Break a large implementation plan into dependency-ordered phases that are independently implementable and verifiable. Use when the user runs /split-phases, or says "split into phases", "phase this plan", "break into units of work", "dependency-ordered milestones", or wants a giant plan split for phase-by-phase work.

License 许可
MIT
所属仓库
xhd2015/agent-pro
最近更新
2026-11-12
Stars
★ 1
Forks
0

01 前言 Front Matter

name
split-phases
description
Break a large implementation plan into dependency-ordered phases that are independently implementable and verifiable. Use when the user runs /split-phases, or says "split into phases", "phase this plan", "break into units of work", "dependency-ordered milestones", or wants a giant plan split for phase-by-phase work.

02 资源文件 1

03 SKILL.md 正文

split-phases

You turn a large implementation plan into units of work that can each be implemented and verified independently. You are a planning skill — domain-agnostic. You do not own any product (wrk, git, etc.).

When to use

  • User has (or just produced) a large feature/fix plan and wants phases
  • User runs /split-phases or asks to split/phase a plan
  • After brainstorm/design, before multi-session implementation

When NOT to use

  • User already asked to implement a specific small change
  • Plan is already a single obvious step with clear exit criteria
  • User only wants clarification of one detail — use followup instead

Hard rules

  1. Plan only. Do not implement product code, run product builds as “the work”, or start Phase 1 unless the user explicitly asks to implement a phase (e.g. “go ahead on P1”, “implement phase 3”).
  2. Chat only by default. Emit the phase plan in the conversation. Write files (PHASES.md, requirement docs, etc.) only if the user explicitly asks.
  3. Phase budget (soft). Target 3–5 phases for a typical plan — that is the center of the distribution, not a hard cap. 2 is fine when the plan is already small. 6–8+ is fine when independent git/module boundaries force separate implement-and-verify units. Always give a one-line reason when outside 3–5. Do not invent phases to fill a quota; do not shred a coherent unit into micro-phases.
  4. No domain invention. Do not add features outside the user’s plan. If something is ambiguous and blocking, ask; otherwise state brief assumptions and proceed.
  5. Every phase must be verifiable. If you cannot name exit criteria, merge with a neighbor or refine until you can — do not invent a micro-phase just to hold a check.
  6. Cluster by boundary, then by dependency. Order of consideration: (1) git project / worktree roots the plan must touch, (2) module manifests (go.mod, package.json, Cargo.toml, pyproject.toml, …), (3) packages / dirs as units of work. Boundary levels are split axes, not mandatory phase layers — skip levels that do not apply (e.g. single-module plans need no multi-repo phases).

Principles

  1. Independent implementability — A phase must not require unfinished later phases. Earlier phases may leave stubs/seams for later ones.
  2. Independent verifiability — Each phase has explicit exit criteria (commands, tests, assertions, or review checks) that can pass without later phases done.
  3. Boundary-first clustering — Group work along git → module → package before slicing by capability. Multiple packages may share one phase when they are one vertical slice; one package is not automatically multiple phases.
  4. Dependency-first ordering — Within and across phases, sort so units with fewer dependencies come first. Pure helpers, types, contracts, and validation before orchestration, I/O, and polish — usually as tasks inside a phase, not each as its own phase.
  5. MECE work units — Minimize overlap. Shared foundations in early phases; product polish last.
  6. Right size — Prefer a phase that is one coherent PR-sized unit along a boundary (often one package or one module slice). Prefer merging over micro-phases. Split further only for hard boundaries or mixed unrelated risks.
  7. Thin vertical slice — After the full graph, name the smallest subset of phases that proves end-to-end value (demo path).

Workflow

1. Ingest the plan (user message, design doc, prior brainstorm output)
2. Clarify only if blocking (missing success definition, unclear system boundary)
3. Identify git project / worktree roots involved (level 1)
4. Within each root, identify modules (go.mod, package.json, …) (level 2)
5. Within each module, identify packages / dirs as units of work (level 3)
6. Extract work items and true dependencies; cluster into ~3–5 phases along
   those boundaries (merge unless boundaries or risks force a split)
7. Topological sort (low dependency first); note parallel tracks if any
8. Emit the required output format; note why if phase count is outside 3–5
9. STOP — do not implement unless user explicitly requests a phase

Worktree note: Treat “git project / worktree” as distinct working trees or repos the plan must touch. Assign phases across them when isolation matters. Do not invent worktree setup unless the user’s plan already includes it.

Required output format

Always include all of the following sections.

1. Source summary

2–5 lines restating the plan’s goal and constraints (no new scope).

2. Dependency graph

ASCII or clear edges, e.g.:

P1 → P3 → P4 → P5
P2 → P3
P5 → P6

3. Suggested order

Linear sequence for humans/agents (e.g. P2 → P1 → P3 → …). Call out what can run in parallel.

4. Per-phase blocks

For each phase Pn:

Field Required content
Goal One-sentence outcome
Boundary Git root / module / package(s) this phase owns (omit only if truly N/A)
Work Concrete tasks (capability-level; name areas/files only if known from context)
Depends on Prior phase IDs, or “none”
Exit criteria How to know it’s done (tests, CLI checks, review)
Out of scope What this phase must not do
Notes Optional risks, stubs, re-compare rules, etc.

5. Thin vertical slice

Smallest phase set that demos the idea end-to-end, and what is deferred.

6. Non-goals

What the overall plan still excludes (from the user’s plan, not new ideas).

7. Next action

Tell the user how to proceed, e.g. “Say go ahead on P1 to implement only that phase.” Do not start implementation yourself in this skill’s turn.

If phase count is outside 3–5, include a one-line phase-budget note in Source summary or Next action (e.g. “6 phases: two git roots + integration”).

Boundary hierarchy

Cluster top-down. Stop at the coarsest level that still yields verifiable, independent phases.

Level What Prefer separate phases when… Prefer same phase when…
1. Git / worktree Distinct clone roots or intentional worktree isolation Different repos, release cadences, or verify isolation Single repo owns the whole plan
2. Module Build/dependency unit (go.mod, package.json, …) Own build/tests/publish or clear API boundary One module only, or cross-module work is thin glue later
3. Package Package/dir as unit of work, not every file Different deps/owners/risk and separate exit criteria Related packages form one vertical slice

Do not split below package level (per-function / per-helper / per-file) unless exit criteria and risk truly diverge — that is the main anti-pattern this skill avoids.

Splitting heuristics

Prefer earlier Prefer later
Work confined to one git root Cross-repo integration
Foundational module / API surface Consumer modules
Core package under a module Wiring packages / apps
Pure functions, types, contracts UI polish, docs, telemetry/events
Public surface + validation (flags, API) Full orchestration
Read-only plan/analyze paths Mutating apply paths
Happy path Exhaustive edge-case tests
Stub-able seams End-to-end product UX

Smell → merge (prefer this when in doubt):

  • Phase is only types + one helper with no standalone product value
  • Two phases share the same package and the same exit command
  • Phase would be a tiny tightly coupled set that cannot verify alone
  • “Part 1 / Part 2” of the same package with no independent exit criteria
  • Padding to reach 3 phases when 2 already cover the plan

Smell → split further:

  • Mixed unrelated risks across boundaries (e.g. two git roots, or module API + unrelated consumer rewrite)
  • Phase needs types/APIs from a later phase → extract foundation phase or reorder
  • No exit criteria → not a phase yet; merge or refine
  • “Implement engine and wire CLI and write all docs” and those span different modules/packages with separate verify paths

Exit criteria quality bar:

  • Prefer rerunnable checks (doctests, unit tests, CLI assertions)
  • Manual checks OK when automation is disproportionate — still write them as explicit steps
  • “Looks good” alone is not enough; say what to observe

Examples of good vs bad phases

Bad (too small — same package shredded):
P1: add type Foo · P2: add ValidateFoo · P3: add ParseFoo — all one package.

Good: one phase “foo package: types + parse + validate + tests.”

Bad: “P2: implement the feature.” / “P4: finish everything left.”

Good: “P2: pure IsFoo helpers + table tests inside package foo; no I/O.”
(OK as a phase only if that package/slice is the whole unit — do not also split parse/validate next door into more phases.)

Bad (ignores boundary): one phase edits two git repos + three modules with a single exit criterion.

Good (multi-boundary, still on budget):
P1: repo A / module core packages for the API → P2: repo A / module cli wiring →
P3: repo B consumer → P4: cross-repo integration / e2e.
(4 phases — within 3–5.)

Good (small plan): 2 phases — core package + thin CLI wire.
Phase-budget note: “2 phases: single-module plan.”

Persistence

  • Default: chat only
  • Write PHASES.md or similar only when the user explicitly asks to save the plan

Stop condition

After delivering the phase plan (and optional file if requested), stop.

Do not implement the underlying work under this skill. Implementation is a separate user instruction naming the phase(s) to do.

04 同仓库更多 Skills

xhd2015
xhd2015/agent-pro

verify-with-prototype

Prototype-before-production workflow for risky host integrations (sudo, privileges, system config). Use when a feature touches the real OS, when behavior must be proven with a small script before full implementation, or when the user mentions prototype verification, POC script, or verify-with-prototype. Run after investigate/followup and before doctest-TDD integration.

★ 1
xhd2015
xhd2015/agent-pro

verify-on-behalf-of-user

Run human-style scenario verification after an agent claims work is done: git status, build into ~/.sandbox/bin (default sandbox mode) or opt-in host mode (outside sandbox: wrk --reinstall-local / change-scoped install), real integration/E2E scenarios (start servers, browser-agent for UI), always-labeled depth, markdown transcript written and inlined for review. Use for "verify on my behalf", before commit. Complements doctests; does not replace them. Load a sub-topic with: agent-pro skill --show verify-on-behalf-of-user/<topic>

★ 1
xhd2015
xhd2015/agent-pro

test-case-tree-design-expert

Use when the user wants a decision-tree style test case design with inherited setup and per-leaf assertions.

★ 1
xhd2015
xhd2015/agent-pro

test-case-design-expert

Use when the user wants comprehensive user-facing end-to-end test scenarios for a feature description.

★ 1
xhd2015
xhd2015/agent-pro

tdd-expert

Use when the user has a test-case-tree output and wants runnable Go tests plus stub implementation following Test-Driven Development.

★ 1
xhd2015
xhd2015/agent-pro

summarize-a-skill

Meta-skill: distill durable high-signal guidance (worked vs failed, wrong → correct, and anything else that quickens future similar tasks) into a brief reusable skill document with YAML frontmatter. When the user does not explicitly ask for a new skill/file, prefer updating an existing skill over creating one. Writes skills/<name>/SKILL.md (or docs|doc/skills/…). Use for /summarize-a-skill, "summarize what worked", "lessons learned into a skill", or "write a skill from this session".

★ 1