mid-construction-inspection

Execute KGS on-site mid-construction inspection for gas terminal facilities (LNG/LPG/수소). Verifies construction progress against approved design, checks welding quality, material traceability, and safety system installation.

License 许可
AGPL-3.0
最近更新
2026-11-14
Stars
★ 25
Forks
9

01 前言 Front Matter

lang
ko
name
mid-construction-inspection
owner
gasterm-agent
scope
co-safety
mirror
false
status
active
created
1783555200000
version
1.0.0
metadata
{ "type": "domain", "triggers": [ "mid-construction inspection", "construction inspection", "중간검사", "공사검사", "현장검사" ], "legal_basis": [ "고압가스 안전 관리 및 사업법 제22조의2 (기술검토 연계 중간검사)", "액화석유가스의 안전관리 및 사업법 제45조 (검사 기준)", "도시가스사업법 제17조의5 (시설·기술·검사 기준)" ] }
description
Execute KGS on-site mid-construction inspection for gas terminal facilities (LNG/LPG/수소). Verifies construction progress against approved design, checks welding quality, material traceability, and safety system installation.
lang_reason
legal
last_updated
1784246400000

03 SKILL.md 正文

audit_exception: safety-os-skill-structure — Safety OS skills use the legal_basis-gated SSOT skill format (validated by scripts/skill-lifecycle-audit.ts and scripts/validate-skills.ts), not the generic template 5-section/7-frontmatter schema

mid-construction-inspection

Purpose

Execute Phase 2 of the KGS Code construction inspection: mid-construction on-site inspection verifying construction quality and compliance, populating evidence-models/domains/industry/gasterm/gasterm-mid-construction-inspection-record.json.

Scope

  • Construction progress verification against approved design (공사 진도 50~70% 시점)
  • Welding quality inspection (WPS/PQR verification)
  • Material traceability verification
  • Safety system installation checks
  • Foundation and tank installation inspection
  • Documentation completeness review

Legal Basis

Law Article Requirement
고압가스 안전 관리 및 사업법 Article 22의2 기술검토 연계 중간검사
액화석유가스의 안전관리 및 사업법 Article 45 검사 기준
도시가스사업법 Article 17의5 시설·기술·검사 기준
KGS Code Section 4 Inspection and Testing

Prerequisites

  • Phase 1 (pre-construction-technical-review) must have review_result == pass. Record the resulting record_id as pre_construction_review_id on this record.

Related Skills

  • construction-permit-overview — orchestrates this skill as Phase 2, gated on Phase 1 passed; this skill's inspection_result gates dispatch of completion-inspection.
  • pre-construction-technical-review — upstream Phase 1 dependency.

Workflow

  1. Inspection Application — At construction progress ~50-70% (construction_progress_pct), apply to KGS for on-site inspection scheduling. Record pre_construction_review_id.
  2. Pre-Inspection Site Readiness Check — Confirm site state and required documentation are ready before the KGS inspector arrives.
  3. KGS On-Site Inspection — KGS 입회 하에 핵심 공정 확인: 배관 용접, 토목 기초, 탱크 설치 등. Record kgs_inspector, inspection_date, and populate inspected_items[] (each with item, result: pass/fail/na, notes).
  4. Deficiency Recording — For any failed item, populate deficiencies[] with item, severity (critical/major/minor), corrective_action, and due_date.
  5. Corrective Action (if needed) — Track remediation of deficiencies; re-inspect critical/major items before proceeding.
  6. Result Recording — Set inspection_result: pass / supplement_required / fail. Only pass permits dispatch of Phase 3 (completion-inspection).
  7. Closure — Return record_id to the orchestrating construction-permit-overview record's phases.mid_inspection.result_id.

Inputs

  • Approved design documentation (Phase 1 pass record)
  • Construction progress reports
  • Welding procedure specifications (WPS/PQR)
  • Material certificates

Outputs

gasterm-mid-construction-inspection-record.json-conformant record including:

  • inspected_items[], deficiencies[], inspection_result
  • legal_basis (>= 3 sources, drawn from the table above)
  • Non-conformance notice and remediation requirements for any fail/supplement_required item

04 同仓库更多 Skills

5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25