable":44},[34,37,40],{"tool":35,"command":36},"npx","npx skills add xhd2015\u002Fagent-pro --skill split-phases",{"tool":38,"command":39},"bunx","bunx skills add xhd2015\u002Fagent-pro --skill split-phases",{"tool":41,"command":42},"pnpm","pnpm dlx skills add xhd2015\u002Fagent-pro --skill split-phases","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002Fxhd2015\u002Fagent-pro\u002Fblob\u002Fmaster\u002Fagents\u002Fsplit-phases\u002Frun\u002FSKILL.md",true,[46],{"path":47,"resourceType":48,"resourceTypeDesc":49,"sizeBytes":50,"sourceHtmlUrl":51},"split_phases.go","SCRIPT","脚本",72,"https:\u002F\u002Fgithub.com\u002Fxhd2015\u002Fagent-pro\u002Fblob\u002Fmaster\u002Fagents\u002Fsplit-phases\u002Frun\u002Fsplit_phases.go",[53,60,67,74,81,88],{"skillNo":54,"name":55,"nameZh":6,"description":56,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":57,"categories":58,"keywords":59,"publishedAt":18},"01M752V7X3HGMWGCPSWMG498TY","verify-with-prototype","Prototype-before-production workflow for risky host integrations (sudo, privileges, system config). Use when a feature touches the real OS, when behavior must be proven with a small script before full implementation, or when the user mentions prototype verification, POC script, or verify-with-prototype. Run after investigate\u002Ffollowup and before doctest-TDD integration.","https:\u002F\u002Fgithub.com\u002Fxhd2015\u002Fagent-pro\u002Fblob\u002Fmaster\u002Fagents\u002Fverify-with-prototype\u002Frun\u002FSKILL.md",[],[],{"skillNo":61,"name":62,"nameZh":6,"description":63,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":64,"categories":65,"keywords":66,"publishedAt":18},"01M752V363XA61Q2PSVS0W9M3H","verify-on-behalf-of-user","Run human-style scenario verification after an agent claims work is done: git status, build into ~\u002F.sandbox\u002Fbin (default sandbox mode) or opt-in host mode (outside sandbox: wrk --reinstall-local \u002F change-scoped install), real integration\u002FE2E scenarios (start servers, browser-agent for UI), always-labeled depth, markdown transcript written and inlined for review. Use for \"verify on my behalf\", before commit. Complements doctests; does not replace them. Load a sub-topic with: agent-pro skill --show verify-on-behalf-of-user\u002F\u003Ctopic>","https:\u002F\u002Fgithub.com\u002Fxhd2015\u002Fagent-pro\u002Fblob\u002Fmaster\u002Fagents\u002Fverify-on-behalf-of-user\u002Frun\u002FSKILL.md",[],[],{"skillNo":68,"name":69,"nameZh":6,"description":70,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":71,"categories":72,"keywords":73,"publishedAt":18},"01M752TVN3Y9ZMKW52A8MKZ3QP","test-case-tree-design-expert","Use when the user wants a decision-tree style test case design with inherited setup and per-leaf assertions.","https:\u002F\u002Fgithub.com\u002Fxhd2015\u002Fagent-pro\u002Fblob\u002Fmaster\u002Fagents\u002Ftest-case-tree-design-expert\u002FSKILL.md",[],[],{"skillNo":75,"name":76,"nameZh":6,"description":77,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":78,"categories":79,"keywords":80,"publishedAt":18},"01M752TSECEXD80J650BC6YXMY","test-case-design-expert","Use when the user wants comprehensive user-facing end-to-end test scenarios for a feature description.","https:\u002F\u002Fgithub.com\u002Fxhd2015\u002Fagent-pro\u002Fblob\u002Fmaster\u002Fagents\u002Ftest-case-design-expert\u002FSKILL.md",[],[],{"skillNo":82,"name":83,"nameZh":6,"description":84,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":85,"categories":86,"keywords":87,"publishedAt":18},"01M752TQB00WQJ9475GF0JVEGY","tdd-expert","Use when the user has a test-case-tree output and wants runnable Go tests plus stub implementation following Test-Driven Development.","https:\u002F\u002Fgithub.com\u002Fxhd2015\u002Fagent-pro\u002Fblob\u002Fmaster\u002Fagents\u002Ftdd-expert\u002FSKILL.md",[],[],{"skillNo":89,"name":90,"nameZh":6,"description":91,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":92,"categories":93,"keywords":94,"publishedAt":18},"01M752TGQ1905Y0FTCTQPMJTA7","summarize-a-skill","Meta-skill: distill durable high-signal guidance (worked vs failed, wrong → correct, and anything else that quickens future similar tasks) into a brief reusable skill document with YAML frontmatter. When the user does not explicitly ask for a new skill\u002Ffile, prefer updating an existing skill over creating one. Writes skills\u002F\u003Cname>\u002FSKILL.md (or docs|doc\u002Fskills\u002F…). Use for \u002Fsummarize-a-skill, \"summarize what worked\", \"lessons learned into a skill\", or \"write a skill from this session\".","https:\u002F\u002Fgithub.com\u002Fxhd2015\u002Fagent-pro\u002Fblob\u002Fmaster\u002Fagents\u002Fsummarize-a-skill\u002Frun\u002FSKILL.md",[],[]]