[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M73FXWM4ETT0D7B5NB9A2PC5":3,"skill-same:01M73FXWM4ETT0D7B5NB9A2PC5":66},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":15,"categories":16,"keywords":17,"publishedAt":18,"linkOnly":19,"markdownContent":20,"markdownBody":21,"frontMatter":22,"refName":44,"commitSha":45,"skillDirectory":46,"forksCount":47,"repositoryHtmlUrl":48,"repositoryHomepageUrl":6,"ownerHtmlUrl":49,"ownerBlogUrl":6,"ownerDescription":50,"updatedAt":51,"install":52,"resources":65},"01M73FXWM4ETT0D7B5NB9A2PC5","mid-construction-inspection",null,"Execute KGS on-site mid-construction inspection for gas terminal facilities (LNG\u002FLPG\u002F수소). Verifies construction progress against approved design, checks welding quality, material traceability, and safety system installation.","5throck\u002Fai-workspace-standards","5throck","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F10958964?v=4","01M73BFEH0V0VS483TW4JD49JW","01M73BFEJ5VQZJHJSFTVPAZGDM",25,"AGPL-3.0","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-safety\u002Fskills\u002Fmid-construction-inspection\u002FSKILL.md",[],[],"2026-11-11 15:11:14",false,"---\n\nmirror: false\nlang: ko\nlang_reason: legal\nname: mid-construction-inspection\nowner: gasterm-agent\nscope: co-safety\nstatus: active\ndescription: >\n  Execute KGS on-site mid-construction inspection for gas terminal facilities\n  (LNG\u002FLPG\u002F수소). Verifies construction progress against approved design,\n  checks welding quality, material traceability, and safety system installation.\nversion: 1.0.0\ncreated: 2026-07-09\nlast_updated: 2026-07-17\nmetadata:\n  type: domain\n  triggers:\n    - mid-construction inspection\n    - construction inspection\n    - 중간검사\n    - 공사검사\n    - 현장검사\n  legal_basis:\n    - 고압가스 안전 관리 및 사업법 제22조의2 (기술검토 연계 중간검사)\n    - 액화석유가스의 안전관리 및 사업법 제45조 (검사 기준)\n    - 도시가스사업법 제17조의5 (시설·기술·검사 기준)\n---\n\naudit_exception: safety-os-skill-structure — Safety OS skills use the legal_basis-gated SSOT skill format (validated by scripts\u002Fskill-lifecycle-audit.ts and scripts\u002Fvalidate-skills.ts), not the generic template 5-section\u002F7-frontmatter schema\n\n## mid-construction-inspection\n\n### Purpose\n\nExecute Phase 2 of the KGS Code construction inspection: mid-construction on-site inspection verifying construction quality and compliance, populating `evidence-models\u002Fdomains\u002Findustry\u002Fgasterm\u002Fgasterm-mid-construction-inspection-record.json`.\n\n### Scope\n\n- Construction progress verification against approved design (공사 진도 50~70% 시점)\n- Welding quality inspection (WPS\u002FPQR verification)\n- Material traceability verification\n- Safety system installation checks\n- Foundation and tank installation inspection\n- Documentation completeness review\n\n### Legal Basis\n\n| Law | Article | Requirement |\n|-----|---------|-------------|\n| 고압가스 안전 관리 및 사업법 | Article 22의2 | 기술검토 연계 중간검사 |\n| 액화석유가스의 안전관리 및 사업법 | Article 45 | 검사 기준 |\n| 도시가스사업법 | Article 17의5 | 시설·기술·검사 기준 |\n| KGS Code | Section 4 | Inspection and Testing |\n\n### Prerequisites\n\n- Phase 1 (`pre-construction-technical-review`) must have `review_result == pass`. Record the resulting `record_id` as `pre_construction_review_id` on this record.\n\n### Related Skills\n\n- **`construction-permit-overview`** — orchestrates this skill as Phase 2, gated on Phase 1 `passed`; this skill's `inspection_result` gates dispatch of `completion-inspection`.\n- **`pre-construction-technical-review`** — upstream Phase 1 dependency.\n\n### Workflow\n\n1. **Inspection Application** — At construction progress ~50-70% (`construction_progress_pct`), apply to KGS for on-site inspection scheduling. Record `pre_construction_review_id`.\n2. **Pre-Inspection Site Readiness Check** — Confirm site state and required documentation are ready before the KGS inspector arrives.\n3. **KGS On-Site Inspection** — KGS 입회 하에 핵심 공정 확인: 배관 용접, 토목 기초, 탱크 설치 등. Record `kgs_inspector`, `inspection_date`, and populate `inspected_items[]` (each with `item`, `result`: pass\u002Ffail\u002Fna, `notes`).\n4. **Deficiency Recording** — For any failed item, populate `deficiencies[]` with `item`, `severity` (critical\u002Fmajor\u002Fminor), `corrective_action`, and `due_date`.\n5. **Corrective Action (if needed)** — Track remediation of deficiencies; re-inspect critical\u002Fmajor items before proceeding.\n6. **Result Recording** — Set `inspection_result`: `pass` \u002F `supplement_required` \u002F `fail`. Only `pass` permits dispatch of Phase 3 (`completion-inspection`).\n7. **Closure** — Return `record_id` to the orchestrating `construction-permit-overview` record's `phases.mid_inspection.result_id`.\n\n### Inputs\n\n- Approved design documentation (Phase 1 pass record)\n- Construction progress reports\n- Welding procedure specifications (WPS\u002FPQR)\n- Material certificates\n\n### Outputs\n\n`gasterm-mid-construction-inspection-record.json`-conformant record including:\n- `inspected_items[]`, `deficiencies[]`, `inspection_result`\n- `legal_basis` (>= 3 sources, drawn from the table above)\n- Non-conformance notice and remediation requirements for any `fail`\u002F`supplement_required` item\n","audit_exception: safety-os-skill-structure — Safety OS skills use the legal_basis-gated SSOT skill format (validated by scripts\u002Fskill-lifecycle-audit.ts and scripts\u002Fvalidate-skills.ts), not the generic template 5-section\u002F7-frontmatter schema\n\n## mid-construction-inspection\n\n### Purpose\n\nExecute Phase 2 of the KGS Code construction inspection: mid-construction on-site inspection verifying construction quality and compliance, populating `evidence-models\u002Fdomains\u002Findustry\u002Fgasterm\u002Fgasterm-mid-construction-inspection-record.json`.\n\n### Scope\n\n- Construction progress verification against approved design (공사 진도 50~70% 시점)\n- Welding quality inspection (WPS\u002FPQR verification)\n- Material traceability verification\n- Safety system installation checks\n- Foundation and tank installation inspection\n- Documentation completeness review\n\n### Legal Basis\n\n| Law | Article | Requirement |\n|-----|---------|-------------|\n| 고압가스 안전 관리 및 사업법 | Article 22의2 | 기술검토 연계 중간검사 |\n| 액화석유가스의 안전관리 및 사업법 | Article 45 | 검사 기준 |\n| 도시가스사업법 | Article 17의5 | 시설·기술·검사 기준 |\n| KGS Code | Section 4 | Inspection and Testing |\n\n### Prerequisites\n\n- Phase 1 (`pre-construction-technical-review`) must have `review_result == pass`. Record the resulting `record_id` as `pre_construction_review_id` on this record.\n\n### Related Skills\n\n- **`construction-permit-overview`** — orchestrates this skill as Phase 2, gated on Phase 1 `passed`; this skill's `inspection_result` gates dispatch of `completion-inspection`.\n- **`pre-construction-technical-review`** — upstream Phase 1 dependency.\n\n### Workflow\n\n1. **Inspection Application** — At construction progress ~50-70% (`construction_progress_pct`), apply to KGS for on-site inspection scheduling. Record `pre_construction_review_id`.\n2. **Pre-Inspection Site Readiness Check** — Confirm site state and required documentation are ready before the KGS inspector arrives.\n3. **KGS On-Site Inspection** — KGS 입회 하에 핵심 공정 확인: 배관 용접, 토목 기초, 탱크 설치 등. Record `kgs_inspector`, `inspection_date`, and populate `inspected_items[]` (each with `item`, `result`: pass\u002Ffail\u002Fna, `notes`).\n4. **Deficiency Recording** — For any failed item, populate `deficiencies[]` with `item`, `severity` (critical\u002Fmajor\u002Fminor), `corrective_action`, and `due_date`.\n5. **Corrective Action (if needed)** — Track remediation of deficiencies; re-inspect critical\u002Fmajor items before proceeding.\n6. **Result Recording** — Set `inspection_result`: `pass` \u002F `supplement_required` \u002F `fail`. Only `pass` permits dispatch of Phase 3 (`completion-inspection`).\n7. **Closure** — Return `record_id` to the orchestrating `construction-permit-overview` record's `phases.mid_inspection.result_id`.\n\n### Inputs\n\n- Approved design documentation (Phase 1 pass record)\n- Construction progress reports\n- Welding procedure specifications (WPS\u002FPQR)\n- Material certificates\n\n### Outputs\n\n`gasterm-mid-construction-inspection-record.json`-conformant record including:\n- `inspected_items[]`, `deficiencies[]`, `inspection_result`\n- `legal_basis` (>= 3 sources, drawn from the table above)\n- Non-conformance notice and remediation requirements for any `fail`\u002F`supplement_required` item\n",{"lang":23,"name":5,"owner":24,"scope":25,"mirror":19,"status":26,"created":27,"version":28,"metadata":29,"description":41,"lang_reason":42,"last_updated":43},"ko","gasterm-agent","co-safety","active",1783555200000,"1.0.0",{"type":30,"triggers":31,"legal_basis":37},"domain",[32,33,34,35,36],"mid-construction inspection","construction inspection","중간검사","공사검사","현장검사",[38,39,40],"고압가스 안전 관리 및 사업법 제22조의2 (기술검토 연계 중간검사)","액화석유가스의 안전관리 및 사업법 제45조 (검사 기준)","도시가스사업법 제17조의5 (시설·기술·검사 기준)","Execute KGS on-site mid-construction inspection for gas terminal facilities (LNG\u002FLPG\u002F수소). Verifies construction progress against approved design, checks welding quality, material traceability, and safety system installation.\n","legal",1784246400000,"main","1162ccc568cf90c01b3886d6143cbfd851a37883","templates\u002Fco-safety\u002Fskills\u002Fmid-construction-inspection",9,"https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards","https:\u002F\u002Fgithub.com\u002F5throck","Experienced in digital transformation, enterprise IT, startup acceleration, and business strategy. Focused on building practical systems that connect technolo","2026-11-14 21:22:34",{"source":8,"skillName":5,"commands":53,"prompt":63,"zipAvailable":64},[54,57,60],{"tool":55,"command":56},"npx","npx skills add 5throck\u002Fai-workspace-standards --skill mid-construction-inspection",{"tool":58,"command":59},"bunx","bunx skills add 5throck\u002Fai-workspace-standards --skill mid-construction-inspection",{"tool":61,"command":62},"pnpm","pnpm dlx skills add 5throck\u002Fai-workspace-standards --skill mid-construction-inspection","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-safety\u002Fskills\u002Fmid-construction-inspection\u002FSKILL.md",true,[],[67,75,80,85,90,95],{"skillNo":68,"name":69,"nameZh":6,"description":70,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":71,"categories":72,"keywords":73,"publishedAt":74},"01M7BBJDYHJMGTJYSC37JVWY8S","i18n-layout","Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL\u002Fbidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF\u002FBOM issues surface.","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],"2026-11-15 14:19:17",{"skillNo":76,"name":69,"nameZh":6,"description":70,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":77,"categories":78,"keywords":79,"publishedAt":74},"01M7BBJ9XHAAS1AVGKZZ841VBZ","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.hermes\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],{"skillNo":81,"name":69,"nameZh":6,"description":70,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":82,"categories":83,"keywords":84,"publishedAt":74},"01M7BBJ5C3X8TKFKG5R9P9P49W","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.gemini\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],{"skillNo":86,"name":69,"nameZh":6,"description":70,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":87,"categories":88,"keywords":89,"publishedAt":74},"01M7BBJ1B52X0QMJ2QVBMPJB37","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.codex\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],{"skillNo":91,"name":69,"nameZh":6,"description":70,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":92,"categories":93,"keywords":94,"publishedAt":74},"01M7BBHX91BW2Q2R276MRX5AW3","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.claude\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],{"skillNo":96,"name":69,"nameZh":6,"description":70,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":97,"categories":98,"keywords":99,"publishedAt":74},"01M7BBHQWGXPSFRWN1PRC2NMMV","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.agents\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[]]