AGENT SKILL

iso14971-risk-scorer

ISO 14971 risk estimation and scoring for medical devices. Severity × Probability matrix, residual risk evaluation.

License 许可
AGPL-3.0
最近更新
2026-11-14
Stars
★ 25
Forks
9

01 前言 Front Matter

lang
ko
name
iso14971-risk-scorer
owner
meddevice-agent
scope
co-safety
mirror
false
status
active
created
2026-06-18
version
1.1.0
metadata
{ "type": "domain", "triggers": [ "ISO 14971", "위해 추정", "risk estimation", "심각도 발생확률 매트릭스", "severity probability matrix", "잔여위험", "residual risk", "ALARP" ], "legal_basis": [ "의료기기법 제28조 (의료기기 품질관리 — KGMP-MD)", "의료기기법 제31조 (의료기기 위해사항 보고)", "의료기기법 제6조 (의료기기 제조업 허가)", "의료기기 제조 및 품질관리 기준 (MFDS 고시 — KGMP-MD)", "ISO 14971:2019" ] }
description
ISO 14971 risk estimation and scoring for medical devices. Severity × Probability matrix, residual risk evaluation.
lang_reason
legal
last_updated
2026-08-26

03 SKILL.md 正文

audit_exception: safety-os-skill-structure — Safety OS skills use the legal_basis-gated SSOT skill format (validated by scripts/skill-lifecycle-audit.ts and scripts/validate-skills.ts), not the generic template 5-section/7-frontmatter schema

ISO 14971 Risk Scorer Skill

Overview

ISO 14971 위해 추정 및 평가 — 심각도(Severity) × 발생확률(Probability) 매트릭스 기반 risk scoring.

Risk Estimation Matrix

Severity \ Probability Improbable Remote Occasional Probable Frequent
Negligible Low Low Low Medium Medium
Minor Low Low Medium Medium High
Serious Low Medium Medium High Critical
Critical Medium Medium High Critical Critical
Catastrophic Medium High Critical Critical Critical

Appendix — Cross-Walk to EHS 1-25 Scale (Consult-Mode Alignment Guidance)

Consult-mode alignment guidance only. This cross-walk exists so that device-risk outputs can be compared against the common EHS 1-25 scale used by risk-assessment-agent (normative bands defined on risk_score_before in evidence-models/domains/functional/risk-assessment/risk-assessment-record.json: 1-5 Low / 6-12 Medium / 13-19 High / 20-25 Critical; escalation threshold >= 13). It never replaces the qualitative matrix above — normative device-risk decisions stay on the ISO 14971 labels. Derivation rule: corner anchors Negligible×Improbable = 1 and Catastrophic×Frequent = 25; scale kept symmetric (cell(S,P) = cell(P,S)); monotone non-decreasing along both axes; every cell snapped into the band already published in the qualitative matrix, so band(numeric) always equals the ISO label.

Severity \ Probability Improbable Remote Occasional Probable Frequent
Negligible (S1) 1 2 4 7 9
Minor (S2) 2 3 7 10 14
Serious (S3) 4 7 12 15 21
Critical (S4) 7 10 15 20 23
Catastrophic (S5) 9 14 21 23 25

Properties of this mapping:

  • Band-exact: each numeric score lands in the same EHS band as its qualitative label in the matrix above (e.g. Serious+Probable = 15 = High), so consult-mode comparison can never contradict the ISO determination.
  • Escalation-consistent: the minimum High cell is 14 and the maximum Medium cell is 12, so the EHS escalation threshold (score >= 13) partitions the matrix exactly into the union of High + Critical cells.
  • Endpoints anchored: Catastrophic+Frequent = 25, Negligible+Improbable = 1.

ISO 14971 Process

Step 1: Hazard Identification

  • Intended use / intended users
  • Foreseeable misuse
  • Reasonably foreseeable misuse
  • Hazard identification (energy, biological, chemical, information)

Step 2: Risk Estimation

  • Severity (S1-S5): Negligible → Catastrophic
  • Probability (P1-P5): Improbable → Frequent
  • Risk level = f(S, P) — matrix lookup

Step 3: Risk Evaluation

  • Compare to risk acceptability criteria
  • Broadly acceptable / ALARP / Unacceptable

Step 4: Risk Control

  • Inherent safety by design
  • Protective measures (alarms, interlocks)
  • Information for safety (IFU, labeling)
  • Residual risk disclosure

Step 5: Residual Risk Evaluation

  • Overall residual risk
  • Benefit-risk comparison (Class 3/4 devices)
  • Risk management report

Korean Class-Specific Requirements

Class Risk Management Depth
Class 1 Simplified (basic ISO 14971)
Class 2 Standard ISO 14971
Class 3 Full + benefit-risk analysis
Class 4 Full + clinical data + PMCF

Output

Returns risk estimation:

{
  "hazard_id": "H-001",
  "hazard_description": "Electrical shock from power supply",
  "severity": "Critical (S4)",
  "probability": "Remote (P2)",
  "risk_level_before": "Medium",
  "risk_control": "Double insulation + grounding + IFU warning",
  "residual_severity": "Critical (S4)",
  "residual_probability": "Improbable (P1)",
  "risk_level_after": "Low",
  "residual_risk_acceptable": true,
  "overall_residual_risk": "ALARP"
}

Legal Disclaimer

자동화 위해 추정 보조. 최종 위해 수용성 판정은 자격을 갖춘 의료기기 위해관리자 + 임상 평가자.

04 同仓库更多 Skills

5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25