[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M73FZT2YTZ6DGF4F77VJ90FE":3,"skill-same:01M73FZT2YTZ6DGF4F77VJ90FE":74},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":15,"categories":16,"keywords":17,"publishedAt":18,"linkOnly":19,"markdownContent":20,"markdownBody":21,"frontMatter":22,"refName":52,"commitSha":53,"skillDirectory":54,"forksCount":55,"repositoryHtmlUrl":56,"repositoryHomepageUrl":6,"ownerHtmlUrl":57,"ownerBlogUrl":6,"ownerDescription":58,"updatedAt":59,"install":60,"resources":73},"01M73FZT2YTZ6DGF4F77VJ90FE","rolling-stock-maintenance-loto-planner",null,"Plan rolling-stock depot maintenance safety — EMU\u002Fcoach\u002Flocomotive vehicle-movement lockout (wheel chock + derail + brake scotch), bogey heavy-lift rigging, undercarriage pit work, and fall protection from rolling-stock roof. Vehicle-LOTO distinct from fixed-plant LOTO. RSA Art 48 + OSHA Art 92 (LOTO 정지) + OSHA Art 99 (추락 방지 — uncited by existing railway WFs) + SAPA Art 4.","5throck\u002Fai-workspace-standards","5throck","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F10958964?v=4","01M73BFEH0V0VS483TW4JD49JW","01M73BFEJ5VQZJHJSFTVPAZGDM",25,"AGPL-3.0","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-safety\u002Fskills\u002Frolling-stock-maintenance-loto-planner\u002FSKILL.md",[],[],"2026-11-11 15:11:14",false,"---\n\nmirror: false\nlang: ko\nlang_reason: legal\nname: rolling-stock-maintenance-loto-planner\nowner: railway-agent\nscope: co-safety\nstatus: active\ndescription: Plan rolling-stock depot maintenance safety — EMU\u002Fcoach\u002Flocomotive vehicle-movement lockout (wheel chock + derail + brake scotch), bogey heavy-lift rigging, undercarriage pit work, and fall protection from rolling-stock roof. Vehicle-LOTO distinct from fixed-plant LOTO. RSA Art 48 + OSHA Art 92 (LOTO 정지) + OSHA Art 99 (추락 방지 — uncited by existing railway WFs) + SAPA Art 4.\nversion: \"1.0.0\"\ncreated: \"2026-08-07\"\nlast_updated: \"2026-08-07\"\nmetadata:\n  type: domain\n\n  triggers:\n    - 철도 차량사업소 차량 정비 LOTO\n    - rolling stock depot maintenance\n    - EMU 객차 정비 차량 이동 잠금\n    - rolling stock vehicle movement lockout\n    - bogey 대차 리프팅 크레인\n    - bogey heavy lift rigging\n    - 밑바닥 pit 작업 차량 압사\n    - undercarriage pit work crush\n    - 차량 지붕 추락 방지\n    - roof fall prevention rolling stock\n    - 철도 안전관리자 정비 허가\n    - RSA Article 48 철도 보호\n    - OSHA-KR Article 38 추락 방지 포함 안전조치 (전차선)\n    - wheel chock derail brake scotch\n  legal_basis:\n    - \"철도안전법 제48조 (철도 보호 및 질서유지를 위한 금지행위)\"\n    - \"산업안전보건기준에 관한 규칙 제92조 (LOTO — 에너지원 차단·작업 정지)\"\n    - \"산업안전보건법 제38조 (추락 등 안전조치 — 차량 지붕·pit 추락 방지)\"\n    - \"중대재해처벌법 제4조 (사업주 안전보건 확보의무)\"\n---\n\naudit_exception: safety-os-skill-structure — Safety OS skills use the legal_basis-gated SSOT skill format (validated by scripts\u002Fskill-lifecycle-audit.ts and scripts\u002Fvalidate-skills.ts), not the generic template 5-section\u002F7-frontmatter schema\n\n# Rolling Stock Maintenance LOTO Planner Skill\n\n## Overview\n\nRolling-stock depot maintenance safety planner for EMU (Electric Multiple\nUnit), coach, and locomotive work at 차량사업소 (railway depots \u002F light-\nmaintenance facilities) — the MOVING-VEHICLE LOTO hazard face of railway\nmaintenance, distinct from the FIXED-PLANT equipment LOTO covered by\nsteelmaking `molten-metal-loto` and waste `incinerator-shredder-loto`,\nand distinct from the 25kV catenary electrical and track\u002Ftunnel confined-\nspace hazards covered by the two existing railway workflows.\n\nThe railway industry anchor\n(`regulations\u002FKR\u002Findustry-regulatory-anchors.yaml` lines 463-501) names\n**철도안전법 (RSA) Article 48 (철도 보호 및 질서유지를 위한 금지행위)** and\n**OSHA-KR Article 38 (추락 등 안전조치 — 전차선\u002F선로 작업)** in the primary\u002Fadjacent\nstatute blocks — cited by ZERO existing railway workflows prior to the\n`railway-rolling-stock-maintenance-loto` workflow (Task C-1b, 2026-08-07).\nThe anchor also names **OSHA-KR Article 38 (감전 등 안전조치)** for the\ncatenary-adjacent depot work. This skill operationalizes RSA Art 48 +\nOSHA Art 92 (LOTO 정지 — 안전보건기준에관한규칙 Art 92, per existing\ncodebase convention) + OSHA Art 38 into a deployable depot-maintenance\nsafety plan.\n\n## Korean Railway Depot Context\n\n### Why rolling-stock vehicle-LOTO is distinct\n\n| Factor | Fixed-plant LOTO (incinerator, furnace) | Rolling-stock vehicle LOTO (this skill) |\n|--------|------------------------------------------|------------------------------------------|\n| Isolation target | Fixed equipment (motor, valve) | MOVING VEHICLE (EMU car, locomotive) |\n| Energy sources | Electrical, pneumatic, thermal | Kinetic (roll), pneumatic (brake), electrical (catenary\u002Fpantograph), gravity (bogey lift) |\n| Lockout means | Breaker + tag + verify | Wheel chock + derail + brake scotch + pantograph down + catenary dead |\n| Re-positioning risk | None (equipment is bolted down) | HIGH — vehicle can roll if any isolation fails |\n| Co-existent work | Generally one trade at a time | Bogey team UNDER car + roof team ON car + pit team BENEATH floor — concurrent |\n| Fall hazard geometry | Grade-level | Roof access (4 m+ fall) + pit access (2 m+ fall into pit) |\n\nA rail vehicle is not \"de-energized\" in the fixed-plant sense — it can\nmove under gravity (grade), residual brake-pressure release, or pantograph-\ndriven traction. Vehicle-LOTO therefore requires POSITIVE mechanical\nrestraint (wheel chocks, derails, brake scotches) layered on top of\nelectrical\u002Fpneumatic isolation. This is the only skill in the codebase\nthat plans lockout of a MOVING VEHICLE.\n\n### Hazard profile (from railway regulatory anchor)\n\n- **RSA Art 48** (UNCITED by rolling-stock WF; rail-track WF cites it but\n  for track work) — 철도 보호 및 질서유지를 위한 금지행위: prohibits\n  interference with railway vehicles and structures; basis for depot\n  vehicle-movement control\n- **OSHA-KR Art 92** (LOTO 정지 — 안전보건기준에관한규칙 Art 92, per existing\n  codebase convention `산업안전보건법 Article 92`) — hazardous-energy\n  isolation; applied here to kinetic + pneumatic + electrical energy of a\n  rail vehicle\n- **OSHA-KR Art 38** (corrected anchor, 2026-08-24; in anchor\n  adjacent_laws) — 추락 방지: fall prevention for roof access and pit\n  access during depot work\n- **OSHA-KR Art 38** (in anchor adjacent_laws) — 감전 등 안전조치: electrical\n  hazard for catenary-adjacent \u002F pantograph work\n- **SAPA Art 4** — 사업주 안전보장 의무: universal safety-assurance\n  obligation\n\n## Hazard Scenarios Covered\n\n### 1. Vehicle-movement \u002F roll-away during undercarriage work\n\n- EMU car stopped at depot track; pit worker under floor for brake-\n  cylinder inspection\n- Brake-pressure release or grade-induced roll — worker crushed by wheel\n  or undercarriage equipment\n- The signature depot fatal-incident class in Korea (KORAIL \u002F Seoul Metro\n  depot history)\n\n### 2. Bogey (대차) heavy-lift rigging failure\n\n- Bogey removed from under carbody using overhead crane (15-25 tonne\n  bogey); carbody supported on stands\n- Rigging sling failure or stand collapse — carbody drops onto workers\n- Crane-loads overhead simultaneously (dual lifting hazard)\n\n### 3. Roof access fall (pantograph \u002F air-conditioner \u002F roof equipment)\n\n- Worker climbs onto EMU roof (~4 m above rail level) for pantograph\n  inspection or AC-unit service\n- No fall-protection anchor point on curved roof — fall-to-grade\n- Catenary adjacent on same track — co-existent electrical hazard\n  (OSHA Art 38 + OSHSR 전기기준)\n\n### 4. Pit access fall + confined-space edge\n\n- Pit entry for underfloor inspection (battery box, compressor, traction\n  motor)\n- Pit-access ladder failure or edge fall (~2 m) into pit\n- Pit confined-space atmosphere (residual solvent \u002F welding fume from\n  adjacent bay)\n\n### 5. Pantograph \u002F catenary residual-energy (depot track)\n\n- Depot tracks often have overhead catenary for test movements; pantograph\n  up = 25kV exposure\n- Worker on roof near raised pantograph — arc-flash + electrocution\n- Adjacent track live while depot track isolated — co-existent electrical\n\n### 6. Concurrent multi-trade conflict\n\n- Bogey team (under carbody) + roof team (on carbody) + pit team\n  (beneath floor) + interior team (inside cabin) all working one EMU\n  simultaneously\n- Any one team's energy-isolation failure endangers the others\n\n## Rolling-Stock Vehicle-LOTO Hierarchy (depot-specific)\n\n### 1. Elimination\n\n- Engineer-out the hazard: automated bogey-drop tables (no overhead\n  crane lift) where economically feasible\n- Remote pantograph inspection cameras (eliminate roof access for routine\n  checks)\n- Track-movable depots (vehicle stays on one track for the full\n  maintenance cycle, eliminating inter-bay movements)\n\n### 2. Engineering controls (preferred over PPE)\n\n- **Wheel chocks** at both ends of every isolated axle (positive\n  mechanical roll-restraint) — verified chock-to-rail contact\n- **Portable derails** placed on the depot track at both ends of the\n  isolated vehicle (prevents a vehicle from adjacent track entering the\n  work zone)\n- **Brake scotch \u002F parking-brake lock** — mechanical brake-application\n  lock to prevent brake-pressure release\n- **Pantograph lock-down** — pantograph physically clamped in down\n  position; catenary on isolated track de-energized and grounded per\n  existing catenary-high-voltage-safety WF\n- **Bogey-lift crane with anti-drop valve** — hydraulic check valve\n  prevents uncontrolled descent on hose failure\n- **Carbody stands with mechanical lock pin** — positive mechanical\n  support, not hydraulic-only\n- **Roof-edge fall-protection guardrail system** (deployable on depot\n  roof-access platforms, NOT on the carbody itself)\n- **Pit-edge fall protection** — removable guardrails at pit access\n  openings\n\n### 3. Administrative controls\n\n- **작업허가서 (work permit)** per OSHA Art 92 for every depot maintenance\n  job — isolated-vehicle permit issued by depot 안전관리자 before work\n  begins\n- **Vehicle-movement lockout log** — wheel-chock installed-by \u002F verified-\n  by \u002F removed-by sign-off trail\n- **Multi-trade coordination briefing** — single depot supervisor\n  coordinates all concurrent trades on one EMU; no trade begins until all\n  isolations confirmed\n- **Catenary isolation certificate** — for any roof work, depot catenary\n  on the isolated track grounded per catenary-high-voltage-safety WF\n- **Bogey-lift plan** — rigging diagram, crane capacity verification,\n  exclusion zone, signed by lifting engineer\n- **TBM (tool-box meeting)** before each shift — see shared TBM workflow\n- **Fall-protection plan** per OSHA Art 38 for any roof \u002F pit access\n\n### 4. PPE\n\n- **Full-body harness with double lanyard** for all roof access (100%\n  tie-off on carbody) — anchored to depot-rated anchor point, NOT to\n  carbody hand-hold (which is not rated for fall arrest)\n- **Hard hat with chin strap** (wind blast from passing train on\n  adjacent track)\n- **Steel-toe safety boots** for pit work + bogey zone (heavy dropped-\n  object hazard)\n- **High-visibility vest** (depot has active vehicle movements on other\n  tracks)\n- **Dielectric gloves Class 2** if catenary-adjacent work cannot be\n  avoided (per OSHA Art 38 + OSHSR)\n- **Hearing protection** in bogey-test bay (post-maintenance test runs)\n\n## Planning Workflow\n\n1. **Vehicle identification + depot track assignment** — EMU\u002Fcoach\u002F\n   locomotive road number, depot track, isolated-track confirmation\n2. **Energy-source inventory** — kinetic (roll), pneumatic (brake),\n   electrical (catenary\u002Fpantograph), gravity (bogey-lift\u002Fcarbody-stands),\n   co-existent adjacent-track energy\n3. **Vehicle-movement LOTO** — wheel chocks both-ends + portable derails\n   both-ends + brake scotch + parking-brake lock; verified by depot\n   안전관리자\n4. **Catenary isolation (if roof work or pantograph work)** — depot\n   catenary on isolated track de-energized, grounded, danger-tagged per\n   catenary-high-voltage-safety WF\n5. **Bogey-lift plan (if bogey work)** — rigging diagram, crane capacity\n   vs bogey weight, carbody stand placement, exclusion zone\n6. **Roof-access fall-protection plan (if roof work)** — anchor point\n   selection, 100% tie-off procedure, rescue plan per OSHA Art 38\n7. **Pit-access plan (if underfloor work)** — pit-edge guardrails, ladder\n   condition, pit atmosphere check\n8. **Multi-trade coordination briefing** — single supervisor sequences\n   all concurrent trades; energy-isolation confirmation before each trade\n   begins\n9. **작업허가서 issuance per OSHA Art 92** — depot 안전관리자 signs the\n   consolidated permit covering all isolations\n10. **TBM + execution** — tool-box meeting conducted, work proceeds under\n    the single supervisor\n11. **Post-work restoration** — all tools\u002Faccountability verified out,\n    vehicle-movement LOTO removed in reverse order (brake release last),\n    catenary re-energized per catenary WF sequence, vehicle released for\n    test movement\n12. **Emergency response plan** — vehicle-roll rescue (extract without\n    re-energizing catenary), bogey-drop extraction, 119 dispatch, incident\n    reporting per OSHA-KR Art 57\n\n## Output\n\n```json\n{\n  \"plan_id\": \"rail-rsml-2026-08-07-001\",\n  \"depot\": \"Seoul Metro Gunja Depot Bay 3\",\n  \"vehicle\": \"EMU Car 3815-set, Road Number 3815-3\",\n  \"track\": \"Depot Track 7 (isolated)\",\n  \"task_type\": \"bogey_removal_and_pit_inspection\",\n  \"energy_sources\": [\"kinetic_roll\", \"pneumatic_brake\", \"catenary_25kv_adjacent\", \"gravity_bogey_lift\"],\n  \"adjacent_track_live\": false,\n  \"workers_by_trade\": {\n    \"bogey_team\": 3,\n    \"pit_team\": 2,\n    \"roof_team\": 0\n  },\n  \"vehicle_movement_loto\": {\n    \"wheel_chocks_axles\": [1, 4],\n    \"derails_installed\": [\"track_north_end\", \"track_south_end\"],\n    \"brake_scotch\": \"verified_installed\",\n    \"parking_brake_lock\": \"engaged\",\n    \"install_verified_by\": \"depot_supervisor_이안전\"\n  },\n  \"catenary_isolation\": {\n    \"required_for_this_job\": false,\n    \"reason\": \"no_roof_no_pantograph_work\"\n  },\n  \"bogey_lift_plan\": {\n    \"crane_capacity_t\": 30,\n    \"bogey_weight_t\": 18.5,\n    \"safety_factor\": 1.62,\n    \"anti_drop_valve\": true,\n    \"carbody_stands_lock_pin\": \"verified\",\n    \"rigging_diagram_ref\": \"DEPOT-RIG-2026-3815-3\"\n  },\n  \"administrative\": {\n    \"permit_issued_per_osha_art92\": true,\n    \"permit_id\": \"WP-DEPOT-2026-08-07-0142\",\n    \"depot_safety_manager_signoff\": true,\n    \"multi_trade_coordinator\": \"supervisor_김현\",\n    \"tbm_conducted\": true\n  },\n  \"fall_protection_plan\": {\n    \"roof_work\": false,\n    \"pit_work\": {\n      \"edge_guardrails\": true,\n      \"ladder_inspected\": true,\n      \"pit_atmosphere_check\": \"19.5_23.5_pct_O2_pass\"\n    }\n  },\n  \"ppe\": {\n    \"harness_double_lanyard_roof_team\": \"n_a_no_roof_work\",\n    \"steel_toe_boots\": true,\n    \"high_vis_vest\": true,\n    \"hearing_protection_test_bay\": true\n  },\n  \"rescue_plan_ref\": \"DEPOT-ERP-2026-vehicle-roll\",\n  \"regulatory_basis\": [\n    \"철도안전법 (RSA) Article 48 — 철도 보호 및 질서유지를 위한 금지행위\",\n    \"산업안전보건법 (OSHA-KR) Article 92 — LOTO 정지 (안전보건기준에관한규칙 제92조, codebase convention)\",\n    \"산업안전보건법 (OSHA-KR) Article 38 — 추락 등 위해 방지 안전조치 (전차선\u002F선로\u002F차량 작업)\",\n    \"산업안전보건기준에관한규칙 — 감전 등 전기 재해 방지 기준 (25kV 전차선 인접)\",\n    \"중대재해처벌법 (SAPA) Article 4 — 사업주 안전보장 의무\"\n  ],\n  \"acceptance_status\": \"ready_to_execute\"\n}\n```\n\n## Korean-Specific Standards\n\n- **철도안전법 (RSA) Article 48** — 철도 보호 및 질서유지를 위한 금지행위\n  (basis for depot vehicle-movement control; restricts interference with\n  railway vehicles)\n- **산업안전보건법 (OSHA-KR) Article 92** — LOTO 정지 (hazardous-energy\n  isolation; cited per existing codebase convention — technically in\n  안전보건기준에관한규칙 Art 92, followed for consistency with existing\n  `incinerator-shredder-loto` and `molten-metal-loto` schemas)\n- **산업안전보건법 (OSHA-KR) Article 38** — 추락 등 안전조치 (fall prevention;\n  UNCITED by existing railway WFs — this skill newly activates it for\n  roof and pit access)\n- **안전보건기준에관한규칙 (OSHSR)** — 감전 등 전기 재해 방지 기준 (electrical-\n  hazard prevention; co-existent catenary-adjacent work)\n- **KORAIL \u002F Seoul Metro depot 안전관리자** — every depot has a named\n  안전관리자 who MUST countersign the 작업허가서 and verify vehicle-\n  movement LOTO before any undercarriage \u002F pit \u002F bogey work begins\n- **118 (철도종합상황실) + 119** — depot rescue pathway; vehicle-roll\n  rescue must NOT re-energize catenary; coordinated with 철도종합상황실\n- **Railway-specific**: Korea's urban-metro depots (Seoul Metro, KORAIL,\n  Busan Transportation Corporation) operate EMU fleets with nightly\n  light-maintenance cycles — the bogey\u002Fpit\u002Froof work is routine, high-\n  frequency, and the re-positioning risk is ever-present on graded depot\n  tracks\n\n## Integration\n\n- **Input from**: depot maintenance work-order, EMU\u002Floco road number,\n  depot track assignment, bogey-lift crane specification\n- **Output to**: `railway-railway-rolling-stock-maintenance-loto-record.json`\n  (the evidence model for the `railway-rolling-stock-maintenance-loto`\n  workflow at `workflows\u002Fdomains\u002Findustry\u002Frailway\u002Frailway-rolling-stock-maintenance-loto\u002F`)\n- **Coordinated skills**:\n  - `permit-to-work` (daily) — issues the 작업허가서 that this plan\n    references per OSHA Art 92\n  - `psm-loto` (psm) — generic LOTO procedure; this skill SPECIALIZES it\n    for a MOVING VEHICLE (wheel chocks + derails + brake scotch on top of\n    electrical\u002Fpneumatic isolation — fixed-plant LOTO has no equivalent\n    of wheel chocks or derails)\n  - `fall-hazard-assessor` (ehsconst) — generic fall-hazard assessment;\n    this skill specializes for the curved-roof \u002F pit-edge geometry of a\n    rail vehicle\n  - `tool-box-meeting` (TBM) — pre-work briefing record\n- **Escalation**: If wheel chocks cannot achieve positive rail-contact\n  (wet\u002Foily rail, steep depot grade), OR bogey-lift crane capacity is\n  within 1.25x of bogey weight (insufficient safety factor), OR adjacent-\n  track catenary cannot be confirmed de-energized for roof work, halt the\n  job and escalate to depot 안전관리자 + 철도종합상황실 before proceeding.\n  No PPE-only fallback exists for vehicle-movement isolation failure.\n\n## Non-Duplication Justification\n\nvs. `catenary-high-voltage-safety` (existing railway WF): that addresses\nthe 25kV ELECTRICAL hazard of the overhead catenary during maintenance\n(RSA Art 45 + ESCA Art 16). This skill addresses the MECHANICAL \u002F\nvehicle-movement hazard of the rail vehicle itself in the depot —\ndifferent energy class (kinetic + pneumatic + gravity vs. electrical),\ndifferent work location (depot track vs. catenary), different isolation\ndiscipline (wheel chocks + derails vs. breaker + ground strap). The two\nskills coordinate when roof work requires catenary de-energization (this\nskill REFERENCES the catenary WF, does not duplicate it).\n\nvs. `rail-track-confined-maintenance` (existing railway WF): that\naddresses TRACK + TUNNEL work (RSA Art 48 for track protection + OSHA\nArt 38). This skill addresses VEHICLE work in the DEPOT — the WF is on\nthe rail vehicle, not on the track. Different hazard (vehicle roll \u002F\nbogey drop \u002F roof fall vs. train-approach struck-by \u002F tunnel asphyxia).\n\nvs. `psm-loto` (psm domain): that addresses FIXED-PLANT equipment LOTO\n(vessel, pump, valve). This skill addresses MOVING-VEHICLE LOTO — the\nonly skill in the codebase that locks out a rail vehicle against\naccidental movement. The isolation physics are fundamentally different\n(positive mechanical restraint layered on electrical\u002Fpneumatic isolation\nvs. electrical\u002Fpneumatic isolation alone).\n\nvs. `molten-metal-loto` (steelmaking) and `incinerator-shredder-loto`\n(waste): both are FIXED-PLANT equipment LOTO. This skill is MOVING-\nVEHICLE LOTO — distinct isolation discipline as described above.\n\n## Legal Disclaimer\n\n> 자동화 계획 보조. 최종 차량 정비 안전 조치 결정은 차량사업소 안전관리자 +\n> 철도운영기관 안전책임자 권한 per 철도안전법 (RSA) Article 48 and\n> 산업안전보건법 (OSHA-KR) Article 92 + Article 38 (+안전보건기준에관한규칙). Wheel-\n> chock-to-rail contact, bogey-lift rigging capacity, and catenary\n> isolation MUST be verified by the depot 안전관리자 and a qualified lifting\n> engineer before any undercarriage, pit, bogey, or roof work begins.\n","audit_exception: safety-os-skill-structure — Safety OS skills use the legal_basis-gated SSOT skill format (validated by scripts\u002Fskill-lifecycle-audit.ts and scripts\u002Fvalidate-skills.ts), not the generic template 5-section\u002F7-frontmatter schema\n\n# Rolling Stock Maintenance LOTO Planner Skill\n\n## Overview\n\nRolling-stock depot maintenance safety planner for EMU (Electric Multiple\nUnit), coach, and locomotive work at 차량사업소 (railway depots \u002F light-\nmaintenance facilities) — the MOVING-VEHICLE LOTO hazard face of railway\nmaintenance, distinct from the FIXED-PLANT equipment LOTO covered by\nsteelmaking `molten-metal-loto` and waste `incinerator-shredder-loto`,\nand distinct from the 25kV catenary electrical and track\u002Ftunnel confined-\nspace hazards covered by the two existing railway workflows.\n\nThe railway industry anchor\n(`regulations\u002FKR\u002Findustry-regulatory-anchors.yaml` lines 463-501) names\n**철도안전법 (RSA) Article 48 (철도 보호 및 질서유지를 위한 금지행위)** and\n**OSHA-KR Article 38 (추락 등 안전조치 — 전차선\u002F선로 작업)** in the primary\u002Fadjacent\nstatute blocks — cited by ZERO existing railway workflows prior to the\n`railway-rolling-stock-maintenance-loto` workflow (Task C-1b, 2026-08-07).\nThe anchor also names **OSHA-KR Article 38 (감전 등 안전조치)** for the\ncatenary-adjacent depot work. This skill operationalizes RSA Art 48 +\nOSHA Art 92 (LOTO 정지 — 안전보건기준에관한규칙 Art 92, per existing\ncodebase convention) + OSHA Art 38 into a deployable depot-maintenance\nsafety plan.\n\n## Korean Railway Depot Context\n\n### Why rolling-stock vehicle-LOTO is distinct\n\n| Factor | Fixed-plant LOTO (incinerator, furnace) | Rolling-stock vehicle LOTO (this skill) |\n|--------|------------------------------------------|------------------------------------------|\n| Isolation target | Fixed equipment (motor, valve) | MOVING VEHICLE (EMU car, locomotive) |\n| Energy sources | Electrical, pneumatic, thermal | Kinetic (roll), pneumatic (brake), electrical (catenary\u002Fpantograph), gravity (bogey lift) |\n| Lockout means | Breaker + tag + verify | Wheel chock + derail + brake scotch + pantograph down + catenary dead |\n| Re-positioning risk | None (equipment is bolted down) | HIGH — vehicle can roll if any isolation fails |\n| Co-existent work | Generally one trade at a time | Bogey team UNDER car + roof team ON car + pit team BENEATH floor — concurrent |\n| Fall hazard geometry | Grade-level | Roof access (4 m+ fall) + pit access (2 m+ fall into pit) |\n\nA rail vehicle is not \"de-energized\" in the fixed-plant sense — it can\nmove under gravity (grade), residual brake-pressure release, or pantograph-\ndriven traction. Vehicle-LOTO therefore requires POSITIVE mechanical\nrestraint (wheel chocks, derails, brake scotches) layered on top of\nelectrical\u002Fpneumatic isolation. This is the only skill in the codebase\nthat plans lockout of a MOVING VEHICLE.\n\n### Hazard profile (from railway regulatory anchor)\n\n- **RSA Art 48** (UNCITED by rolling-stock WF; rail-track WF cites it but\n  for track work) — 철도 보호 및 질서유지를 위한 금지행위: prohibits\n  interference with railway vehicles and structures; basis for depot\n  vehicle-movement control\n- **OSHA-KR Art 92** (LOTO 정지 — 안전보건기준에관한규칙 Art 92, per existing\n  codebase convention `산업안전보건법 Article 92`) — hazardous-energy\n  isolation; applied here to kinetic + pneumatic + electrical energy of a\n  rail vehicle\n- **OSHA-KR Art 38** (corrected anchor, 2026-08-24; in anchor\n  adjacent_laws) — 추락 방지: fall prevention for roof access and pit\n  access during depot work\n- **OSHA-KR Art 38** (in anchor adjacent_laws) — 감전 등 안전조치: electrical\n  hazard for catenary-adjacent \u002F pantograph work\n- **SAPA Art 4** — 사업주 안전보장 의무: universal safety-assurance\n  obligation\n\n## Hazard Scenarios Covered\n\n### 1. Vehicle-movement \u002F roll-away during undercarriage work\n\n- EMU car stopped at depot track; pit worker under floor for brake-\n  cylinder inspection\n- Brake-pressure release or grade-induced roll — worker crushed by wheel\n  or undercarriage equipment\n- The signature depot fatal-incident class in Korea (KORAIL \u002F Seoul Metro\n  depot history)\n\n### 2. Bogey (대차) heavy-lift rigging failure\n\n- Bogey removed from under carbody using overhead crane (15-25 tonne\n  bogey); carbody supported on stands\n- Rigging sling failure or stand collapse — carbody drops onto workers\n- Crane-loads overhead simultaneously (dual lifting hazard)\n\n### 3. Roof access fall (pantograph \u002F air-conditioner \u002F roof equipment)\n\n- Worker climbs onto EMU roof (~4 m above rail level) for pantograph\n  inspection or AC-unit service\n- No fall-protection anchor point on curved roof — fall-to-grade\n- Catenary adjacent on same track — co-existent electrical hazard\n  (OSHA Art 38 + OSHSR 전기기준)\n\n### 4. Pit access fall + confined-space edge\n\n- Pit entry for underfloor inspection (battery box, compressor, traction\n  motor)\n- Pit-access ladder failure or edge fall (~2 m) into pit\n- Pit confined-space atmosphere (residual solvent \u002F welding fume from\n  adjacent bay)\n\n### 5. Pantograph \u002F catenary residual-energy (depot track)\n\n- Depot tracks often have overhead catenary for test movements; pantograph\n  up = 25kV exposure\n- Worker on roof near raised pantograph — arc-flash + electrocution\n- Adjacent track live while depot track isolated — co-existent electrical\n\n### 6. Concurrent multi-trade conflict\n\n- Bogey team (under carbody) + roof team (on carbody) + pit team\n  (beneath floor) + interior team (inside cabin) all working one EMU\n  simultaneously\n- Any one team's energy-isolation failure endangers the others\n\n## Rolling-Stock Vehicle-LOTO Hierarchy (depot-specific)\n\n### 1. Elimination\n\n- Engineer-out the hazard: automated bogey-drop tables (no overhead\n  crane lift) where economically feasible\n- Remote pantograph inspection cameras (eliminate roof access for routine\n  checks)\n- Track-movable depots (vehicle stays on one track for the full\n  maintenance cycle, eliminating inter-bay movements)\n\n### 2. Engineering controls (preferred over PPE)\n\n- **Wheel chocks** at both ends of every isolated axle (positive\n  mechanical roll-restraint) — verified chock-to-rail contact\n- **Portable derails** placed on the depot track at both ends of the\n  isolated vehicle (prevents a vehicle from adjacent track entering the\n  work zone)\n- **Brake scotch \u002F parking-brake lock** — mechanical brake-application\n  lock to prevent brake-pressure release\n- **Pantograph lock-down** — pantograph physically clamped in down\n  position; catenary on isolated track de-energized and grounded per\n  existing catenary-high-voltage-safety WF\n- **Bogey-lift crane with anti-drop valve** — hydraulic check valve\n  prevents uncontrolled descent on hose failure\n- **Carbody stands with mechanical lock pin** — positive mechanical\n  support, not hydraulic-only\n- **Roof-edge fall-protection guardrail system** (deployable on depot\n  roof-access platforms, NOT on the carbody itself)\n- **Pit-edge fall protection** — removable guardrails at pit access\n  openings\n\n### 3. Administrative controls\n\n- **작업허가서 (work permit)** per OSHA Art 92 for every depot maintenance\n  job — isolated-vehicle permit issued by depot 안전관리자 before work\n  begins\n- **Vehicle-movement lockout log** — wheel-chock installed-by \u002F verified-\n  by \u002F removed-by sign-off trail\n- **Multi-trade coordination briefing** — single depot supervisor\n  coordinates all concurrent trades on one EMU; no trade begins until all\n  isolations confirmed\n- **Catenary isolation certificate** — for any roof work, depot catenary\n  on the isolated track grounded per catenary-high-voltage-safety WF\n- **Bogey-lift plan** — rigging diagram, crane capacity verification,\n  exclusion zone, signed by lifting engineer\n- **TBM (tool-box meeting)** before each shift — see shared TBM workflow\n- **Fall-protection plan** per OSHA Art 38 for any roof \u002F pit access\n\n### 4. PPE\n\n- **Full-body harness with double lanyard** for all roof access (100%\n  tie-off on carbody) — anchored to depot-rated anchor point, NOT to\n  carbody hand-hold (which is not rated for fall arrest)\n- **Hard hat with chin strap** (wind blast from passing train on\n  adjacent track)\n- **Steel-toe safety boots** for pit work + bogey zone (heavy dropped-\n  object hazard)\n- **High-visibility vest** (depot has active vehicle movements on other\n  tracks)\n- **Dielectric gloves Class 2** if catenary-adjacent work cannot be\n  avoided (per OSHA Art 38 + OSHSR)\n- **Hearing protection** in bogey-test bay (post-maintenance test runs)\n\n## Planning Workflow\n\n1. **Vehicle identification + depot track assignment** — EMU\u002Fcoach\u002F\n   locomotive road number, depot track, isolated-track confirmation\n2. **Energy-source inventory** — kinetic (roll), pneumatic (brake),\n   electrical (catenary\u002Fpantograph), gravity (bogey-lift\u002Fcarbody-stands),\n   co-existent adjacent-track energy\n3. **Vehicle-movement LOTO** — wheel chocks both-ends + portable derails\n   both-ends + brake scotch + parking-brake lock; verified by depot\n   안전관리자\n4. **Catenary isolation (if roof work or pantograph work)** — depot\n   catenary on isolated track de-energized, grounded, danger-tagged per\n   catenary-high-voltage-safety WF\n5. **Bogey-lift plan (if bogey work)** — rigging diagram, crane capacity\n   vs bogey weight, carbody stand placement, exclusion zone\n6. **Roof-access fall-protection plan (if roof work)** — anchor point\n   selection, 100% tie-off procedure, rescue plan per OSHA Art 38\n7. **Pit-access plan (if underfloor work)** — pit-edge guardrails, ladder\n   condition, pit atmosphere check\n8. **Multi-trade coordination briefing** — single supervisor sequences\n   all concurrent trades; energy-isolation confirmation before each trade\n   begins\n9. **작업허가서 issuance per OSHA Art 92** — depot 안전관리자 signs the\n   consolidated permit covering all isolations\n10. **TBM + execution** — tool-box meeting conducted, work proceeds under\n    the single supervisor\n11. **Post-work restoration** — all tools\u002Faccountability verified out,\n    vehicle-movement LOTO removed in reverse order (brake release last),\n    catenary re-energized per catenary WF sequence, vehicle released for\n    test movement\n12. **Emergency response plan** — vehicle-roll rescue (extract without\n    re-energizing catenary), bogey-drop extraction, 119 dispatch, incident\n    reporting per OSHA-KR Art 57\n\n## Output\n\n```json\n{\n  \"plan_id\": \"rail-rsml-2026-08-07-001\",\n  \"depot\": \"Seoul Metro Gunja Depot Bay 3\",\n  \"vehicle\": \"EMU Car 3815-set, Road Number 3815-3\",\n  \"track\": \"Depot Track 7 (isolated)\",\n  \"task_type\": \"bogey_removal_and_pit_inspection\",\n  \"energy_sources\": [\"kinetic_roll\", \"pneumatic_brake\", \"catenary_25kv_adjacent\", \"gravity_bogey_lift\"],\n  \"adjacent_track_live\": false,\n  \"workers_by_trade\": {\n    \"bogey_team\": 3,\n    \"pit_team\": 2,\n    \"roof_team\": 0\n  },\n  \"vehicle_movement_loto\": {\n    \"wheel_chocks_axles\": [1, 4],\n    \"derails_installed\": [\"track_north_end\", \"track_south_end\"],\n    \"brake_scotch\": \"verified_installed\",\n    \"parking_brake_lock\": \"engaged\",\n    \"install_verified_by\": \"depot_supervisor_이안전\"\n  },\n  \"catenary_isolation\": {\n    \"required_for_this_job\": false,\n    \"reason\": \"no_roof_no_pantograph_work\"\n  },\n  \"bogey_lift_plan\": {\n    \"crane_capacity_t\": 30,\n    \"bogey_weight_t\": 18.5,\n    \"safety_factor\": 1.62,\n    \"anti_drop_valve\": true,\n    \"carbody_stands_lock_pin\": \"verified\",\n    \"rigging_diagram_ref\": \"DEPOT-RIG-2026-3815-3\"\n  },\n  \"administrative\": {\n    \"permit_issued_per_osha_art92\": true,\n    \"permit_id\": \"WP-DEPOT-2026-08-07-0142\",\n    \"depot_safety_manager_signoff\": true,\n    \"multi_trade_coordinator\": \"supervisor_김현\",\n    \"tbm_conducted\": true\n  },\n  \"fall_protection_plan\": {\n    \"roof_work\": false,\n    \"pit_work\": {\n      \"edge_guardrails\": true,\n      \"ladder_inspected\": true,\n      \"pit_atmosphere_check\": \"19.5_23.5_pct_O2_pass\"\n    }\n  },\n  \"ppe\": {\n    \"harness_double_lanyard_roof_team\": \"n_a_no_roof_work\",\n    \"steel_toe_boots\": true,\n    \"high_vis_vest\": true,\n    \"hearing_protection_test_bay\": true\n  },\n  \"rescue_plan_ref\": \"DEPOT-ERP-2026-vehicle-roll\",\n  \"regulatory_basis\": [\n    \"철도안전법 (RSA) Article 48 — 철도 보호 및 질서유지를 위한 금지행위\",\n    \"산업안전보건법 (OSHA-KR) Article 92 — LOTO 정지 (안전보건기준에관한규칙 제92조, codebase convention)\",\n    \"산업안전보건법 (OSHA-KR) Article 38 — 추락 등 위해 방지 안전조치 (전차선\u002F선로\u002F차량 작업)\",\n    \"산업안전보건기준에관한규칙 — 감전 등 전기 재해 방지 기준 (25kV 전차선 인접)\",\n    \"중대재해처벌법 (SAPA) Article 4 — 사업주 안전보장 의무\"\n  ],\n  \"acceptance_status\": \"ready_to_execute\"\n}\n```\n\n## Korean-Specific Standards\n\n- **철도안전법 (RSA) Article 48** — 철도 보호 및 질서유지를 위한 금지행위\n  (basis for depot vehicle-movement control; restricts interference with\n  railway vehicles)\n- **산업안전보건법 (OSHA-KR) Article 92** — LOTO 정지 (hazardous-energy\n  isolation; cited per existing codebase convention — technically in\n  안전보건기준에관한규칙 Art 92, followed for consistency with existing\n  `incinerator-shredder-loto` and `molten-metal-loto` schemas)\n- **산업안전보건법 (OSHA-KR) Article 38** — 추락 등 안전조치 (fall prevention;\n  UNCITED by existing railway WFs — this skill newly activates it for\n  roof and pit access)\n- **안전보건기준에관한규칙 (OSHSR)** — 감전 등 전기 재해 방지 기준 (electrical-\n  hazard prevention; co-existent catenary-adjacent work)\n- **KORAIL \u002F Seoul Metro depot 안전관리자** — every depot has a named\n  안전관리자 who MUST countersign the 작업허가서 and verify vehicle-\n  movement LOTO before any undercarriage \u002F pit \u002F bogey work begins\n- **118 (철도종합상황실) + 119** — depot rescue pathway; vehicle-roll\n  rescue must NOT re-energize catenary; coordinated with 철도종합상황실\n- **Railway-specific**: Korea's urban-metro depots (Seoul Metro, KORAIL,\n  Busan Transportation Corporation) operate EMU fleets with nightly\n  light-maintenance cycles — the bogey\u002Fpit\u002Froof work is routine, high-\n  frequency, and the re-positioning risk is ever-present on graded depot\n  tracks\n\n## Integration\n\n- **Input from**: depot maintenance work-order, EMU\u002Floco road number,\n  depot track assignment, bogey-lift crane specification\n- **Output to**: `railway-railway-rolling-stock-maintenance-loto-record.json`\n  (the evidence model for the `railway-rolling-stock-maintenance-loto`\n  workflow at `workflows\u002Fdomains\u002Findustry\u002Frailway\u002Frailway-rolling-stock-maintenance-loto\u002F`)\n- **Coordinated skills**:\n  - `permit-to-work` (daily) — issues the 작업허가서 that this plan\n    references per OSHA Art 92\n  - `psm-loto` (psm) — generic LOTO procedure; this skill SPECIALIZES it\n    for a MOVING VEHICLE (wheel chocks + derails + brake scotch on top of\n    electrical\u002Fpneumatic isolation — fixed-plant LOTO has no equivalent\n    of wheel chocks or derails)\n  - `fall-hazard-assessor` (ehsconst) — generic fall-hazard assessment;\n    this skill specializes for the curved-roof \u002F pit-edge geometry of a\n    rail vehicle\n  - `tool-box-meeting` (TBM) — pre-work briefing record\n- **Escalation**: If wheel chocks cannot achieve positive rail-contact\n  (wet\u002Foily rail, steep depot grade), OR bogey-lift crane capacity is\n  within 1.25x of bogey weight (insufficient safety factor), OR adjacent-\n  track catenary cannot be confirmed de-energized for roof work, halt the\n  job and escalate to depot 안전관리자 + 철도종합상황실 before proceeding.\n  No PPE-only fallback exists for vehicle-movement isolation failure.\n\n## Non-Duplication Justification\n\nvs. `catenary-high-voltage-safety` (existing railway WF): that addresses\nthe 25kV ELECTRICAL hazard of the overhead catenary during maintenance\n(RSA Art 45 + ESCA Art 16). This skill addresses the MECHANICAL \u002F\nvehicle-movement hazard of the rail vehicle itself in the depot —\ndifferent energy class (kinetic + pneumatic + gravity vs. electrical),\ndifferent work location (depot track vs. catenary), different isolation\ndiscipline (wheel chocks + derails vs. breaker + ground strap). The two\nskills coordinate when roof work requires catenary de-energization (this\nskill REFERENCES the catenary WF, does not duplicate it).\n\nvs. `rail-track-confined-maintenance` (existing railway WF): that\naddresses TRACK + TUNNEL work (RSA Art 48 for track protection + OSHA\nArt 38). This skill addresses VEHICLE work in the DEPOT — the WF is on\nthe rail vehicle, not on the track. Different hazard (vehicle roll \u002F\nbogey drop \u002F roof fall vs. train-approach struck-by \u002F tunnel asphyxia).\n\nvs. `psm-loto` (psm domain): that addresses FIXED-PLANT equipment LOTO\n(vessel, pump, valve). This skill addresses MOVING-VEHICLE LOTO — the\nonly skill in the codebase that locks out a rail vehicle against\naccidental movement. The isolation physics are fundamentally different\n(positive mechanical restraint layered on electrical\u002Fpneumatic isolation\nvs. electrical\u002Fpneumatic isolation alone).\n\nvs. `molten-metal-loto` (steelmaking) and `incinerator-shredder-loto`\n(waste): both are FIXED-PLANT equipment LOTO. This skill is MOVING-\nVEHICLE LOTO — distinct isolation discipline as described above.\n\n## Legal Disclaimer\n\n> 자동화 계획 보조. 최종 차량 정비 안전 조치 결정은 차량사업소 안전관리자 +\n> 철도운영기관 안전책임자 권한 per 철도안전법 (RSA) Article 48 and\n> 산업안전보건법 (OSHA-KR) Article 92 + Article 38 (+안전보건기준에관한규칙). Wheel-\n> chock-to-rail contact, bogey-lift rigging capacity, and catenary\n> isolation MUST be verified by the depot 안전관리자 and a qualified lifting\n> engineer before any undercarriage, pit, bogey, or roof work begins.\n",{"lang":23,"name":5,"owner":24,"scope":25,"mirror":19,"status":26,"created":27,"version":28,"metadata":29,"description":7,"lang_reason":51,"last_updated":27},"ko","railway-agent","co-safety","active","2026-08-07","1.0.0",{"type":30,"triggers":31,"legal_basis":46},"domain",[32,33,34,35,36,37,38,39,40,41,42,43,44,45],"철도 차량사업소 차량 정비 LOTO","rolling stock depot maintenance","EMU 객차 정비 차량 이동 잠금","rolling stock vehicle movement lockout","bogey 대차 리프팅 크레인","bogey heavy lift rigging","밑바닥 pit 작업 차량 압사","undercarriage pit work crush","차량 지붕 추락 방지","roof fall prevention rolling stock","철도 안전관리자 정비 허가","RSA Article 48 철도 보호","OSHA-KR Article 38 추락 방지 포함 안전조치 (전차선)","wheel chock derail brake scotch",[47,48,49,50],"철도안전법 제48조 (철도 보호 및 질서유지를 위한 금지행위)","산업안전보건기준에 관한 규칙 제92조 (LOTO — 에너지원 차단·작업 정지)","산업안전보건법 제38조 (추락 등 안전조치 — 차량 지붕·pit 추락 방지)","중대재해처벌법 제4조 (사업주 안전보건 확보의무)","legal","main","1162ccc568cf90c01b3886d6143cbfd851a37883","templates\u002Fco-safety\u002Fskills\u002Frolling-stock-maintenance-loto-planner",9,"https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards","https:\u002F\u002Fgithub.com\u002F5throck","Experienced in digital transformation, enterprise IT, startup acceleration, and business strategy. Focused on building practical systems that connect technolo","2026-11-14 21:22:34",{"source":8,"skillName":5,"commands":61,"prompt":71,"zipAvailable":72},[62,65,68],{"tool":63,"command":64},"npx","npx skills add 5throck\u002Fai-workspace-standards --skill rolling-stock-maintenance-loto-planner",{"tool":66,"command":67},"bunx","bunx skills add 5throck\u002Fai-workspace-standards --skill rolling-stock-maintenance-loto-planner",{"tool":69,"command":70},"pnpm","pnpm dlx skills add 5throck\u002Fai-workspace-standards --skill rolling-stock-maintenance-loto-planner","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-safety\u002Fskills\u002Frolling-stock-maintenance-loto-planner\u002FSKILL.md",true,[],[75,83,88,93,98,103],{"skillNo":76,"name":77,"nameZh":6,"description":78,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":79,"categories":80,"keywords":81,"publishedAt":82},"01M7BBJDYHJMGTJYSC37JVWY8S","i18n-layout","Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL\u002Fbidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF\u002FBOM issues surface.","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],"2026-11-15 14:19:17",{"skillNo":84,"name":77,"nameZh":6,"description":78,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":85,"categories":86,"keywords":87,"publishedAt":82},"01M7BBJ9XHAAS1AVGKZZ841VBZ","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.hermes\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],{"skillNo":89,"name":77,"nameZh":6,"description":78,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":90,"categories":91,"keywords":92,"publishedAt":82},"01M7BBJ5C3X8TKFKG5R9P9P49W","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.gemini\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],{"skillNo":94,"name":77,"nameZh":6,"description":78,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":95,"categories":96,"keywords":97,"publishedAt":82},"01M7BBJ1B52X0QMJ2QVBMPJB37","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.codex\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],{"skillNo":99,"name":77,"nameZh":6,"description":78,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":100,"categories":101,"keywords":102,"publishedAt":82},"01M7BBHX91BW2Q2R276MRX5AW3","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.claude\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],{"skillNo":104,"name":77,"nameZh":6,"description":78,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":105,"categories":106,"keywords":107,"publishedAt":82},"01M7BBHQWGXPSFRWN1PRC2NMMV","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.agents\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[]]