[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M73FV4P6M93FMT0XPM7TCG13":3,"skill-same:01M73FV4P6M93FMT0XPM7TCG13":70},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":15,"categories":16,"keywords":17,"publishedAt":18,"linkOnly":19,"markdownContent":20,"markdownBody":21,"frontMatter":22,"refName":48,"commitSha":49,"skillDirectory":50,"forksCount":51,"repositoryHtmlUrl":52,"repositoryHomepageUrl":6,"ownerHtmlUrl":53,"ownerBlogUrl":6,"ownerDescription":54,"updatedAt":55,"install":56,"resources":69},"01M73FV4P6M93FMT0XPM7TCG13","construction-permit-overview",null,"Orchestrate full construction\u002Fpermit lifecycle for gas terminal facilities (LNG\u002FLPG\u002F수소) under 3-phase KGS Code inspection: pre-construction technical review, mid-construction inspection, and completion inspection.","5throck\u002Fai-workspace-standards","5throck","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F10958964?v=4","01M73BFEH0V0VS483TW4JD49JW","01M73BFEJ5VQZJHJSFTVPAZGDM",25,"AGPL-3.0","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-safety\u002Fskills\u002Fconstruction-permit-overview\u002FSKILL.md",[],[],"2026-11-11 15:11:14",false,"---\n\nmirror: false\nlang: ko\nlang_reason: legal\nname: construction-permit-overview\nowner: gasterm-agent\nscope: co-safety\nstatus: active\ndescription: >\n  Orchestrate full construction\u002Fpermit lifecycle for gas terminal facilities\n  (LNG\u002FLPG\u002F수소) under 3-phase KGS Code inspection: pre-construction technical\n  review, mid-construction inspection, and completion inspection.\nversion: 1.0.0\ncreated: 2026-07-09\nlast_updated: 2026-07-17\nmetadata:\n  type: domain\n  triggers:\n    - construction permit\n    - permit lifecycle\n    - gas terminal construction\n    - KGS inspection\n    - 가스시설 공사\n    - 공사허가\n    - 검사일정\n    - 건설인허가\n  legal_basis:\n    - 고압가스 안전 관리 및 사업법 제22조의2 (기술검토 등)\n    - 고압가스 안전 관리 및 사업법 시행규칙 제7조 (기술검토 신청 절차)\n    - 액화석유가스의 안전관리 및 사업법 제27조의2, 제45조 (LPG 충전업 안전관리, 검사기준)\n    - 도시가스사업법 제17조의5 (시설·기술·검사 기준 위임)\n---\n\naudit_exception: safety-os-skill-structure — Safety OS skills use the legal_basis-gated SSOT skill format (validated by scripts\u002Fskill-lifecycle-audit.ts and scripts\u002Fvalidate-skills.ts), not the generic template 5-section\u002F7-frontmatter schema\n\n## construction-permit-overview\n\n### Purpose\n\nOrchestrate the complete construction\u002Fpermit lifecycle for gas terminal facilities (LNG\u002FLPG\u002F수소) under the 3-phase KGS Code inspection regime, populating `evidence-models\u002Fdomains\u002Findustry\u002Fgasterm\u002Fgasterm-construction-permit-overview-record.json`. This skill is the sequencing orchestrator — it does not perform the technical review or on-site inspection itself; it dispatches to `pre-construction-technical-review`, `mid-construction-inspection`, and `completion-inspection` in order and tracks phase gating.\n\n### Scope\n\n- Phase 1: Pre-construction technical review (시설·기술 기준 검토) — dispatch to `pre-construction-technical-review`\n- Phase 2: Mid-construction on-site inspection (중간검사) — dispatch to `mid-construction-inspection`, gated on Phase 1 `passed`\n- Phase 3: Completion inspection and permit issuance (완성검사) — dispatch to `completion-inspection`, gated on Phase 2 `passed`\n- Inspection scheduling and cross-phase documentation management\n- Overall project status tracking (`overall_status`, `permit_status`)\n\n### Legal Basis\n\n| Law | Article | Requirement |\n|-----|---------|-------------|\n| 고압가스 안전 관리 및 사업법 | Article 22의2 | 기술검토 (technical review of facility\u002Finstallation) |\n| 고압가스 안전 관리 및 사업법 시행규칙 | Article 7 | 기술검토 신청 절차 |\n| 액화석유가스의 안전관리 및 사업법 | Articles 27의2, 45 | LPG 충전업 안전관리, 검사 기준 |\n| 도시가스사업법 | Article 17의5 | 시설·기술·검사 기준 위임 |\n| KGS Code | — | Comprehensive gas facility safety code (phase-specific KGS AC\u002FFA\u002FFP series) |\n\n### Related Skills\n\n- **`pre-construction-technical-review`** — Phase 1, dispatched first. Result feeds `phases.pre_review`.\n- **`mid-construction-inspection`** — Phase 2, dispatched only when `phases.pre_review.status == passed`. Result feeds `phases.mid_inspection`.\n- **`completion-inspection`** — Phase 3, dispatched only when `phases.mid_inspection.status == passed`. Result feeds `phases.completion`.\n\n### Workflow\n\n1. **Project Intake** — Assign `record_id` (`GTRM-CPOV-YYYY-####`), `project_id`, `facility_type` (LNG_terminal\u002FLPG_charging\u002Fhydrogen_charging\u002Fcity_gas_storage\u002Fpipe_transfer), `gas_type`, and `psm_applicable` (true for large-scale terminals per OSHA-KR Article 44).\n2. **Phase 1 Dispatch** — Dispatch `pre-construction-technical-review`. Set `phases.pre_review.status = in_progress`, then update to `passed`\u002F`failed` on result; record `phases.pre_review.result_id` referencing the resulting `gasterm-pre-construction-review-record.json` `record_id`.\n3. **Gate Check** — Do not proceed to Phase 2 unless `phases.pre_review.status == passed`. If `failed` or `supplement_required` from the underlying review, halt and set `overall_status = on_hold`.\n4. **Phase 2 Dispatch** — Dispatch `mid-construction-inspection`, passing `pre_construction_review_id`. Set `phases.mid_inspection.status`; record `result_id`.\n5. **Gate Check** — Do not proceed to Phase 3 unless `phases.mid_inspection.status == passed`.\n6. **Phase 3 Dispatch** — Dispatch `completion-inspection`, passing `mid_construction_inspection_id`. Set `phases.completion.status`; record `result_id`.\n7. **Permit Tracking** — Track `permit_status` (not_applied\u002Fapplied\u002Fgranted\u002Frejected) and `local_government` (관할 지자체) throughout; local government permit issuance is authoritative, KGS technical review\u002Finspection results are the supporting basis.\n8. **Closure** — When all three phases are `passed` and `permit_status == granted`, set `overall_status = completed`. Hand off to routine gasterm operational monitoring (gasterm inspection-record, periodic KGS inspection cadence).\n9. **Non-conformance** — Any phase `failed` sets `overall_status = failed`; escalate to PM (CSO) per gasterm-agent Escalation Triggers (KGS 검사 불합격 → 시설 운영 중지).\n\n### Inputs\n\n- Facility design documentation\n- Construction permit application\n- Contractor qualifications\n- Phase-level result records (`gasterm-pre-construction-review-record.json`, `gasterm-mid-construction-inspection-record.json`, `gasterm-completion-inspection-record.json`)\n\n### Outputs\n\n`gasterm-construction-permit-overview-record.json`-conformant record including:\n- `phases.{pre_review,mid_inspection,completion}` status and cross-referenced `result_id`\n- `permit_status`, `local_government`, `overall_status`\n- `legal_basis` (>= 3 sources, drawn from the table above)\n- Non-conformance escalation record if any phase fails or a required field is missing\n","audit_exception: safety-os-skill-structure — Safety OS skills use the legal_basis-gated SSOT skill format (validated by scripts\u002Fskill-lifecycle-audit.ts and scripts\u002Fvalidate-skills.ts), not the generic template 5-section\u002F7-frontmatter schema\n\n## construction-permit-overview\n\n### Purpose\n\nOrchestrate the complete construction\u002Fpermit lifecycle for gas terminal facilities (LNG\u002FLPG\u002F수소) under the 3-phase KGS Code inspection regime, populating `evidence-models\u002Fdomains\u002Findustry\u002Fgasterm\u002Fgasterm-construction-permit-overview-record.json`. This skill is the sequencing orchestrator — it does not perform the technical review or on-site inspection itself; it dispatches to `pre-construction-technical-review`, `mid-construction-inspection`, and `completion-inspection` in order and tracks phase gating.\n\n### Scope\n\n- Phase 1: Pre-construction technical review (시설·기술 기준 검토) — dispatch to `pre-construction-technical-review`\n- Phase 2: Mid-construction on-site inspection (중간검사) — dispatch to `mid-construction-inspection`, gated on Phase 1 `passed`\n- Phase 3: Completion inspection and permit issuance (완성검사) — dispatch to `completion-inspection`, gated on Phase 2 `passed`\n- Inspection scheduling and cross-phase documentation management\n- Overall project status tracking (`overall_status`, `permit_status`)\n\n### Legal Basis\n\n| Law | Article | Requirement |\n|-----|---------|-------------|\n| 고압가스 안전 관리 및 사업법 | Article 22의2 | 기술검토 (technical review of facility\u002Finstallation) |\n| 고압가스 안전 관리 및 사업법 시행규칙 | Article 7 | 기술검토 신청 절차 |\n| 액화석유가스의 안전관리 및 사업법 | Articles 27의2, 45 | LPG 충전업 안전관리, 검사 기준 |\n| 도시가스사업법 | Article 17의5 | 시설·기술·검사 기준 위임 |\n| KGS Code | — | Comprehensive gas facility safety code (phase-specific KGS AC\u002FFA\u002FFP series) |\n\n### Related Skills\n\n- **`pre-construction-technical-review`** — Phase 1, dispatched first. Result feeds `phases.pre_review`.\n- **`mid-construction-inspection`** — Phase 2, dispatched only when `phases.pre_review.status == passed`. Result feeds `phases.mid_inspection`.\n- **`completion-inspection`** — Phase 3, dispatched only when `phases.mid_inspection.status == passed`. Result feeds `phases.completion`.\n\n### Workflow\n\n1. **Project Intake** — Assign `record_id` (`GTRM-CPOV-YYYY-####`), `project_id`, `facility_type` (LNG_terminal\u002FLPG_charging\u002Fhydrogen_charging\u002Fcity_gas_storage\u002Fpipe_transfer), `gas_type`, and `psm_applicable` (true for large-scale terminals per OSHA-KR Article 44).\n2. **Phase 1 Dispatch** — Dispatch `pre-construction-technical-review`. Set `phases.pre_review.status = in_progress`, then update to `passed`\u002F`failed` on result; record `phases.pre_review.result_id` referencing the resulting `gasterm-pre-construction-review-record.json` `record_id`.\n3. **Gate Check** — Do not proceed to Phase 2 unless `phases.pre_review.status == passed`. If `failed` or `supplement_required` from the underlying review, halt and set `overall_status = on_hold`.\n4. **Phase 2 Dispatch** — Dispatch `mid-construction-inspection`, passing `pre_construction_review_id`. Set `phases.mid_inspection.status`; record `result_id`.\n5. **Gate Check** — Do not proceed to Phase 3 unless `phases.mid_inspection.status == passed`.\n6. **Phase 3 Dispatch** — Dispatch `completion-inspection`, passing `mid_construction_inspection_id`. Set `phases.completion.status`; record `result_id`.\n7. **Permit Tracking** — Track `permit_status` (not_applied\u002Fapplied\u002Fgranted\u002Frejected) and `local_government` (관할 지자체) throughout; local government permit issuance is authoritative, KGS technical review\u002Finspection results are the supporting basis.\n8. **Closure** — When all three phases are `passed` and `permit_status == granted`, set `overall_status = completed`. Hand off to routine gasterm operational monitoring (gasterm inspection-record, periodic KGS inspection cadence).\n9. **Non-conformance** — Any phase `failed` sets `overall_status = failed`; escalate to PM (CSO) per gasterm-agent Escalation Triggers (KGS 검사 불합격 → 시설 운영 중지).\n\n### Inputs\n\n- Facility design documentation\n- Construction permit application\n- Contractor qualifications\n- Phase-level result records (`gasterm-pre-construction-review-record.json`, `gasterm-mid-construction-inspection-record.json`, `gasterm-completion-inspection-record.json`)\n\n### Outputs\n\n`gasterm-construction-permit-overview-record.json`-conformant record including:\n- `phases.{pre_review,mid_inspection,completion}` status and cross-referenced `result_id`\n- `permit_status`, `local_government`, `overall_status`\n- `legal_basis` (>= 3 sources, drawn from the table above)\n- Non-conformance escalation record if any phase fails or a required field is missing\n",{"lang":23,"name":5,"owner":24,"scope":25,"mirror":19,"status":26,"created":27,"version":28,"metadata":29,"description":45,"lang_reason":46,"last_updated":47},"ko","gasterm-agent","co-safety","active",1783555200000,"1.0.0",{"type":30,"triggers":31,"legal_basis":40},"domain",[32,33,34,35,36,37,38,39],"construction permit","permit lifecycle","gas terminal construction","KGS inspection","가스시설 공사","공사허가","검사일정","건설인허가",[41,42,43,44],"고압가스 안전 관리 및 사업법 제22조의2 (기술검토 등)","고압가스 안전 관리 및 사업법 시행규칙 제7조 (기술검토 신청 절차)","액화석유가스의 안전관리 및 사업법 제27조의2, 제45조 (LPG 충전업 안전관리, 검사기준)","도시가스사업법 제17조의5 (시설·기술·검사 기준 위임)","Orchestrate full construction\u002Fpermit lifecycle for gas terminal facilities (LNG\u002FLPG\u002F수소) under 3-phase KGS Code inspection: pre-construction technical review, mid-construction inspection, and completion inspection.\n","legal",1784246400000,"main","1162ccc568cf90c01b3886d6143cbfd851a37883","templates\u002Fco-safety\u002Fskills\u002Fconstruction-permit-overview",9,"https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards","https:\u002F\u002Fgithub.com\u002F5throck","Experienced in digital transformation, enterprise IT, startup acceleration, and business strategy. Focused on building practical systems that connect technolo","2026-11-14 21:22:34",{"source":8,"skillName":5,"commands":57,"prompt":67,"zipAvailable":68},[58,61,64],{"tool":59,"command":60},"npx","npx skills add 5throck\u002Fai-workspace-standards --skill construction-permit-overview",{"tool":62,"command":63},"bunx","bunx skills add 5throck\u002Fai-workspace-standards --skill construction-permit-overview",{"tool":65,"command":66},"pnpm","pnpm dlx skills add 5throck\u002Fai-workspace-standards --skill construction-permit-overview","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-safety\u002Fskills\u002Fconstruction-permit-overview\u002FSKILL.md",true,[],[71,79,84,89,94,99],{"skillNo":72,"name":73,"nameZh":6,"description":74,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":75,"categories":76,"keywords":77,"publishedAt":78},"01M7BBJDYHJMGTJYSC37JVWY8S","i18n-layout","Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL\u002Fbidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF\u002FBOM issues surface.","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],"2026-11-15 14:19:17",{"skillNo":80,"name":73,"nameZh":6,"description":74,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":81,"categories":82,"keywords":83,"publishedAt":78},"01M7BBJ9XHAAS1AVGKZZ841VBZ","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.hermes\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],{"skillNo":85,"name":73,"nameZh":6,"description":74,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":86,"categories":87,"keywords":88,"publishedAt":78},"01M7BBJ5C3X8TKFKG5R9P9P49W","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.gemini\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],{"skillNo":90,"name":73,"nameZh":6,"description":74,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":91,"categories":92,"keywords":93,"publishedAt":78},"01M7BBJ1B52X0QMJ2QVBMPJB37","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.codex\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],{"skillNo":95,"name":73,"nameZh":6,"description":74,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":96,"categories":97,"keywords":98,"publishedAt":78},"01M7BBHX91BW2Q2R276MRX5AW3","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.claude\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[],{"skillNo":100,"name":73,"nameZh":6,"description":74,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":9,"repositoryNo":12,"starsCount":13,"licenseSpdxId":14,"licenseFileUrl":6,"sourceHtmlUrl":101,"categories":102,"keywords":103,"publishedAt":78},"01M7BBHQWGXPSFRWN1PRC2NMMV","https:\u002F\u002Fgithub.com\u002F5throck\u002Fai-workspace-standards\u002Fblob\u002Fmain\u002Ftemplates\u002Fco-work\u002F.agents\u002Fskills\u002Fi18n-layout\u002FSKILL.md",[],[]]