[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M73FX9X7WWDTRKX98P55AB5H":3,"skill-same:01M73FX9X7WWDTRKX98P55AB5H":72},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":15,"categories":16,"keywords":17,"publishedAt":18,"linkOnly":19,"markdownContent":20,"markdownBody":21,"frontMatter":22,"refName":50,"commitSha":51,"skillDirectory":52,"forksCount":53,"repositoryHtmlUrl":54,"repositoryHomepageUrl":6,"ownerHtmlUrl":55,"ownerBlogUrl":6,"ownerDescription":56,"updatedAt":57,"install":58,"resources":71},"01M73FX9X7WWDTRKX98P55AB5H","hv-cell-formation-electrical-safety-planner",null,"Plan high-voltage DC electrical safety for lithium-ion cell formation, charging, aging, and large ESS charge\u002Fdischarge facilities. Busbar LOTO, formation-charger grounding, aging-room interlock, ESS arc-flash boundary, DC arc-flash PPE selection, 전기안전관리자 sign-off per ESCA Art 22.","5throck\u002Fai-workspace-standards","5throck","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F10958964?v=4","01M73BFEH0V0VS483TW4JD49JW","01M73BFEJ5VQZJHJSFTVPAZGDM",25,"AGPL-3.0","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-safety\u002Fskills\u002Fhv-cell-formation-electrical-safety-planner\u002FSKILL.md",[],[],"2026-11-11 15:11:14",false,"---\n\nmirror: false\nlang: ko\nlang_reason: legal\nname: hv-cell-formation-electrical-safety-planner\nowner: battery-agent\nscope: co-safety\nstatus: active\ndescription: Plan high-voltage DC electrical safety for lithium-ion cell formation, charging, aging, and large ESS charge\u002Fdischarge facilities. Busbar LOTO, formation-charger grounding, aging-room interlock, ESS arc-flash boundary, DC arc-flash PPE selection, 전기안전관리자 sign-off per ESCA Art 22.\nversion: \"1.0.0\"\ncreated: \"2026-08-07\"\nlast_updated: \"2026-08-07\"\nmetadata:\n  type: domain\n\n  triggers:\n    - 배터리 셀 화성 고전압 안전\n    - cell formation electrical safety\n    - 이차전지 충전 에이징 감전\n    - ESS charge discharge arc flash\n    - formation charger grounding\n    - 배터리 busbar LOTO\n    - 전기안전관리자 선임 배터리\n    - ESCA Article 16 전기재해 예방\n    - ESCA Article 22 battery safety manager\n    - 산업안전보건법 Article 38 안전조치 + 안전보건기준에관한규칙 전기 기준\n    - aging room thermal interlock\n    - DC arc flash battery\n  legal_basis:\n    - 전기안전관리법 제16조\n    - 전기안전관리법 제22조\n    - 산업안전보건법 제38조\n    - 중대재해처벌법 제4조\n---\n\naudit_exception: safety-os-skill-structure — Safety OS skills use the legal_basis-gated SSOT skill format (validated by scripts\u002Fskill-lifecycle-audit.ts and scripts\u002Fvalidate-skills.ts), not the generic template 5-section\u002F7-frontmatter schema\n\n# HV Cell Formation Electrical Safety Planner Skill\n\n## Overview\n\nHigh-voltage DC electrical-safety planner for lithium-ion cell-formation,\ncharging, aging, and large-format ESS (Energy Storage System) charge\u002F\ndischarge operations — the ELECTRICAL hazard face of battery manufacturing,\ndistinct from the chemical\u002Fthermal face covered by `battery-thermal-runaway-\nprevent`.\n\nThe battery industry anchor\n(`regulations\u002FKR\u002Findustry-regulatory-anchors.yaml` lines 155-164) names\n**전기안전관리법 (ESCA) Article 16 (전기재해 예방을 위한 안전조치)** and\n**ESCA Article 22 (전기안전관리자 선임)** as adjacent laws — cited by ZERO\nexisting battery workflows prior to the `battery-cell-formation-electrical-\nsafety` workflow (Task 21, 2026-08-07). The anchor notes also name\n**산업안전보건법 Article 38 (안전조치 — 감전 위험 방지)** for cell-stack assembly. This skill\noperationalizes those three uncited articles into a deployable safety plan.\n\n## Korean Battery HV Electrical Context\n\n### Why battery HV DC work is distinct\n\n| Factor | AC mains \u002F industrial | Battery formation \u002F ESS |\n|--------|-----------------------|-------------------------|\n| Current type | AC (natural zero-cross) | DC (no zero-cross — arc sustains) |\n| Fault energy | Grid + transformer | Busbar + cell-stack (huge, sustained) |\n| Disconnect | Breaker opens cleanly | DC contactor + fuse, arc lingers |\n| Voltage range | 220 \u002F 380 \u002F 22 kV | 3.5–4.5 V\u002Fcell; packs 400–1500 V DC |\n| Co-located energy | Generally de-energizable | ALWAYS live (cells store energy) |\n| Work type | Install \u002F maintain | Continuous (formation, aging, cycling) |\n\nThe absence of a natural zero-cross in DC means an arc, once struck, does\nnot self-extinguish. DC arc-flash boundary calculations and DC-rated PPE are\nmandatory — standard AC arc-flash suits (tested with an AC zero-cross) do\nnot contain a sustained DC arc.\n\n### Hazard profile (from battery regulatory anchor)\n\n- **ESCA Art 16** (UNCITED by existing WFs) — 전기재해 예방을 위한 안전조치:\n  mandatory electrical-disaster-prevention safety measures\n- **ESCA Art 22** (UNCITED by existing WFs) — 전기안전관리자 선임: Electrical\n  Safety Manager must be appointed and must sign off on HV work\n- **OSHA-KR Article 38** (corrected anchor) — 감전 등 안전조치: electrical-\n  shock hazard prevention\n- **DSSMA Art 5** — 위험물 저장·취급 기술기준 (electrolyte solvent storage,\n  overlapping chemical-energy control)\n\n## Hazard Scenarios Covered\n\n### 1. Cell-formation charger HV DC contact\n\n- First-charge formation at controlled CV\u002FCC (3.5–4.2 V\u002Fcell, string-level\n  100–1000 V DC bus)\n- Manual connection\u002Fdisconnection of formation bars between charger and cell\n  cart\n- Busbar LOTO failure — charger remains energized while operator touches bar\n\n### 2. Aging-room combined electrical + thermal\n\n- Cells held at 40–60 °C for days\u002Fweeks in aging rooms, electrically\n  characterized under load\n- Aging rack bus energized continuously; thermal runaway in one cell can\n  breach adjacent racks (combined thermal + electrical escalation)\n- Door-interlock failure — operator enters energized rack zone\n\n### 3. ESS container arc-flash\n\n- Grid-tie inverter (AC) + HV DC battery string (400–1500 V DC) in one\n  container\n- DC fault during maintenance — massive, sustained arc-flash\n- Standard AC arc-flash PPE insufficient for DC sustained arc\n\n### 4. Cell-level characterization bench\n\n- Probe contact at bench with individual cells under test\n- Small but frequent — repetitive exposure, low-vigilance drift\n\n## HV Electrical Safety Hierarchy (battery-specific)\n\n### 1. Elimination\n\n- Engineer the operator out of the loop — automated formation-bar handling\n  (robotic cart docking) where economically feasible\n- Remote ESS monitoring — minimize container entry during operation\n- Dielectric-barrier cell characterization (no exposed probe tips)\n\n### 2. Engineering controls (preferred over PPE)\n\n- **DC contactor + fast fuse** at every busbar tap — clears DC fault faster\n  than operator can react\n- **Ground-fault detection** on every formation charger (per ESCA Art 16)\n- **Aging-room door interlock** — de-energizes rack bus on door open\n- **ESS container arc-resistant design** — ducts arc plasma away from\n  operator work zone\n- **Insulation monitoring** on ungrounded IT-system battery DC buses\n\n### 3. Administrative controls\n\n- **작업허가서 (work permit)** for any busbar LOTO work per ESCA Art 16\n- **전기안전관리자 sign-off** per ESCA Art 22 — named safety manager must\n  approve the LOTO plan before execution\n- **DC arc-flash boundary calculation** posted on every container\n- **Buddy system** for all ESS-container entry\n- **TBM (tool-box meeting)** before each shift — see shared TBM workflow\n\n### 4. PPE (DC-rated)\n\n- **DC arc-flash suit** rated for the calculated incident energy (NOT an\n  AC-only suit) — typical 40–100 cal\u002Fcm² for ESS work\n- Dielectric gloves (Class 2, 17 kV) with leather over-protectors\n- Arc-rated face shield + balaclava + hearing protection (DC arc blast\n  overpressure)\n- Insulated hand tools (1000 V rated) — no bare metal in the work zone\n\n## Planning Workflow\n\n1. **Work-zone characterization** — formation line \u002F aging room \u002F ESS\n   container; identify every energy source (DC bus, AC inverter, stored cell\n   energy, control-power 24 V)\n2. **DC arc-flash incident-energy calculation** per IEEE 1584 \u002F NFPA 70E\n   (using maximum prospective DC fault current from the cell string)\n3. **Busbar LOTO procedure** — written, energy-isolated, verified absent by\n   meter; DC contactor + physical bus-bar disconnect + ground strap\n4. **Aging-room interlock verification** — door interlock tested, rack-bus\n   de-energization confirmed before entry\n5. **전기안전관리자 sign-off per ESCA Art 22** — named manager reviews and\n   signs the LOTO plan\n6. **PPE selection** — match arc-rated suit to calculated incident energy;\n   verify DC-rated (not AC-only)\n7. **TBM + permit issuance** — tool-box meeting conducted, 작업허가서 issued\n8. **Execution + buddy** — second worker outside the arc-flash boundary with\n   rescue equipment\n9. **Post-work verification** — bus re-energized in sequence, interlocks\n   re-armed, no tools\u002Fdebris in container\n10. **Emergency response plan** — DC-fault rescue (extract without touching\n    energized bus), 119 dispatch, incident reporting per OSHA-KR Art 57\n\n## Output\n\n```json\n{\n  \"plan_id\": \"batt-hvces-2026-08-07-001\",\n  \"site\": \"Battery Plant 2 Formation Hall B\",\n  \"task_type\": \"ess_container_maintenance\",\n  \"dc_bus_voltage_v\": 1250,\n  \"prospective_fault_current_ka\": 35,\n  \"calculated_incident_energy_cal_cm2\": 65,\n  \"arc_flash_boundary_m\": 2.8,\n  \"workers_exposed\": 2,\n  \"energy_sources\": [\"dc_battery_string\", \"ac_inverter_380v\", \"control_24v\"],\n  \"elimination_opportunities\": [\"remote_monitoring_upgrade_q4\"],\n  \"engineering_controls\": {\n    \"dc_contactor_per_busbar_tap\": true,\n    \"ground_fault_detection\": true,\n    \"door_interlock\": \"verified_2026_08_07\",\n    \"insulation_monitoring\": \"IT_system_ungrounded\"\n  },\n  \"administrative\": {\n    \"permit_issued\": true,\n    \"permit_id\": \"WP-2026-08-07-0312\",\n    \"electrical_safety_manager_signoff_per_esca_art22\": true,\n    \"esm_name\": \"전기안전관리자 김안전\",\n    \"tbm_conducted\": true,\n    \"buddy_assigned\": \"worker_2_outside_arc_boundary\"\n  },\n  \"ppe\": {\n    \"arc_flash_suit_rating_cal_cm2\": 75,\n    \"dc_rated\": true,\n    \"dielectric_gloves_class\": 2,\n    \"insulated_tools_1000v\": true\n  },\n  \"rescue_plan_ref\": \"BATT-2-ERP-2026-dc-fault\",\n  \"regulatory_basis\": [\n    \"전기안전관리법 (ESCA) Article 16 — 전기재해 예방을 위한 안전조치\",\n    \"전기안전관리법 (ESCA) Article 22 — 전기안전관리자 선임\",\n    \"산업안전보건법 (OSHA-KR) Article 38 — 감전 등 위해 방지 안전조치\",\n    \"위험물안전관리법 (DSSMA) Article 5 — 위험물 저장·취급 기술기준\",\n    \"중대재해처벌법 (SAPA) Article 4 — 사업주 안전보장 의무\"\n  ],\n  \"acceptance_status\": \"ready_to_execute\"\n}\n```\n\n## Korean-Specific Standards\n\n- **전기안전관리법 (ESCA) Article 16** — 전기재해 예방을 위한 안전조치\n  (mandatory electrical-disaster prevention measures; work-permit for HV\n  work)\n- **전기안전관리법 (ESCA) Article 22** — 전기안전관리자 선임 (Electrical\n  Safety Manager must be appointed; signs off on HV LOTO plans)\n- **산업안전보건법 (OSHA-KR) Article 38** — 감전 등 위해 방지 안전조치 (electrical-shock\n  hazard prevention)\n- **KOSHA 안전검사 합격품** — DC arc-flash suits and dielectric gloves must\n  carry the KOSHA certification mark\n- **119 구조대 연계** — DC-fault rescue requires rapid 119 dispatch; sustained\n  DC arc cannot be interrupted by the victim\n- **Battery-specific**: most Korean cell-formation and ESS facilities operate\n  under a named 전기안전관리자 (per ESCA Art 22) who MUST countersign every\n  HV work permit before execution\n\n## Integration\n\n- **Input from**: battery work-order, formation-line \u002F ESS-container\n  single-line diagram, cell-string fault-current specification\n- **Output to**: `battery-cell-formation-electrical-safety-record.json`\n  (the evidence model for the `battery-cell-formation-electrical-safety`\n  workflow)\n- **Coordinated skills**:\n  - `permit-to-work` (daily) — issues the 작업허가서 that this plan references\n  - `psm-loto` (psm) — generic LOTO procedure; this skill specializes it for\n    DC battery buses (which have no natural zero-cross)\n  - `tool-box-meeting` (TBM) — pre-work briefing record\n- **Escalation**: If DC arc-flash incident energy exceeds 100 cal\u002Fcm² (DC\n  suit ceiling), halt work and re-engineer (move the work to a different\n  busbar tap, or de-energize the string fully). No PPE-only solution exists\n  above that threshold.\n\n## Non-Duplication Justification\n\nvs. `battery-thermal-runaway-prevent` (existing battery WF): that addresses\nthe CHEMICAL\u002FTHERMAL aspect of the cell itself (electrolyte volatility, NMP\nrecovery, thermal-runaway chain) under DSSMA Art 5 + Art 27. This skill\naddresses the ELECTRICAL aspect during formation\u002Faging\u002FESS work, citing\nESCA Art 16 + Art 22 — which the existing WF does NOT cite. The two\ndisciplines (thermal-runaway chemistry vs. HV DC arc-flash) have distinct\nphysics, distinct PPE, and distinct regulatory anchors.\n\nvs. `battery-recycling-hazard-control` (existing battery WF): that addresses\nend-of-life wet-chemical leaching. This skill addresses start-of-life HV\nelectrical formation — entirely different lifecycle phase.\n\nvs. `arc-flash-analyzer` (ehsconst \u002F powergen): that skill addresses AC\narc-flash at industrial mains frequencies (60 Hz, with natural zero-cross).\nIt does NOT cover DC arc-flash from battery strings, where the sustained arc\nfundamentally changes incident-energy calculation and PPE selection.\n\n## Legal Disclaimer\n\n> 자동화 계획 보조. 최종 고전압 안전 조치 결정은 전기안전관리자 + 안전관리자 권한\n> per 전기안전관리법 (ESCA) Article 16 + Article 22 and 산업안전보건법 (OSHA-KR)\n> Article 101. DC arc-flash incident-energy calculations and PPE ratings MUST\n> be verified by a qualified electrical engineer and the named\n> 전기안전관리자 before any energized work begins.\n","audit_exception: safety-os-skill-structure — Safety OS skills use the legal_basis-gated SSOT skill format (validated by scripts\u002Fskill-lifecycle-audit.ts and scripts\u002Fvalidate-skills.ts), not the generic template 5-section\u002F7-frontmatter schema\n\n# HV Cell Formation Electrical Safety Planner Skill\n\n## Overview\n\nHigh-voltage DC electrical-safety planner for lithium-ion cell-formation,\ncharging, aging, and large-format ESS (Energy Storage System) charge\u002F\ndischarge operations — the ELECTRICAL hazard face of battery manufacturing,\ndistinct from the chemical\u002Fthermal face covered by `battery-thermal-runaway-\nprevent`.\n\nThe battery industry anchor\n(`regulations\u002FKR\u002Findustry-regulatory-anchors.yaml` lines 155-164) names\n**전기안전관리법 (ESCA) Article 16 (전기재해 예방을 위한 안전조치)** and\n**ESCA Article 22 (전기안전관리자 선임)** as adjacent laws — cited by ZERO\nexisting battery workflows prior to the `battery-cell-formation-electrical-\nsafety` workflow (Task 21, 2026-08-07). The anchor notes also name\n**산업안전보건법 Article 38 (안전조치 — 감전 위험 방지)** for cell-stack assembly. This skill\noperationalizes those three uncited articles into a deployable safety plan.\n\n## Korean Battery HV Electrical Context\n\n### Why battery HV DC work is distinct\n\n| Factor | AC mains \u002F industrial | Battery formation \u002F ESS |\n|--------|-----------------------|-------------------------|\n| Current type | AC (natural zero-cross) | DC (no zero-cross — arc sustains) |\n| Fault energy | Grid + transformer | Busbar + cell-stack (huge, sustained) |\n| Disconnect | Breaker opens cleanly | DC contactor + fuse, arc lingers |\n| Voltage range | 220 \u002F 380 \u002F 22 kV | 3.5–4.5 V\u002Fcell; packs 400–1500 V DC |\n| Co-located energy | Generally de-energizable | ALWAYS live (cells store energy) |\n| Work type | Install \u002F maintain | Continuous (formation, aging, cycling) |\n\nThe absence of a natural zero-cross in DC means an arc, once struck, does\nnot self-extinguish. DC arc-flash boundary calculations and DC-rated PPE are\nmandatory — standard AC arc-flash suits (tested with an AC zero-cross) do\nnot contain a sustained DC arc.\n\n### Hazard profile (from battery regulatory anchor)\n\n- **ESCA Art 16** (UNCITED by existing WFs) — 전기재해 예방을 위한 안전조치:\n  mandatory electrical-disaster-prevention safety measures\n- **ESCA Art 22** (UNCITED by existing WFs) — 전기안전관리자 선임: Electrical\n  Safety Manager must be appointed and must sign off on HV work\n- **OSHA-KR Article 38** (corrected anchor) — 감전 등 안전조치: electrical-\n  shock hazard prevention\n- **DSSMA Art 5** — 위험물 저장·취급 기술기준 (electrolyte solvent storage,\n  overlapping chemical-energy control)\n\n## Hazard Scenarios Covered\n\n### 1. Cell-formation charger HV DC contact\n\n- First-charge formation at controlled CV\u002FCC (3.5–4.2 V\u002Fcell, string-level\n  100–1000 V DC bus)\n- Manual connection\u002Fdisconnection of formation bars between charger and cell\n  cart\n- Busbar LOTO failure — charger remains energized while operator touches bar\n\n### 2. Aging-room combined electrical + thermal\n\n- Cells held at 40–60 °C for days\u002Fweeks in aging rooms, electrically\n  characterized under load\n- Aging rack bus energized continuously; thermal runaway in one cell can\n  breach adjacent racks (combined thermal + electrical escalation)\n- Door-interlock failure — operator enters energized rack zone\n\n### 3. ESS container arc-flash\n\n- Grid-tie inverter (AC) + HV DC battery string (400–1500 V DC) in one\n  container\n- DC fault during maintenance — massive, sustained arc-flash\n- Standard AC arc-flash PPE insufficient for DC sustained arc\n\n### 4. Cell-level characterization bench\n\n- Probe contact at bench with individual cells under test\n- Small but frequent — repetitive exposure, low-vigilance drift\n\n## HV Electrical Safety Hierarchy (battery-specific)\n\n### 1. Elimination\n\n- Engineer the operator out of the loop — automated formation-bar handling\n  (robotic cart docking) where economically feasible\n- Remote ESS monitoring — minimize container entry during operation\n- Dielectric-barrier cell characterization (no exposed probe tips)\n\n### 2. Engineering controls (preferred over PPE)\n\n- **DC contactor + fast fuse** at every busbar tap — clears DC fault faster\n  than operator can react\n- **Ground-fault detection** on every formation charger (per ESCA Art 16)\n- **Aging-room door interlock** — de-energizes rack bus on door open\n- **ESS container arc-resistant design** — ducts arc plasma away from\n  operator work zone\n- **Insulation monitoring** on ungrounded IT-system battery DC buses\n\n### 3. Administrative controls\n\n- **작업허가서 (work permit)** for any busbar LOTO work per ESCA Art 16\n- **전기안전관리자 sign-off** per ESCA Art 22 — named safety manager must\n  approve the LOTO plan before execution\n- **DC arc-flash boundary calculation** posted on every container\n- **Buddy system** for all ESS-container entry\n- **TBM (tool-box meeting)** before each shift — see shared TBM workflow\n\n### 4. PPE (DC-rated)\n\n- **DC arc-flash suit** rated for the calculated incident energy (NOT an\n  AC-only suit) — typical 40–100 cal\u002Fcm² for ESS work\n- Dielectric gloves (Class 2, 17 kV) with leather over-protectors\n- Arc-rated face shield + balaclava + hearing protection (DC arc blast\n  overpressure)\n- Insulated hand tools (1000 V rated) — no bare metal in the work zone\n\n## Planning Workflow\n\n1. **Work-zone characterization** — formation line \u002F aging room \u002F ESS\n   container; identify every energy source (DC bus, AC inverter, stored cell\n   energy, control-power 24 V)\n2. **DC arc-flash incident-energy calculation** per IEEE 1584 \u002F NFPA 70E\n   (using maximum prospective DC fault current from the cell string)\n3. **Busbar LOTO procedure** — written, energy-isolated, verified absent by\n   meter; DC contactor + physical bus-bar disconnect + ground strap\n4. **Aging-room interlock verification** — door interlock tested, rack-bus\n   de-energization confirmed before entry\n5. **전기안전관리자 sign-off per ESCA Art 22** — named manager reviews and\n   signs the LOTO plan\n6. **PPE selection** — match arc-rated suit to calculated incident energy;\n   verify DC-rated (not AC-only)\n7. **TBM + permit issuance** — tool-box meeting conducted, 작업허가서 issued\n8. **Execution + buddy** — second worker outside the arc-flash boundary with\n   rescue equipment\n9. **Post-work verification** — bus re-energized in sequence, interlocks\n   re-armed, no tools\u002Fdebris in container\n10. **Emergency response plan** — DC-fault rescue (extract without touching\n    energized bus), 119 dispatch, incident reporting per OSHA-KR Art 57\n\n## Output\n\n```json\n{\n  \"plan_id\": \"batt-hvces-2026-08-07-001\",\n  \"site\": \"Battery Plant 2 Formation Hall B\",\n  \"task_type\": \"ess_container_maintenance\",\n  \"dc_bus_voltage_v\": 1250,\n  \"prospective_fault_current_ka\": 35,\n  \"calculated_incident_energy_cal_cm2\": 65,\n  \"arc_flash_boundary_m\": 2.8,\n  \"workers_exposed\": 2,\n  \"energy_sources\": [\"dc_battery_string\", \"ac_inverter_380v\", \"control_24v\"],\n  \"elimination_opportunities\": [\"remote_monitoring_upgrade_q4\"],\n  \"engineering_controls\": {\n    \"dc_contactor_per_busbar_tap\": true,\n    \"ground_fault_detection\": true,\n    \"door_interlock\": \"verified_2026_08_07\",\n    \"insulation_monitoring\": \"IT_system_ungrounded\"\n  },\n  \"administrative\": {\n    \"permit_issued\": true,\n    \"permit_id\": \"WP-2026-08-07-0312\",\n    \"electrical_safety_manager_signoff_per_esca_art22\": true,\n    \"esm_name\": \"전기안전관리자 김안전\",\n    \"tbm_conducted\": true,\n    \"buddy_assigned\": \"worker_2_outside_arc_boundary\"\n  },\n  \"ppe\": {\n    \"arc_flash_suit_rating_cal_cm2\": 75,\n    \"dc_rated\": true,\n    \"dielectric_gloves_class\": 2,\n    \"insulated_tools_1000v\": true\n  },\n  \"rescue_plan_ref\": \"BATT-2-ERP-2026-dc-fault\",\n  \"regulatory_basis\": [\n    \"전기안전관리법 (ESCA) Article 16 — 전기재해 예방을 위한 안전조치\",\n    \"전기안전관리법 (ESCA) Article 22 — 전기안전관리자 선임\",\n    \"산업안전보건법 (OSHA-KR) Article 38 — 감전 등 위해 방지 안전조치\",\n    \"위험물안전관리법 (DSSMA) Article 5 — 위험물 저장·취급 기술기준\",\n    \"중대재해처벌법 (SAPA) Article 4 — 사업주 안전보장 의무\"\n  ],\n  \"acceptance_status\": \"ready_to_execute\"\n}\n```\n\n## Korean-Specific Standards\n\n- **전기안전관리법 (ESCA) Article 16** — 전기재해 예방을 위한 안전조치\n  (mandatory electrical-disaster prevention measures; work-permit for HV\n  work)\n- **전기안전관리법 (ESCA) Article 22** — 전기안전관리자 선임 (Electrical\n  Safety Manager must be appointed; signs off on HV LOTO plans)\n- **산업안전보건법 (OSHA-KR) Article 38** — 감전 등 위해 방지 안전조치 (electrical-shock\n  hazard prevention)\n- **KOSHA 안전검사 합격품** — DC arc-flash suits and dielectric gloves must\n  carry the KOSHA certification mark\n- **119 구조대 연계** — DC-fault rescue requires rapid 119 dispatch; sustained\n  DC arc cannot be interrupted by the victim\n- **Battery-specific**: most Korean cell-formation and ESS facilities operate\n  under a named 전기안전관리자 (per ESCA Art 22) who MUST countersign every\n  HV work permit before execution\n\n## Integration\n\n- **Input from**: battery work-order, formation-line \u002F ESS-container\n  single-line diagram, cell-string fault-current specification\n- **Output to**: `battery-cell-formation-electrical-safety-record.json`\n  (the evidence model for the `battery-cell-formation-electrical-safety`\n  workflow)\n- **Coordinated skills**:\n  - `permit-to-work` (daily) — issues the 작업허가서 that this plan references\n  - `psm-loto` (psm) — generic LOTO procedure; this skill specializes it for\n    DC battery buses (which have no natural zero-cross)\n  - `tool-box-meeting` (TBM) — pre-work briefing record\n- **Escalation**: If DC arc-flash incident energy exceeds 100 cal\u002Fcm² (DC\n  suit ceiling), halt work and re-engineer (move the work to a different\n  busbar tap, or de-energize the string fully). No PPE-only solution exists\n  above that threshold.\n\n## Non-Duplication Justification\n\nvs. `battery-thermal-runaway-prevent` (existing battery WF): that addresses\nthe CHEMICAL\u002FTHERMAL aspect of the cell itself (electrolyte volatility, NMP\nrecovery, thermal-runaway chain) under DSSMA Art 5 + Art 27. This skill\naddresses the ELECTRICAL aspect during formation\u002Faging\u002FESS work, citing\nESCA Art 16 + Art 22 — which the existing WF does NOT cite. The two\ndisciplines (thermal-runaway chemistry vs. HV DC arc-flash) have distinct\nphysics, distinct PPE, and distinct regulatory anchors.\n\nvs. `battery-recycling-hazard-control` (existing battery WF): that addresses\nend-of-life wet-chemical leaching. This skill addresses start-of-life HV\nelectrical formation — entirely different lifecycle phase.\n\nvs. `arc-flash-analyzer` (ehsconst \u002F powergen): that skill addresses AC\narc-flash at industrial mains frequencies (60 Hz, with natural zero-cross).\nIt does NOT cover DC arc-flash from battery strings, where the sustained arc\nfundamentally changes incident-energy calculation and PPE selection.\n\n## Legal Disclaimer\n\n> 자동화 계획 보조. 최종 고전압 안전 조치 결정은 전기안전관리자 + 안전관리자 권한\n> per 전기안전관리법 (ESCA) Article 16 + Article 22 and 산업안전보건법 (OSHA-KR)\n> Article 101. DC arc-flash incident-energy calculations and PPE ratings MUST\n> be verified by a qualified electrical engineer and the named\n> 전기안전관리자 before any energized work begins.\n",{"lang":23,"name":5,"owner":24,"scope":25,"mirror":19,"status":26,"created":27,"version":28,"metadata":29,"description":7,"lang_reason":49,"last_updated":27},"ko","battery-agent","co-safety","active","2026-08-07","1.0.0",{"type":30,"triggers":31,"legal_basis":44},"domain",[32,33,34,35,36,37,38,39,40,41,42,43],"배터리 셀 화성 고전압 안전","cell formation electrical safety","이차전지 충전 에이징 감전","ESS charge discharge arc flash","formation charger grounding","배터리 busbar LOTO","전기안전관리자 선임 배터리","ESCA Article 16 전기재해 예방","ESCA Article 22 battery safety manager","산업안전보건법 Article 38 안전조치 + 안전보건기준에관한규칙 전기 기준","aging room thermal interlock","DC arc flash battery",[45,46,47,48],"전기안전관리법 제16조","전기안전관리법 제22조","산업안전보건법 제38조","중대재해처벌법 제4조","legal","main","1162ccc568cf90c01b3886d6143cbfd851a37883","templates\u002Fco-safety\u002Fskills\u002Fhv-cell-formation-electrical-safety-planner",9,"https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards","https:\u002F\u002Fgithub.com\u002F5throck","Experienced in digital transformation, enterprise IT, startup acceleration, and business strategy. Focused on building practical systems that connect technolo","2026-11-14 21:22:34",{"source":8,"skillName":5,"commands":59,"prompt":69,"zipAvailable":70},[60,63,66],{"tool":61,"command":62},"npx","npx skills add 5throck\u002Fai-workspace-standards --skill hv-cell-formation-electrical-safety-planner",{"tool":64,"command":65},"bunx","bunx skills add 5throck\u002Fai-workspace-standards --skill hv-cell-formation-electrical-safety-planner",{"tool":67,"command":68},"pnpm","pnpm dlx skills add 5throck\u002Fai-workspace-standards --skill hv-cell-formation-electrical-safety-planner","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-safety\u002Fskills\u002Fhv-cell-formation-electrical-safety-planner\u002FSKILL.md",true,[],[73,81,86,91,96,101],{"skillNo":74,"name":75,"nameZh":6,"description":76,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":77,"categories":78,"keywords":79,"publishedAt":80},"01M7BBJDYHJMGTJYSC37JVWY8S","i18n-layout","Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL\u002Fbidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF\u002FBOM issues surface.","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],"2026-11-15 14:19:17",{"skillNo":82,"name":75,"nameZh":6,"description":76,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":83,"categories":84,"keywords":85,"publishedAt":80},"01M7BBJ9XHAAS1AVGKZZ841VBZ","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.hermes\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],{"skillNo":87,"name":75,"nameZh":6,"description":76,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":88,"categories":89,"keywords":90,"publishedAt":80},"01M7BBJ5C3X8TKFKG5R9P9P49W","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.gemini\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],{"skillNo":92,"name":75,"nameZh":6,"description":76,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":93,"categories":94,"keywords":95,"publishedAt":80},"01M7BBJ1B52X0QMJ2QVBMPJB37","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.codex\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],{"skillNo":97,"name":75,"nameZh":6,"description":76,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":98,"categories":99,"keywords":100,"publishedAt":80},"01M7BBHX91BW2Q2R276MRX5AW3","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.claude\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],{"skillNo":102,"name":75,"nameZh":6,"description":76,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":103,"categories":104,"keywords":105,"publishedAt":80},"01M7BBHQWGXPSFRWN1PRC2NMMV","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.agents\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[]]