construction-permit-overview
Orchestrate full construction/permit lifecycle for gas terminal facilities (LNG/LPG/수소) under 3-phase KGS Code inspection: pre-construction technical review, mid-construction inspection, and completion inspection.
- License 许可
- AGPL-3.0
- 最近更新
- 2026-11-14
- Stars
- ★ 25
- Forks
- 9
01 前言 Front Matter
- lang
- ko
- name
- construction-permit-overview
- owner
- gasterm-agent
- scope
- co-safety
- mirror
- false
- status
- active
- created
- 1783555200000
- version
- 1.0.0
- metadata
- { "type": "domain", "triggers": [ "construction permit", "permit lifecycle", "gas terminal construction", "KGS inspection", "가스시설 공사", "공사허가", "검사일정", "건설인허가" ], "legal_basis": [ "고압가스 안전 관리 및 사업법 제22조의2 (기술검토 등)", "고압가스 안전 관리 및 사업법 시행규칙 제7조 (기술검토 신청 절차)", "액화석유가스의 안전관리 및 사업법 제27조의2, 제45조 (LPG 충전업 안전관리, 검사기준)", "도시가스사업법 제17조의5 (시설·기술·검사 기준 위임)" ] }
- description
- Orchestrate full construction/permit lifecycle for gas terminal facilities (LNG/LPG/수소) under 3-phase KGS Code inspection: pre-construction technical review, mid-construction inspection, and completion inspection.
- lang_reason
- legal
- last_updated
- 1784246400000
03 SKILL.md 正文
audit_exception: safety-os-skill-structure — Safety OS skills use the legal_basis-gated SSOT skill format (validated by scripts/skill-lifecycle-audit.ts and scripts/validate-skills.ts), not the generic template 5-section/7-frontmatter schema
construction-permit-overview
Purpose
Orchestrate the complete construction/permit lifecycle for gas terminal facilities (LNG/LPG/수소) under the 3-phase KGS Code inspection regime, populating evidence-models/domains/industry/gasterm/gasterm-construction-permit-overview-record.json. This skill is the sequencing orchestrator — it does not perform the technical review or on-site inspection itself; it dispatches to pre-construction-technical-review, mid-construction-inspection, and completion-inspection in order and tracks phase gating.
Scope
- Phase 1: Pre-construction technical review (시설·기술 기준 검토) — dispatch to
pre-construction-technical-review - Phase 2: Mid-construction on-site inspection (중간검사) — dispatch to
mid-construction-inspection, gated on Phase 1passed - Phase 3: Completion inspection and permit issuance (완성검사) — dispatch to
completion-inspection, gated on Phase 2passed - Inspection scheduling and cross-phase documentation management
- Overall project status tracking (
overall_status,permit_status)
Legal Basis
| Law | Article | Requirement |
|---|---|---|
| 고압가스 안전 관리 및 사업법 | Article 22의2 | 기술검토 (technical review of facility/installation) |
| 고압가스 안전 관리 및 사업법 시행규칙 | Article 7 | 기술검토 신청 절차 |
| 액화석유가스의 안전관리 및 사업법 | Articles 27의2, 45 | LPG 충전업 안전관리, 검사 기준 |
| 도시가스사업법 | Article 17의5 | 시설·기술·검사 기준 위임 |
| KGS Code | — | Comprehensive gas facility safety code (phase-specific KGS AC/FA/FP series) |
Related Skills
pre-construction-technical-review— Phase 1, dispatched first. Result feedsphases.pre_review.mid-construction-inspection— Phase 2, dispatched only whenphases.pre_review.status == passed. Result feedsphases.mid_inspection.completion-inspection— Phase 3, dispatched only whenphases.mid_inspection.status == passed. Result feedsphases.completion.
Workflow
- Project Intake — Assign
record_id(GTRM-CPOV-YYYY-####),project_id,facility_type(LNG_terminal/LPG_charging/hydrogen_charging/city_gas_storage/pipe_transfer),gas_type, andpsm_applicable(true for large-scale terminals per OSHA-KR Article 44). - Phase 1 Dispatch — Dispatch
pre-construction-technical-review. Setphases.pre_review.status = in_progress, then update topassed/failedon result; recordphases.pre_review.result_idreferencing the resultinggasterm-pre-construction-review-record.jsonrecord_id. - Gate Check — Do not proceed to Phase 2 unless
phases.pre_review.status == passed. Iffailedorsupplement_requiredfrom the underlying review, halt and setoverall_status = on_hold. - Phase 2 Dispatch — Dispatch
mid-construction-inspection, passingpre_construction_review_id. Setphases.mid_inspection.status; recordresult_id. - Gate Check — Do not proceed to Phase 3 unless
phases.mid_inspection.status == passed. - Phase 3 Dispatch — Dispatch
completion-inspection, passingmid_construction_inspection_id. Setphases.completion.status; recordresult_id. - Permit Tracking — Track
permit_status(not_applied/applied/granted/rejected) andlocal_government(관할 지자체) throughout; local government permit issuance is authoritative, KGS technical review/inspection results are the supporting basis. - Closure — When all three phases are
passedandpermit_status == granted, setoverall_status = completed. Hand off to routine gasterm operational monitoring (gasterm inspection-record, periodic KGS inspection cadence). - Non-conformance — Any phase
failedsetsoverall_status = failed; escalate to PM (CSO) per gasterm-agent Escalation Triggers (KGS 검사 불합격 → 시설 운영 중지).
Inputs
- Facility design documentation
- Construction permit application
- Contractor qualifications
- Phase-level result records (
gasterm-pre-construction-review-record.json,gasterm-mid-construction-inspection-record.json,gasterm-completion-inspection-record.json)
Outputs
gasterm-construction-permit-overview-record.json-conformant record including:
phases.{pre_review,mid_inspection,completion}status and cross-referencedresult_idpermit_status,local_government,overall_statuslegal_basis(>= 3 sources, drawn from the table above)- Non-conformance escalation record if any phase fails or a required field is missing
04 同仓库更多 Skills
i18n-layout
Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.
i18n-layout
Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.
i18n-layout
Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.
i18n-layout
Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.
i18n-layout
Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.
i18n-layout
Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.