pre-mortem

Inverse postmortem. Imagine the future failure; list why; mitigate.

Mode: generative — diverge before converging. Produce genuinely different options first (the obvious answer is one candidate, not the answer), then narrow with stated criteria.

When to use

  • Before committing to a non-trivial plan (Gary Klein's "prospective hindsight").
  • A workflow includes a planning step and the user wants risk uncovering before implementation.

Inputs

  • The plan or PRD under review (required). None given: ask for it.
  • Optionally: a timeline (default: the plan's own launch date + 30 days).

Procedure

  1. Say "It is now <timeline> and the project failed."
  2. Generate 6–10 specific failure stories — each a plausible narrative of how it went wrong, not a risk category. Imagine them before judging them. Range across:
    • Technical (it didn't scale, the migration broke prod, the dependency was abandoned).
    • Organizational (the team owner left, priorities shifted, blocked on another team).
    • User (no adoption, hostile feedback, used it in an unintended way).
    • Operational (alert fatigue, runbook never updated, on-call missed it).
  3. For each, rate likelihood and impact as L / M / H, with a one-line reason drawn from the plan.
  4. Pick the top 3 mechanically: score L=1, M=2, H=3; rank by likelihood × impact, ties broken by higher impact, then by list order. Propose a concrete mitigation for each, and the earliest signal that it is happening.

Output

Pre-mortem: <plan>

Failure modes:
  1. Technical: …            (likelihood: M, impact: H)
  2. Organizational: …       (likelihood: L, impact: H)
  …

Top 3 (likelihood × impact, ties → impact):
  - <failure mode> (M×H = 6): mitigation: … · early signal: …
  - <failure mode> (H×M = 6): mitigation: … · early signal: …
  - <failure mode> (L×H = 3): mitigation: … · early signal: …

Quality bar

  • Specific failure modes — "scaling problems" is not specific; "the rate-limiter store grows linearly per IP" is.
  • At least one failure mode in each of the four ranges above.
  • Mitigations are concrete (a code change, a guardrail, a deferred decision), not "be more careful".