AGENT SKILL

hv-cell-formation-electrical-safety-planner

Plan high-voltage DC electrical safety for lithium-ion cell formation, charging, aging, and large ESS charge/discharge facilities. Busbar LOTO, formation-charger grounding, aging-room interlock, ESS arc-flash boundary, DC arc-flash PPE selection, 전기안전관리자 sign-off per ESCA Art 22.

License 许可
AGPL-3.0
最近更新
2026-11-14
Stars
★ 25
Forks
9

01 前言 Front Matter

lang
ko
name
hv-cell-formation-electrical-safety-planner
owner
battery-agent
scope
co-safety
mirror
false
status
active
created
2026-08-07
version
1.0.0
metadata
{ "type": "domain", "triggers": [ "배터리 셀 화성 고전압 안전", "cell formation electrical safety", "이차전지 충전 에이징 감전", "ESS charge discharge arc flash", "formation charger grounding", "배터리 busbar LOTO", "전기안전관리자 선임 배터리", "ESCA Article 16 전기재해 예방", "ESCA Article 22 battery safety manager", "산업안전보건법 Article 38 안전조치 + 안전보건기준에관한규칙 전기 기준", "aging room thermal interlock", "DC arc flash battery" ], "legal_basis": [ "전기안전관리법 제16조", "전기안전관리법 제22조", "산업안전보건법 제38조", "중대재해처벌법 제4조" ] }
description
Plan high-voltage DC electrical safety for lithium-ion cell formation, charging, aging, and large ESS charge/discharge facilities. Busbar LOTO, formation-charger grounding, aging-room interlock, ESS arc-flash boundary, DC arc-flash PPE selection, 전기안전관리자 sign-off per ESCA Art 22.
lang_reason
legal
last_updated
2026-08-07

03 SKILL.md 正文

audit_exception: safety-os-skill-structure — Safety OS skills use the legal_basis-gated SSOT skill format (validated by scripts/skill-lifecycle-audit.ts and scripts/validate-skills.ts), not the generic template 5-section/7-frontmatter schema

HV Cell Formation Electrical Safety Planner Skill

Overview

High-voltage DC electrical-safety planner for lithium-ion cell-formation, charging, aging, and large-format ESS (Energy Storage System) charge/ discharge operations — the ELECTRICAL hazard face of battery manufacturing, distinct from the chemical/thermal face covered by battery-thermal-runaway- prevent.

The battery industry anchor (regulations/KR/industry-regulatory-anchors.yaml lines 155-164) names 전기안전관리법 (ESCA) Article 16 (전기재해 예방을 위한 안전조치) and ESCA Article 22 (전기안전관리자 선임) as adjacent laws — cited by ZERO existing battery workflows prior to the battery-cell-formation-electrical- safety workflow (Task 21, 2026-08-07). The anchor notes also name 산업안전보건법 Article 38 (안전조치 — 감전 위험 방지) for cell-stack assembly. This skill operationalizes those three uncited articles into a deployable safety plan.

Korean Battery HV Electrical Context

Why battery HV DC work is distinct

Factor AC mains / industrial Battery formation / ESS
Current type AC (natural zero-cross) DC (no zero-cross — arc sustains)
Fault energy Grid + transformer Busbar + cell-stack (huge, sustained)
Disconnect Breaker opens cleanly DC contactor + fuse, arc lingers
Voltage range 220 / 380 / 22 kV 3.5–4.5 V/cell; packs 400–1500 V DC
Co-located energy Generally de-energizable ALWAYS live (cells store energy)
Work type Install / maintain Continuous (formation, aging, cycling)

The absence of a natural zero-cross in DC means an arc, once struck, does not self-extinguish. DC arc-flash boundary calculations and DC-rated PPE are mandatory — standard AC arc-flash suits (tested with an AC zero-cross) do not contain a sustained DC arc.

Hazard profile (from battery regulatory anchor)

  • ESCA Art 16 (UNCITED by existing WFs) — 전기재해 예방을 위한 안전조치: mandatory electrical-disaster-prevention safety measures
  • ESCA Art 22 (UNCITED by existing WFs) — 전기안전관리자 선임: Electrical Safety Manager must be appointed and must sign off on HV work
  • OSHA-KR Article 38 (corrected anchor) — 감전 등 안전조치: electrical- shock hazard prevention
  • DSSMA Art 5 — 위험물 저장·취급 기술기준 (electrolyte solvent storage, overlapping chemical-energy control)

Hazard Scenarios Covered

1. Cell-formation charger HV DC contact

  • First-charge formation at controlled CV/CC (3.5–4.2 V/cell, string-level 100–1000 V DC bus)
  • Manual connection/disconnection of formation bars between charger and cell cart
  • Busbar LOTO failure — charger remains energized while operator touches bar

2. Aging-room combined electrical + thermal

  • Cells held at 40–60 °C for days/weeks in aging rooms, electrically characterized under load
  • Aging rack bus energized continuously; thermal runaway in one cell can breach adjacent racks (combined thermal + electrical escalation)
  • Door-interlock failure — operator enters energized rack zone

3. ESS container arc-flash

  • Grid-tie inverter (AC) + HV DC battery string (400–1500 V DC) in one container
  • DC fault during maintenance — massive, sustained arc-flash
  • Standard AC arc-flash PPE insufficient for DC sustained arc

4. Cell-level characterization bench

  • Probe contact at bench with individual cells under test
  • Small but frequent — repetitive exposure, low-vigilance drift

HV Electrical Safety Hierarchy (battery-specific)

1. Elimination

  • Engineer the operator out of the loop — automated formation-bar handling (robotic cart docking) where economically feasible
  • Remote ESS monitoring — minimize container entry during operation
  • Dielectric-barrier cell characterization (no exposed probe tips)

2. Engineering controls (preferred over PPE)

  • DC contactor + fast fuse at every busbar tap — clears DC fault faster than operator can react
  • Ground-fault detection on every formation charger (per ESCA Art 16)
  • Aging-room door interlock — de-energizes rack bus on door open
  • ESS container arc-resistant design — ducts arc plasma away from operator work zone
  • Insulation monitoring on ungrounded IT-system battery DC buses

3. Administrative controls

  • 작업허가서 (work permit) for any busbar LOTO work per ESCA Art 16
  • 전기안전관리자 sign-off per ESCA Art 22 — named safety manager must approve the LOTO plan before execution
  • DC arc-flash boundary calculation posted on every container
  • Buddy system for all ESS-container entry
  • TBM (tool-box meeting) before each shift — see shared TBM workflow

4. PPE (DC-rated)

  • DC arc-flash suit rated for the calculated incident energy (NOT an AC-only suit) — typical 40–100 cal/cm² for ESS work
  • Dielectric gloves (Class 2, 17 kV) with leather over-protectors
  • Arc-rated face shield + balaclava + hearing protection (DC arc blast overpressure)
  • Insulated hand tools (1000 V rated) — no bare metal in the work zone

Planning Workflow

  1. Work-zone characterization — formation line / aging room / ESS container; identify every energy source (DC bus, AC inverter, stored cell energy, control-power 24 V)
  2. DC arc-flash incident-energy calculation per IEEE 1584 / NFPA 70E (using maximum prospective DC fault current from the cell string)
  3. Busbar LOTO procedure — written, energy-isolated, verified absent by meter; DC contactor + physical bus-bar disconnect + ground strap
  4. Aging-room interlock verification — door interlock tested, rack-bus de-energization confirmed before entry
  5. 전기안전관리자 sign-off per ESCA Art 22 — named manager reviews and signs the LOTO plan
  6. PPE selection — match arc-rated suit to calculated incident energy; verify DC-rated (not AC-only)
  7. TBM + permit issuance — tool-box meeting conducted, 작업허가서 issued
  8. Execution + buddy — second worker outside the arc-flash boundary with rescue equipment
  9. Post-work verification — bus re-energized in sequence, interlocks re-armed, no tools/debris in container
  10. Emergency response plan — DC-fault rescue (extract without touching energized bus), 119 dispatch, incident reporting per OSHA-KR Art 57

Output

{
  "plan_id": "batt-hvces-2026-08-07-001",
  "site": "Battery Plant 2 Formation Hall B",
  "task_type": "ess_container_maintenance",
  "dc_bus_voltage_v": 1250,
  "prospective_fault_current_ka": 35,
  "calculated_incident_energy_cal_cm2": 65,
  "arc_flash_boundary_m": 2.8,
  "workers_exposed": 2,
  "energy_sources": ["dc_battery_string", "ac_inverter_380v", "control_24v"],
  "elimination_opportunities": ["remote_monitoring_upgrade_q4"],
  "engineering_controls": {
    "dc_contactor_per_busbar_tap": true,
    "ground_fault_detection": true,
    "door_interlock": "verified_2026_08_07",
    "insulation_monitoring": "IT_system_ungrounded"
  },
  "administrative": {
    "permit_issued": true,
    "permit_id": "WP-2026-08-07-0312",
    "electrical_safety_manager_signoff_per_esca_art22": true,
    "esm_name": "전기안전관리자 김안전",
    "tbm_conducted": true,
    "buddy_assigned": "worker_2_outside_arc_boundary"
  },
  "ppe": {
    "arc_flash_suit_rating_cal_cm2": 75,
    "dc_rated": true,
    "dielectric_gloves_class": 2,
    "insulated_tools_1000v": true
  },
  "rescue_plan_ref": "BATT-2-ERP-2026-dc-fault",
  "regulatory_basis": [
    "전기안전관리법 (ESCA) Article 16 — 전기재해 예방을 위한 안전조치",
    "전기안전관리법 (ESCA) Article 22 — 전기안전관리자 선임",
    "산업안전보건법 (OSHA-KR) Article 38 — 감전 등 위해 방지 안전조치",
    "위험물안전관리법 (DSSMA) Article 5 — 위험물 저장·취급 기술기준",
    "중대재해처벌법 (SAPA) Article 4 — 사업주 안전보장 의무"
  ],
  "acceptance_status": "ready_to_execute"
}

Korean-Specific Standards

  • 전기안전관리법 (ESCA) Article 16 — 전기재해 예방을 위한 안전조치 (mandatory electrical-disaster prevention measures; work-permit for HV work)
  • 전기안전관리법 (ESCA) Article 22 — 전기안전관리자 선임 (Electrical Safety Manager must be appointed; signs off on HV LOTO plans)
  • 산업안전보건법 (OSHA-KR) Article 38 — 감전 등 위해 방지 안전조치 (electrical-shock hazard prevention)
  • KOSHA 안전검사 합격품 — DC arc-flash suits and dielectric gloves must carry the KOSHA certification mark
  • 119 구조대 연계 — DC-fault rescue requires rapid 119 dispatch; sustained DC arc cannot be interrupted by the victim
  • Battery-specific: most Korean cell-formation and ESS facilities operate under a named 전기안전관리자 (per ESCA Art 22) who MUST countersign every HV work permit before execution

Integration

  • Input from: battery work-order, formation-line / ESS-container single-line diagram, cell-string fault-current specification
  • Output to: battery-cell-formation-electrical-safety-record.json (the evidence model for the battery-cell-formation-electrical-safety workflow)
  • Coordinated skills:
    • permit-to-work (daily) — issues the 작업허가서 that this plan references
    • psm-loto (psm) — generic LOTO procedure; this skill specializes it for DC battery buses (which have no natural zero-cross)
    • tool-box-meeting (TBM) — pre-work briefing record
  • Escalation: If DC arc-flash incident energy exceeds 100 cal/cm² (DC suit ceiling), halt work and re-engineer (move the work to a different busbar tap, or de-energize the string fully). No PPE-only solution exists above that threshold.

Non-Duplication Justification

vs. battery-thermal-runaway-prevent (existing battery WF): that addresses the CHEMICAL/THERMAL aspect of the cell itself (electrolyte volatility, NMP recovery, thermal-runaway chain) under DSSMA Art 5 + Art 27. This skill addresses the ELECTRICAL aspect during formation/aging/ESS work, citing ESCA Art 16 + Art 22 — which the existing WF does NOT cite. The two disciplines (thermal-runaway chemistry vs. HV DC arc-flash) have distinct physics, distinct PPE, and distinct regulatory anchors.

vs. battery-recycling-hazard-control (existing battery WF): that addresses end-of-life wet-chemical leaching. This skill addresses start-of-life HV electrical formation — entirely different lifecycle phase.

vs. arc-flash-analyzer (ehsconst / powergen): that skill addresses AC arc-flash at industrial mains frequencies (60 Hz, with natural zero-cross). It does NOT cover DC arc-flash from battery strings, where the sustained arc fundamentally changes incident-energy calculation and PPE selection.

Legal Disclaimer

자동화 계획 보조. 최종 고전압 안전 조치 결정은 전기안전관리자 + 안전관리자 권한 per 전기안전관리법 (ESCA) Article 16 + Article 22 and 산업안전보건법 (OSHA-KR) Article 101. DC arc-flash incident-energy calculations and PPE ratings MUST be verified by a qualified electrical engineer and the named 전기안전관리자 before any energized work begins.

04 同仓库更多 Skills

5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25