rolling-stock-maintenance-loto-planner

Plan rolling-stock depot maintenance safety — EMU/coach/locomotive vehicle-movement lockout (wheel chock + derail + brake scotch), bogey heavy-lift rigging, undercarriage pit work, and fall protection from rolling-stock roof. Vehicle-LOTO distinct from fixed-plant LOTO. RSA Art 48 + OSHA Art 92 (LOTO 정지) + OSHA Art 99 (추락 방지 — uncited by existing railway WFs) + SAPA Art 4.

License 许可
AGPL-3.0
最近更新
2026-11-14
Stars
★ 25
Forks
9

01 前言 Front Matter

lang
ko
name
rolling-stock-maintenance-loto-planner
owner
railway-agent
scope
co-safety
mirror
false
status
active
created
2026-08-07
version
1.0.0
metadata
{ "type": "domain", "triggers": [ "철도 차량사업소 차량 정비 LOTO", "rolling stock depot maintenance", "EMU 객차 정비 차량 이동 잠금", "rolling stock vehicle movement lockout", "bogey 대차 리프팅 크레인", "bogey heavy lift rigging", "밑바닥 pit 작업 차량 압사", "undercarriage pit work crush", "차량 지붕 추락 방지", "roof fall prevention rolling stock", "철도 안전관리자 정비 허가", "RSA Article 48 철도 보호", "OSHA-KR Article 38 추락 방지 포함 안전조치 (전차선)", "wheel chock derail brake scotch" ], "legal_basis": [ "철도안전법 제48조 (철도 보호 및 질서유지를 위한 금지행위)", "산업안전보건기준에 관한 규칙 제92조 (LOTO — 에너지원 차단·작업 정지)", "산업안전보건법 제38조 (추락 등 안전조치 — 차량 지붕·pit 추락 방지)", "중대재해처벌법 제4조 (사업주 안전보건 확보의무)" ] }
description
Plan rolling-stock depot maintenance safety — EMU/coach/locomotive vehicle-movement lockout (wheel chock + derail + brake scotch), bogey heavy-lift rigging, undercarriage pit work, and fall protection from rolling-stock roof. Vehicle-LOTO distinct from fixed-plant LOTO. RSA Art 48 + OSHA Art 92 (LOTO 정지) + OSHA Art 99 (추락 방지 — uncited by existing railway WFs) + SAPA Art 4.
lang_reason
legal
last_updated
2026-08-07

03 SKILL.md 正文

audit_exception: safety-os-skill-structure — Safety OS skills use the legal_basis-gated SSOT skill format (validated by scripts/skill-lifecycle-audit.ts and scripts/validate-skills.ts), not the generic template 5-section/7-frontmatter schema

Rolling Stock Maintenance LOTO Planner Skill

Overview

Rolling-stock depot maintenance safety planner for EMU (Electric Multiple Unit), coach, and locomotive work at 차량사업소 (railway depots / light- maintenance facilities) — the MOVING-VEHICLE LOTO hazard face of railway maintenance, distinct from the FIXED-PLANT equipment LOTO covered by steelmaking molten-metal-loto and waste incinerator-shredder-loto, and distinct from the 25kV catenary electrical and track/tunnel confined- space hazards covered by the two existing railway workflows.

The railway industry anchor (regulations/KR/industry-regulatory-anchors.yaml lines 463-501) names 철도안전법 (RSA) Article 48 (철도 보호 및 질서유지를 위한 금지행위) and OSHA-KR Article 38 (추락 등 안전조치 — 전차선/선로 작업) in the primary/adjacent statute blocks — cited by ZERO existing railway workflows prior to the railway-rolling-stock-maintenance-loto workflow (Task C-1b, 2026-08-07). The anchor also names OSHA-KR Article 38 (감전 등 안전조치) for the catenary-adjacent depot work. This skill operationalizes RSA Art 48 + OSHA Art 92 (LOTO 정지 — 안전보건기준에관한규칙 Art 92, per existing codebase convention) + OSHA Art 38 into a deployable depot-maintenance safety plan.

Korean Railway Depot Context

Why rolling-stock vehicle-LOTO is distinct

Factor Fixed-plant LOTO (incinerator, furnace) Rolling-stock vehicle LOTO (this skill)
Isolation target Fixed equipment (motor, valve) MOVING VEHICLE (EMU car, locomotive)
Energy sources Electrical, pneumatic, thermal Kinetic (roll), pneumatic (brake), electrical (catenary/pantograph), gravity (bogey lift)
Lockout means Breaker + tag + verify Wheel chock + derail + brake scotch + pantograph down + catenary dead
Re-positioning risk None (equipment is bolted down) HIGH — vehicle can roll if any isolation fails
Co-existent work Generally one trade at a time Bogey team UNDER car + roof team ON car + pit team BENEATH floor — concurrent
Fall hazard geometry Grade-level Roof access (4 m+ fall) + pit access (2 m+ fall into pit)

A rail vehicle is not "de-energized" in the fixed-plant sense — it can move under gravity (grade), residual brake-pressure release, or pantograph- driven traction. Vehicle-LOTO therefore requires POSITIVE mechanical restraint (wheel chocks, derails, brake scotches) layered on top of electrical/pneumatic isolation. This is the only skill in the codebase that plans lockout of a MOVING VEHICLE.

Hazard profile (from railway regulatory anchor)

  • RSA Art 48 (UNCITED by rolling-stock WF; rail-track WF cites it but for track work) — 철도 보호 및 질서유지를 위한 금지행위: prohibits interference with railway vehicles and structures; basis for depot vehicle-movement control
  • OSHA-KR Art 92 (LOTO 정지 — 안전보건기준에관한규칙 Art 92, per existing codebase convention 산업안전보건법 Article 92) — hazardous-energy isolation; applied here to kinetic + pneumatic + electrical energy of a rail vehicle
  • OSHA-KR Art 38 (corrected anchor, 2026-08-24; in anchor adjacent_laws) — 추락 방지: fall prevention for roof access and pit access during depot work
  • OSHA-KR Art 38 (in anchor adjacent_laws) — 감전 등 안전조치: electrical hazard for catenary-adjacent / pantograph work
  • SAPA Art 4 — 사업주 안전보장 의무: universal safety-assurance obligation

Hazard Scenarios Covered

1. Vehicle-movement / roll-away during undercarriage work

  • EMU car stopped at depot track; pit worker under floor for brake- cylinder inspection
  • Brake-pressure release or grade-induced roll — worker crushed by wheel or undercarriage equipment
  • The signature depot fatal-incident class in Korea (KORAIL / Seoul Metro depot history)

2. Bogey (대차) heavy-lift rigging failure

  • Bogey removed from under carbody using overhead crane (15-25 tonne bogey); carbody supported on stands
  • Rigging sling failure or stand collapse — carbody drops onto workers
  • Crane-loads overhead simultaneously (dual lifting hazard)

3. Roof access fall (pantograph / air-conditioner / roof equipment)

  • Worker climbs onto EMU roof (~4 m above rail level) for pantograph inspection or AC-unit service
  • No fall-protection anchor point on curved roof — fall-to-grade
  • Catenary adjacent on same track — co-existent electrical hazard (OSHA Art 38 + OSHSR 전기기준)

4. Pit access fall + confined-space edge

  • Pit entry for underfloor inspection (battery box, compressor, traction motor)
  • Pit-access ladder failure or edge fall (~2 m) into pit
  • Pit confined-space atmosphere (residual solvent / welding fume from adjacent bay)

5. Pantograph / catenary residual-energy (depot track)

  • Depot tracks often have overhead catenary for test movements; pantograph up = 25kV exposure
  • Worker on roof near raised pantograph — arc-flash + electrocution
  • Adjacent track live while depot track isolated — co-existent electrical

6. Concurrent multi-trade conflict

  • Bogey team (under carbody) + roof team (on carbody) + pit team (beneath floor) + interior team (inside cabin) all working one EMU simultaneously
  • Any one team's energy-isolation failure endangers the others

Rolling-Stock Vehicle-LOTO Hierarchy (depot-specific)

1. Elimination

  • Engineer-out the hazard: automated bogey-drop tables (no overhead crane lift) where economically feasible
  • Remote pantograph inspection cameras (eliminate roof access for routine checks)
  • Track-movable depots (vehicle stays on one track for the full maintenance cycle, eliminating inter-bay movements)

2. Engineering controls (preferred over PPE)

  • Wheel chocks at both ends of every isolated axle (positive mechanical roll-restraint) — verified chock-to-rail contact
  • Portable derails placed on the depot track at both ends of the isolated vehicle (prevents a vehicle from adjacent track entering the work zone)
  • Brake scotch / parking-brake lock — mechanical brake-application lock to prevent brake-pressure release
  • Pantograph lock-down — pantograph physically clamped in down position; catenary on isolated track de-energized and grounded per existing catenary-high-voltage-safety WF
  • Bogey-lift crane with anti-drop valve — hydraulic check valve prevents uncontrolled descent on hose failure
  • Carbody stands with mechanical lock pin — positive mechanical support, not hydraulic-only
  • Roof-edge fall-protection guardrail system (deployable on depot roof-access platforms, NOT on the carbody itself)
  • Pit-edge fall protection — removable guardrails at pit access openings

3. Administrative controls

  • 작업허가서 (work permit) per OSHA Art 92 for every depot maintenance job — isolated-vehicle permit issued by depot 안전관리자 before work begins
  • Vehicle-movement lockout log — wheel-chock installed-by / verified- by / removed-by sign-off trail
  • Multi-trade coordination briefing — single depot supervisor coordinates all concurrent trades on one EMU; no trade begins until all isolations confirmed
  • Catenary isolation certificate — for any roof work, depot catenary on the isolated track grounded per catenary-high-voltage-safety WF
  • Bogey-lift plan — rigging diagram, crane capacity verification, exclusion zone, signed by lifting engineer
  • TBM (tool-box meeting) before each shift — see shared TBM workflow
  • Fall-protection plan per OSHA Art 38 for any roof / pit access

4. PPE

  • Full-body harness with double lanyard for all roof access (100% tie-off on carbody) — anchored to depot-rated anchor point, NOT to carbody hand-hold (which is not rated for fall arrest)
  • Hard hat with chin strap (wind blast from passing train on adjacent track)
  • Steel-toe safety boots for pit work + bogey zone (heavy dropped- object hazard)
  • High-visibility vest (depot has active vehicle movements on other tracks)
  • Dielectric gloves Class 2 if catenary-adjacent work cannot be avoided (per OSHA Art 38 + OSHSR)
  • Hearing protection in bogey-test bay (post-maintenance test runs)

Planning Workflow

  1. Vehicle identification + depot track assignment — EMU/coach/ locomotive road number, depot track, isolated-track confirmation
  2. Energy-source inventory — kinetic (roll), pneumatic (brake), electrical (catenary/pantograph), gravity (bogey-lift/carbody-stands), co-existent adjacent-track energy
  3. Vehicle-movement LOTO — wheel chocks both-ends + portable derails both-ends + brake scotch + parking-brake lock; verified by depot 안전관리자
  4. Catenary isolation (if roof work or pantograph work) — depot catenary on isolated track de-energized, grounded, danger-tagged per catenary-high-voltage-safety WF
  5. Bogey-lift plan (if bogey work) — rigging diagram, crane capacity vs bogey weight, carbody stand placement, exclusion zone
  6. Roof-access fall-protection plan (if roof work) — anchor point selection, 100% tie-off procedure, rescue plan per OSHA Art 38
  7. Pit-access plan (if underfloor work) — pit-edge guardrails, ladder condition, pit atmosphere check
  8. Multi-trade coordination briefing — single supervisor sequences all concurrent trades; energy-isolation confirmation before each trade begins
  9. 작업허가서 issuance per OSHA Art 92 — depot 안전관리자 signs the consolidated permit covering all isolations
  10. TBM + execution — tool-box meeting conducted, work proceeds under the single supervisor
  11. Post-work restoration — all tools/accountability verified out, vehicle-movement LOTO removed in reverse order (brake release last), catenary re-energized per catenary WF sequence, vehicle released for test movement
  12. Emergency response plan — vehicle-roll rescue (extract without re-energizing catenary), bogey-drop extraction, 119 dispatch, incident reporting per OSHA-KR Art 57

Output

{
  "plan_id": "rail-rsml-2026-08-07-001",
  "depot": "Seoul Metro Gunja Depot Bay 3",
  "vehicle": "EMU Car 3815-set, Road Number 3815-3",
  "track": "Depot Track 7 (isolated)",
  "task_type": "bogey_removal_and_pit_inspection",
  "energy_sources": ["kinetic_roll", "pneumatic_brake", "catenary_25kv_adjacent", "gravity_bogey_lift"],
  "adjacent_track_live": false,
  "workers_by_trade": {
    "bogey_team": 3,
    "pit_team": 2,
    "roof_team": 0
  },
  "vehicle_movement_loto": {
    "wheel_chocks_axles": [1, 4],
    "derails_installed": ["track_north_end", "track_south_end"],
    "brake_scotch": "verified_installed",
    "parking_brake_lock": "engaged",
    "install_verified_by": "depot_supervisor_이안전"
  },
  "catenary_isolation": {
    "required_for_this_job": false,
    "reason": "no_roof_no_pantograph_work"
  },
  "bogey_lift_plan": {
    "crane_capacity_t": 30,
    "bogey_weight_t": 18.5,
    "safety_factor": 1.62,
    "anti_drop_valve": true,
    "carbody_stands_lock_pin": "verified",
    "rigging_diagram_ref": "DEPOT-RIG-2026-3815-3"
  },
  "administrative": {
    "permit_issued_per_osha_art92": true,
    "permit_id": "WP-DEPOT-2026-08-07-0142",
    "depot_safety_manager_signoff": true,
    "multi_trade_coordinator": "supervisor_김현",
    "tbm_conducted": true
  },
  "fall_protection_plan": {
    "roof_work": false,
    "pit_work": {
      "edge_guardrails": true,
      "ladder_inspected": true,
      "pit_atmosphere_check": "19.5_23.5_pct_O2_pass"
    }
  },
  "ppe": {
    "harness_double_lanyard_roof_team": "n_a_no_roof_work",
    "steel_toe_boots": true,
    "high_vis_vest": true,
    "hearing_protection_test_bay": true
  },
  "rescue_plan_ref": "DEPOT-ERP-2026-vehicle-roll",
  "regulatory_basis": [
    "철도안전법 (RSA) Article 48 — 철도 보호 및 질서유지를 위한 금지행위",
    "산업안전보건법 (OSHA-KR) Article 92 — LOTO 정지 (안전보건기준에관한규칙 제92조, codebase convention)",
    "산업안전보건법 (OSHA-KR) Article 38 — 추락 등 위해 방지 안전조치 (전차선/선로/차량 작업)",
    "산업안전보건기준에관한규칙 — 감전 등 전기 재해 방지 기준 (25kV 전차선 인접)",
    "중대재해처벌법 (SAPA) Article 4 — 사업주 안전보장 의무"
  ],
  "acceptance_status": "ready_to_execute"
}

Korean-Specific Standards

  • 철도안전법 (RSA) Article 48 — 철도 보호 및 질서유지를 위한 금지행위 (basis for depot vehicle-movement control; restricts interference with railway vehicles)
  • 산업안전보건법 (OSHA-KR) Article 92 — LOTO 정지 (hazardous-energy isolation; cited per existing codebase convention — technically in 안전보건기준에관한규칙 Art 92, followed for consistency with existing incinerator-shredder-loto and molten-metal-loto schemas)
  • 산업안전보건법 (OSHA-KR) Article 38 — 추락 등 안전조치 (fall prevention; UNCITED by existing railway WFs — this skill newly activates it for roof and pit access)
  • 안전보건기준에관한규칙 (OSHSR) — 감전 등 전기 재해 방지 기준 (electrical- hazard prevention; co-existent catenary-adjacent work)
  • KORAIL / Seoul Metro depot 안전관리자 — every depot has a named 안전관리자 who MUST countersign the 작업허가서 and verify vehicle- movement LOTO before any undercarriage / pit / bogey work begins
  • 118 (철도종합상황실) + 119 — depot rescue pathway; vehicle-roll rescue must NOT re-energize catenary; coordinated with 철도종합상황실
  • Railway-specific: Korea's urban-metro depots (Seoul Metro, KORAIL, Busan Transportation Corporation) operate EMU fleets with nightly light-maintenance cycles — the bogey/pit/roof work is routine, high- frequency, and the re-positioning risk is ever-present on graded depot tracks

Integration

  • Input from: depot maintenance work-order, EMU/loco road number, depot track assignment, bogey-lift crane specification
  • Output to: railway-railway-rolling-stock-maintenance-loto-record.json (the evidence model for the railway-rolling-stock-maintenance-loto workflow at workflows/domains/industry/railway/railway-rolling-stock-maintenance-loto/)
  • Coordinated skills:
    • permit-to-work (daily) — issues the 작업허가서 that this plan references per OSHA Art 92
    • psm-loto (psm) — generic LOTO procedure; this skill SPECIALIZES it for a MOVING VEHICLE (wheel chocks + derails + brake scotch on top of electrical/pneumatic isolation — fixed-plant LOTO has no equivalent of wheel chocks or derails)
    • fall-hazard-assessor (ehsconst) — generic fall-hazard assessment; this skill specializes for the curved-roof / pit-edge geometry of a rail vehicle
    • tool-box-meeting (TBM) — pre-work briefing record
  • Escalation: If wheel chocks cannot achieve positive rail-contact (wet/oily rail, steep depot grade), OR bogey-lift crane capacity is within 1.25x of bogey weight (insufficient safety factor), OR adjacent- track catenary cannot be confirmed de-energized for roof work, halt the job and escalate to depot 안전관리자 + 철도종합상황실 before proceeding. No PPE-only fallback exists for vehicle-movement isolation failure.

Non-Duplication Justification

vs. catenary-high-voltage-safety (existing railway WF): that addresses the 25kV ELECTRICAL hazard of the overhead catenary during maintenance (RSA Art 45 + ESCA Art 16). This skill addresses the MECHANICAL / vehicle-movement hazard of the rail vehicle itself in the depot — different energy class (kinetic + pneumatic + gravity vs. electrical), different work location (depot track vs. catenary), different isolation discipline (wheel chocks + derails vs. breaker + ground strap). The two skills coordinate when roof work requires catenary de-energization (this skill REFERENCES the catenary WF, does not duplicate it).

vs. rail-track-confined-maintenance (existing railway WF): that addresses TRACK + TUNNEL work (RSA Art 48 for track protection + OSHA Art 38). This skill addresses VEHICLE work in the DEPOT — the WF is on the rail vehicle, not on the track. Different hazard (vehicle roll / bogey drop / roof fall vs. train-approach struck-by / tunnel asphyxia).

vs. psm-loto (psm domain): that addresses FIXED-PLANT equipment LOTO (vessel, pump, valve). This skill addresses MOVING-VEHICLE LOTO — the only skill in the codebase that locks out a rail vehicle against accidental movement. The isolation physics are fundamentally different (positive mechanical restraint layered on electrical/pneumatic isolation vs. electrical/pneumatic isolation alone).

vs. molten-metal-loto (steelmaking) and incinerator-shredder-loto (waste): both are FIXED-PLANT equipment LOTO. This skill is MOVING- VEHICLE LOTO — distinct isolation discipline as described above.

Legal Disclaimer

자동화 계획 보조. 최종 차량 정비 안전 조치 결정은 차량사업소 안전관리자 + 철도운영기관 안전책임자 권한 per 철도안전법 (RSA) Article 48 and 산업안전보건법 (OSHA-KR) Article 92 + Article 38 (+안전보건기준에관한규칙). Wheel- chock-to-rail contact, bogey-lift rigging capacity, and catenary isolation MUST be verified by the depot 안전관리자 and a qualified lifting engineer before any undercarriage, pit, bogey, or roof work begins.

04 同仓库更多 Skills

5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25